  16   Sun Jul 31 15:56:32 2016 SarahDEED16 Alpha calibration checks (205169)***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
  
  14   Sun Jul 31 14:32:34 2016 SarahDEED1 Alpha calibration checks (205168) DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
  
  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulserChanged from LiF 4 to LiF 3 after running
with LiF 4 overnight (run title on n_TOF
DAQ was not updated to refelect the change,
  
  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser SettingThe pulser has been switched from triggering
from beam trigger to running at a 10 Hz rate,
and will now appear in random places in signal
  
  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 1.75 microsecond delay from gamma flash
  
  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 11 microsecond delay from gamma flash to
  
  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target SeparationIncreased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one
 17x 
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERNBox 1

1. RC412 Cables

2. Screws and parts for rails
  
  92   Wed Jul 16 11:45:39 2025 SelinBoron Spectra Update After Setting Change + Pulser RemovedUncalibrated amplitude spectra of Boron
(run221188) after the settings were changed,
the pulser was removed, and the threshold
 B_Strip2_ded.pngB_Strip19_ded.png 
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement21:15 Changed from detectors in-beam to
boron-10 sample 3 in-beam (in-beam measurement
got 1000 triggers, 500 of which were dedicated).
 14x 
  82   Tue Mar 18 13:28:30 2025 EmmanuelB10 and LiF data with Fast Fourier TransformAttached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants.
 B10.pdfLi.pdf 
  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2Photographs of assembly up to the first
pulser test with LiF3.
 25x 
  13   Sun Jul 31 13:43:56 2016 SarahAlpha spectra Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
 DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe 
  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM   23x 
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set upPhtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
 15x 
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  76   Thu Sep 12 11:07:29 2024 Nick40K Borrowed ItemsWe borrowed from n_TOF:

1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small
  
  80   Mon Sep 16 12:36:45 2024 TD34-way IDC to 37-way D connector ribbon cables
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha
 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg 
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al ProtonsHere is a Google spreadsheet for counting
protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
  