AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 11 of 46  ELOG logo
Entry  Tue Nov 15 02:22:25 2016, TD, Tuesday 15 November 7x
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Tue Mar 15 11:15:42 2016, TD, Tuesday 15 March 10.png11.png12.png13.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.845uA, ambient temperature +19.8 deg C
 
Entry  Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
10.20 System wide checks ok (except naida07 ADC calibration failure)

      FEE temperatures ok (attachment 1)
Entry  Tue Nov 14 16:52:54 2023, TD, Tuesday 14 November  Screenshot_from_2023-11-14_15-37-10.pngScreenshot_from_2023-11-14_15-37-41.png

15.06 Quick test of AIDA 24cm x 8cm 'triple' DSSSD before dismounting to install 1x bPlast detector downstream of the DSSSD
Entry  Tue Jun 14 01:42:56 2016, TD, Tuesday 14 June 2016 7x
09.35 AIDA67 stalled AIDA67_43 (c. 01.27)
      DAQ stopped and file closed 09.32
Entry  Tue Nov 13 07:35:37 2018, CA, TD, OH, Tuesday 13 November 16:00 - 00:00 20x
16.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
Entry  Mon Nov 12 23:03:53 2018, TD, Tuesday 13 November 08:00 - 16:00 23x

08.03 DAQ continues - AIDA file RIBF148/R5_117
      165Pm BigRIPS setting + 3mm Al degrader
Entry  Mon Nov 12 14:51:44 2018, OH, Tuesday 13 November 00:00 - 08:00 12x
00:00 AIDA currently on file R5_38
      BRIKEN on file 181112_2321_165Pm_019.dlt (AIDA file at start R5_33)
      BigRIPS run 1004
Entry  Tue Jun 13 00:11:56 2017, TD,ZLIU, Tuesday 13 June 08:00-16:00 17x

08.11 DAQ continues
Entry  Mon Jun 12 15:51:15 2017, OH, Tuesday 13 June 00:00-08:00 14x
00:02 System wide checks ok
      Good events - attachment 1
      FEE temperatures - attachment 2
Entry  Mon Dec 11 23:56:36 2023, TD, Tuesday 12 December 18x
00.55 Observe high frequency noise in aida02 & aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
      frequency c. 5MHz
Entry  Tue Oct 11 03:34:02 2016, CG & TD, Tuesday 11 October 16x
10.40 DAQ found stopped

      All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 13.8M => DAQ stopped @ 06.35
Entry  Tue Jun 11 01:45:55 2019, CA, CB, TD, CG, OH, DK, Tuesday 11 June 17x
09:46 DAQ continues ok

      all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Tue Oct 10 08:38:37 2023, TD, Tuesday 10 October 40x

09.38 Water flow & temp OK
      Power ON
Entry  Tue Nov 1 02:24:05 2016, TD, Tuesday 1 November 8x
11.24 DAQ found stalled
      Most recent file R95_168 last accessed 06.31
Entry  Tue Aug 1 08:50:36 2023, TD, Tuesday 1 August 30x

09.50 DSSSD bias +100V leakage current +9.255uA - attachment 2
Entry  Tue Jun 6 15:26:44 2017, TD, ZL, Tuesday 06 June 16.00-24.00 29x
15.53    Bias and leakage currents ok - attachments 1 & 2 
         FEE temperatures ok - attachment 3 
         statistics good events still seeing noise on 13 and 14 - attachment 4 
Entry  Mon Jun 5 16:02:50 2017, OH, PV, AE, Tuesday 06 June 00.00-08.00 40x
00:03 BigRIPS starts run 3007
      BRIKEN starts run 007
      AIDA on file R5_146
Entry  Mon Jun 6 19:26:38 2016, CG, DK, BM, AE, Tues 7th June 28x
02.08 Tried updating AIDA SYNC on stats page and got this message.
            See attachment 8
 
Entry  Tue Feb 24 03:04:59 2015, CG, TD, Tues 24th Feb progress 9x
24/02/15
1200: Update the FEE firmware on nnaida1-16 without problem.
           Gone from file FEE_Oct12_27Nov13.bin ----> FEE_Riken_Apr14_24.bin
ELOG V3.1.3-7933898