Message ID: 768
Entry time: Wed Nov 7 01:00:58 2018
|
Author: |
CA, CB, TD, OH, PJW |
Subject: |
Wednesday 7 November |
|
|
10.02 DAQ still running, on file Oct18/R27_9
Merger and TapeServer ok, no error warnings in terminals
10.07 Good event statistics ok, except nnaida6 rate being high (attachment 1)
nnaida17 rate ok, but counts very high. May have run fast at some point overnight.
System wide checks ok, except nnaida7 failure in ADC calibration
FEE64 temperatures ok (attachment 2)
10.13 Bias/leakage currents slightly higher, but ok (attachment 3)
10:30 1.8.W spectra (attachment 4)
11.10 Stopped the DAQ (R27_9)
Checked ASIC control - ok
Started the DAQ again (Oct18/R28_0)
good event statistics ok, aside from nnaida6 running slightly fast (attachment 5)
15.07 DAQ stop - file Oct18/R28_2
Detector bias OFF
Move AIDA downstream to check position of Clover G7
16.05 Move back upstream into BRIKEN (CH2)n moderator assembly
Detector bias ON
16.12 all system wide checks OK *except* nnaida7 fails ADC calibration
sync all ASIC clocks using ReSYNC
detector biases & leakage currents OK - see attachments 6 & 7
FEE64 temperatures OK - see attachment 8
good event statistics OK *except* nnaida2 - see attachment 9
see attachment 10 for comparison to statistics 5.1.18
16.41 1.8.W spectra 20us FSR - see attachments 11 & 12
16.55 slow comparator thresholds raised from 10 to 100
DAQ start (Oct18/R29_0)
Merger and TapeServer ok - no error warnings in terminals
good event statistics ok, except nnaida6 running fast (attachment 13)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|