AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 3 of 46  ELOG logo
ID Date Authorup Subject Text Attachments
  28   Fri Jan 30 15:27:35 2015 Alfredo Estrade[Analysis] 207Bi source (R61): check of monitor spectra
A first look at the data from the 207Bi source
(run described in previous elog entry, ID
 7x 
  22   Thu Jan 22 13:50:33 2015 Alfredo and TomFurther measurements with filtered PSUJan 20, 2015

Test settings: DSSD biased at 100V, with
  
  23   Thu Jan 22 14:26:10 2015 Alfredo and Tom[DATA] R49: alpha background radioactivityJan20-21, 2015

 ASIC_settings_Jan20_2015.pngR49few_a_bckgrnd_multiplicity.pngR49few_a_bckgrnd_xy.pngR49few_a_bckgrnd_dt_event.pngR49few_a_bckgrnd_EfEb.png 
  784   Wed Nov 14 14:46:47 2018 CAThursday 15th November 00:00 - 08:0023.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7
 25x 
  790   Fri Nov 16 06:01:47 2018 CAHigh Energy Channel Ex vs Ey for different degrader thicknesses15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png 
  805   Sun May 19 02:21:43 2019 CATests of low energy calibration on Alpha Data10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
 25x 
  840   Thu Jun 13 05:49:37 2019 CAFurther tests of calibration on Alpha dataAlpha data used: /May19/{R1,R2,R7,R8,R9,R11}
(c. 380 hr.)
 27x 
  845   Sun Jun 16 04:50:03 2019 CATests of calibration on beta dataAnalysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
 25x 
  853   Tue Jun 18 16:14:03 2019 CAWednesday 19 June 00.00 - 08.00 shift00.00 Shift Change

      DAQ continues ok 
 32x 
  859   Fri Jun 21 01:08:35 2019 CA, CBFriday 21 June09.08 all system wide checks okay *except*
naida7 fails adc calibration
      mismatch between sync pulses received
 21junSync.png20june_2319_temps.png21jun_bias.png 
  844   Sun Jun 16 04:09:40 2019 CA, CB, ML, TD, CGSunday 16 June noon-midnight12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
 16x 
  856   Thu Jun 20 02:37:55 2019 CA, CB, TD, CG, DKThursday 20 June10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
 23x 
  835   Mon Jun 10 01:43:16 2019 CA, CB, TD, CG, OH, DKMonday 10 June09:45 DAQ continues ok 

      all system wide checks OK *except*
 19x 
  836   Mon Jun 10 07:39:35 2019 CA, CB, TD, CG, OH, DKVarying per DSSSD slow comparator thresholds
DSSSDs #1-6 slow comparator 0xa = 100keV
- attachments 1-4
 32x 
  837   Tue Jun 11 01:45:55 2019 CA, CB, TD, CG, OH, DKTuesday 11 June09:46 DAQ continues ok

      all system wide checks OK *except*
 17x 
  839   Thu Jun 13 00:30:17 2019 CA, CB, TD, CG, OH, DKThursday 13 June08.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers + 0.5
 18x 
  842   Sat Jun 15 01:05:41 2019 CA, CB, TD, CG, OH, DK, MLSaturday 15 June09.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 47x 
  757   Fri Nov 2 00:57:24 2018 CA, CB, TD, OHFriday 2 November09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
 14x 
  760   Sat Nov 3 00:37:29 2018 CA, CB, TD, OHSaturday 3 November09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold
0xa
 9x 
  769   Thu Nov 8 00:55:18 2018 CA, CB, TD, OHThursday 8th November09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7
ADC calibration failure
 14x 
ELOG V3.1.4-unknown