ID Date Authorup Subject Text Attachments
  65   Wed Apr 22 07:28:25 2015 AE (PM)Mechanical setup instructions: AIDA+EURICA at F11Attached are Paul Morrall's instructions on
how to move new AIDA support table into place,
for a setup with 
 AIDA_procedure_document.docx 
  493   Mon Nov 28 15:53:39 2016 AE, AT, RG, CGDAQ synchronization We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show,
 7x 
  112   Tue Jul 14 18:06:54 2015 AE, CG[Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root)The attached plots show the time-stamp data
in the EURICA files with PID information
(EventInfo.timestamp). The
 10x 
  135   Mon Dec 14 19:25:35 2015 AE, CG ,PhongMerger/TapeServer trouble reportSat. 12/12/15

Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133).
 master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt 
  499   Tue Nov 29 19:07:35 2016 AE, CG, ATS, ATF11 conditions after change to C target in F8 [light particles?]The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the
 visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png 
  305   Fri Jun 10 21:07:52 2016 AE, DK, TD, ML, MASaturday 11 June 201604.51 Start run AIDA18.  Beam is back
from the operators.
      Scalers are shown as attachment 1
 8x 
  484   Sun Nov 27 12:30:41 2016 AE, PVEnergy loss in Degraders and Implantation for runs 1028 and 1033Implantation profile in AIDA

    BigRIPS file 1028
(Attachment run1028.png):  Degrader
 6x 
  652   Sat Jun 10 09:24:45 2017 AE, TDSaturday 19 June 16.00-24.0017.25 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 24x 
  474   Sat Nov 26 09:17:42 2016 AE, TD, DKOffline analysis of R9_24
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)

 

 *** data items:  261088000
 rates_r9_24.pngee_r9_24.pngxy_r9_24.png 
  306   Sat Jun 11 10:29:16 2016 AE, TD, LHBsynchronization between different FEEsfile AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
 AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png 
  227   Sat May 14 11:27:09 2016 AE, VP[How To] DAQ correlation monitor (June16 campaign)The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J.
 sync2.pngsync3.pngsync5.pngsync6.png 
  219   Wed May 11 06:01:16 2016 AE, VP, BMBeta triggerPlease find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016
 Trigger_scheme-new.jpg 
  220   Wed May 11 06:37:32 2016 AE, VP, BMWednesday 11 May*2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
 Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png 
  223   Thu May 12 16:55:37 2016 AE, VP, BMThursday May 12Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which 
 7x 
  218   Wed May 11 06:00:56 2016 AE, VP, BM (Byul Moon)FEE64 <-> MACB trigger mappingHere is the mapping of the trigger output
of MAC-B modules to FEE64 modules
 dssd_layout.jpg 
  263   Tue May 31 16:03:24 2016 AE. VPCo/Bi source run (R17)Set discriminator mask for DSSD2 through DSSD6
(see attachments). Fast comparator threshold
set to 9 for all DSSDs.
 8x 
  133   Sat Dec 12 03:30:50 2015 Alfred, Chris, Phongchange configuration of NNAIDA modules in setupWe want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from
  
  18   Fri Oct 24 16:02:26 2014 Alfredo Estradebench tests with pulserPerformed pulser measurements with test
setup at Daresbury lab, with main purpose
of remembering how to operate the system!
 nnaida13_1.2.L_pulser_noDSSD.pngpulser_nnaida13_sample.pngnoise_nnaida11_DSSD_sample2.pngnoise_nnaida12_DSSD_sample.png 
  20   Wed Dec 3 12:13:03 2014 Alfredo EstradeIV curve with CAEN N1419Measured IV curve for BB18 DSSD with new CAEN
HV supply. Settings as in previous elog entry:
 IV_dec14.PNG 
  27   Fri Jan 30 13:02:35 2015 Alfredo Estrade[Data] R61 (207Bi source) and R62-R65 (pulser walk-through)Jan 22, 2015

R61: 207Bi source spectra accumulated during
  
ELOG V3.1.4-unknown