AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 1 of 46  ELOG logo
ID Date Authorup Subject Text Attachments
  224   Fri May 13 06:18:53 2016 AE, VP, BMFriday May 13th11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
 9x 
  370   Wed Oct 5 07:29:29 2016 CG & TDWednesday 5 October (inc AIDA+BRIKEN photos)14.30 Adjusted and checked insertion of AIDA
snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred
 11x 
  547   Thu Mar 30 16:12:21 2017 DK, OH, CGFriday, March 31 run status00:11 BigRIPS has started a new run at 00:10:42
run 0165.
      AIDA subrun R16_357 was about halfway
 14x 
  83   Thu Apr 30 01:06:44 2015 JA, LHB, TD, AE, CG & VPThursday 30 April 2015Overnight
      Degrader OUT
      DAQ ran OK - data file R22
 16x 
  96   Mon May 4 01:27:56 2015 JA, TD, AE, CG & JLTMonday 4 May 2015
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
 16x 
  54   Mon Mar 9 16:45:35 2015 TDJulabo FL11006 Recirculating Chiller: connection to 3ph ac mains
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer
 7x 
  913   Tue Oct 24 10:54:14 2023 at 19:14NH, CCAIDA testStarted AIDA at 11:54am, writing to disk:
file BG18OCT2/R5, stopped at 19:14
 Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png 
  285   Mon Jun 6 15:06:22 2016 1TD, ML & YSR1119R1118 ended OK

R1119 DAQ GO, check AIDA SYNCs OK, toggle
 41.png42.png 
  723   Sun Jun 24 09:08:03 2018 3OH, TDJune 2018 New Stack ConfigurationStack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2
 IMG_20180623_104349.jpgIMG_20180623_113315.jpg 
  63   Tue Apr 21 09:39:00 2015 AELISE estimates for implantation setup [updated][UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
 LISE_estimates_84Zn.docxLISE_estimates_94Se.docx 
  75   Tue Apr 28 05:59:48 2015 AE"beta" trigger from MACB Trigger outputsWe've constructed a beta trigger with the
signals from the p-side of the three DSSDs
(OR of all fast
 6x 
  82   Wed Apr 29 18:12:02 2015 AEonline analysis codeA first online analysis code is running now
in Desktop 4 aidas1
 8x 
  92   Sat May 2 19:17:25 2015 AEtime-stamp for event reconstructionSome first analysis of building events to
look for implants and decays
 time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png 
  93   Sat May 2 19:20:59 2015 AErun R51 online spectraOnline spectra to monitor condition during
run R51.
 ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png 
  99   Mon May 4 12:10:35 2015 AEonline monitor and data transferOnline monitor program for AIDA is in 
/homes/npg/AIDAonline
 R53_implant_E.pngR53_implant_XY.pngR53_decat_E.png 
  115   Fri Jul 17 17:28:35 2015 AE[Data Analysis] Correlation Scaler 100Kr data (go4_30**.root) Plots of corr-scaler vs event number in Root
files for 100Kr(?) setting: go4_40XX.root.
 scaler_r4001_4010.pngscaler_r4011_4020.pngscaler_r4021_4030.pngscaler_r4031_4040.pngscaler_r4041_4049.png 
  217   Wed May 11 05:49:51 2016 AEVHDL update to FEE_GF_Feb16_16The firmware of all FEEs was updated to the
version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from
 FEEprogram1.pngFEEprogram2.pngFEEprogram3.png 
  260   Mon May 30 18:29:54 2016 AECo/Bi source run (R7)Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
 R7_1.pngR7_2.pngR7_3.pngR7_5.pngR7_6.png 
  261   Mon May 30 22:57:58 2016 AECo/Bi source run (R7)> Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
  
  475   Sat Nov 26 12:18:25 2016 AESaturday 26 November, Part III19:30 Power cycled of AIDA reuired after Ge
filling
 6x 
ELOG V3.1.4-unknown