|
ID |
Date |
Author |
Subject |
Text |
 |
|
138
|
Thu Jan 7 13:55:24 2016 |
CG | RIKEN progress - 15/12/15 (late) | Tues 15/12/15
Swapped previously tripped detector
(3131-11) on to kaptons already in place |
 |
|
137
|
Wed Jan 6 16:06:32 2016 |
CG, TD, PJCS | Report: Low - RPi power cable can't be fully inserted due to case conflict - solved |
|
|
|
136
|
Tue Dec 15 11:17:05 2015 |
TD | STFC DL tests - 14-15.12.15 | BNC PB-5 Pulser
Fall time 1.0ms
|
13x |
|
135
|
Mon Dec 14 19:25:35 2015 |
AE, CG ,Phong | Merger/TapeServer trouble report | Sat. 12/12/15
Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). |
    |
|
134
|
Mon Dec 14 07:56:27 2015 |
CG | RIKEN progress | 13/12/15
Current jumper setup:
- detector |
10x |
|
133
|
Sat Dec 12 03:30:50 2015 |
Alfred, Chris, Phong | change configuration of NNAIDA modules in setup | We want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from |
|
|
132
|
Sat Dec 12 02:12:17 2015 |
CG, AE, VH | RIKEN progress | Stripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and |
9x |
|
131
|
Thu Dec 10 04:56:08 2015 |
CG, AE | RIKEN progress - first day and a half | 08/12/15 - Day 0.5
Test fitted new snout to snout base
- the holes |
 |
|
130
|
Thu Dec 3 16:28:46 2015 |
CG, TD | New Kapton cable tests at DL | Spent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance |
18x |
|
129
|
Thu Dec 3 10:12:08 2015 |
CG, TD | Report: Low - RPi power cable can't be fully inserted due to case conflict | The RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic |
|
|
128
|
Wed Dec 2 18:39:44 2015 |
CG | New Kapton cable tests at DL | Powered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to |
  |
|
127
|
Thu Nov 26 16:32:52 2015 |
CG, TD | New Kapton cable tests at DL | Powered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room |
9x |
|
126
|
Wed Nov 25 19:24:39 2015 |
CG, TD, PJCS | New Kapton cable tests at DL | Powered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra |
6x |
|
125
|
Fri Nov 20 16:29:49 2015 |
CG | New Kapton cable tests at DL | Powered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC. |
|
|
124
|
Thu Nov 19 17:31:24 2015 |
CG, TD | New Kapton cable tests at DL | Powered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC. |
 |
|
123
|
Thu Nov 19 12:23:03 2015 |
CG, TD | Report: Low - Error message when selecting Act on all FEE64s for FADC calibrate | When trying to calibrate FADCs in FADC
Align and Control page, ticked 'Act on ALL
FEE64 modules'. |
|
|
122
|
Thu Nov 19 12:19:15 2015 |
CG, TD | Report: Low - nnaida12 ASIC4 not functioning | Current nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all. |
 |
|
121
|
Wed Nov 18 18:18:26 2015 |
CG, TD | New Kapton cable tests at DL | Note: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain. |
    |
|
120
|
Sat Nov 14 20:19:43 2015 |
CG, TD, PJCS | 13 Nov 2015 - new Kapton cable tests at DL |
|
|
|
119
|
Fri Nov 13 16:17:14 2015 |
CG, TD | 13 Nov 2015 - new Kapton cable tests at DL | Powered system up with 4 bare 45cm kaptons
connected and nothing seems to have changed
from where we left last night |
6x |