AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 26 of 46  ELOG logo
ID Date Authorup Subject Text Attachments
  203   Wed May 4 03:01:15 2016 TDWednesday 4 May 2016
10.30 Power up.
Normal DAQ startup.
 11x 
  204   Wed May 4 06:35:08 2016 TD[How To] Save AIDA Settings & Options
From 'Control' tab select 'Save/Restore Settings'
  
  205   Wed May 4 07:04:12 2016 TDWAVE statistics
AIDA wave statistics
 13x 
  206   Wed May 4 14:33:34 2016 TDmerge/tapeserver issues
Reboot aidas1
Power cycle FEE64s
 230.png231.png232.pngGS_configuration 
  207   Wed May 4 14:45:09 2016 TDmerge/tapeserver issues
TapeServer issue fixed - disk incorrectly
mounted following reboot
  
  208   Thu May 5 07:55:32 2016 TD[How To] Mount SAS and USB disks
*******************************************************************************************************
UPDATE 24 May 2016
 301.png302.png 
  209   Thu May 5 08:12:14 2016 TDCurrent AIDA settings and options
Current AIDA settings DB Key: 2016May03-20.44.33
 303.png 
  210   Thu May 5 08:30:00 2016 TD[How To] Set MACB Trigger Output Mode
From the 'AIDA Control' tab select 'Local
Controls'
 304.png 
  211   Thu May 5 08:47:49 2016 TD[How To] Mask Fast DiscriminatorsFrom the 'AIDA Control' tab select 'Discriminator
control'
 305.png 
  212   Thu May 5 09:52:20 2016 TDMERGE test OK
Slow comparator 0x10 -> 0x20
Fast comparator LEC/MEC 0x10 -> 0xff
 7x 
  228   Mon May 23 07:28:38 2016 TD23 May 201612.45 Rly16 'Sequence ALL On' operational

15.20 Startup remote control of CAEN N1419
 25x 
  231   Tue May 24 00:06:26 2016 TD24 May 2016Overnight. DAQ stopped. Detector bias off.
FEE power and recirculating chiller on.
 1.png2.png3.png4.png5.png 
  233   Tue May 24 07:12:30 2016 TD3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration
The 3x WDC WD30EFRX ATA 3Tb disks installed
in aidas1 in April 2015 (formerly /data20,
 9x 
  242   Fri May 27 11:10:37 2016 TD[How To] Startup AIDA1) Start Julabo FL11006 Recirculating Chiller

   See manual (page 19)  http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
 34x 
  243   Fri May 27 11:16:40 2016 TD[How To] Start and Stop RunsAll AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
 7x 
  246   Sun May 29 10:31:59 2016 TDnnaida19 'H' histogramming enabled indicator dispappears following DAQ start18.30 Options for nnaida19 and a.n.other (working)
FEE (nnaida18)
 60.png61.png 
  255   Mon May 30 03:58:10 2016 TDpeakfind not working on aidas1
Peakfind appears not to be working on aidas1
- example spectrum attached
 1.5.L.msf 
  264   Wed Jun 1 01:32:04 2016 TDCo/Bi source run (R19)
09.18 R19 (AIDA) stopped 
      AIDA SYNC lost for most (but not all)
 110.png111.png 
  265   Wed Jun 1 01:33:58 2016 TDWednesday 1 June 201609.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
 9x 
  266   Wed Jun 1 07:49:45 2016 TDDetector noise - state of playScreenshots of ASIC#1 waveforms for each side
of each of the DSSSD #1 - #6 are attached.
 10x 
ELOG V3.1.4-unknown