ID |
Date |
Author |
Subject |
Text |
|
505
|
Wed Nov 30 08:41:37 2016 |
PV, TD, RCF, Liu | Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 |
Degrader setting:
Variable degrader:
0.5
mm W + 1 mm Al : in
0.3 mm W + 1 mm Al :
in
1 mm W + 1 mm Al : in
Fix degrader:
20mm |
|
511
|
Thu Dec 1 08:13:06 2016 |
PV,Liu, TD | Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 | Bigrips run 1127
AIDA run 43_ 33 to 43 |
|
513
|
Thu Dec 1 10:58:54 2016 |
PV, TD, Liu | Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) | |
|
492
|
Mon Nov 28 13:12:31 2016 |
PV, AE, Liu | Implantation profile in AIDA with 8mm Al replacing 3 mm Pb | Data for ~3 hrs: Nov 28th, 20:06 to 23:16
Bigrips run 1060 to 1062
AIDA run R30_ 2 to R30_40 |
|
325
|
Thu Jul 7 17:16:11 2016 |
Patrick Coleman-Smith | Install & Run new firmware with diagnostics for the SYNC | Connected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge,
Runcontrol.
|
|
367
|
Sat Oct 1 09:34:23 2016 |
TD | Installing latest (16 April 2015) MACB firmware | Installed Xilinx 14.7 LabTools + (free) WebPack
license
|
|
109
|
Fri May 22 11:26:43 2015 |
TD | Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38 | Got the error Server Internal Error
while trying to obtain /AIDA/SaveRestore/SaveRestore.tml.
|
|
734
|
Sun Jul 1 08:25:24 2018 |
OH | Inventory | Attached is an updated inventory of the cables
and adapter boards we have in RIKEN. |
|
792
|
Tue Mar 26 14:02:59 2019 |
OH | Inventory to be shipped back | Inventory is currently packaged up under the
AIDA desk in B3F
|
|
39
|
Wed Feb 18 11:25:54 2015 |
Patrick Coleman-Smith | Investigations into removing HV noise | With the system in T9 and a Keithley
Source Meter supplying HV to the detector.
The source meter supplies 200V and |
|
488
|
Sun Nov 27 22:35:37 2016 |
Liu, PV, AE | Ion hit pattern in AIDA after degrader changing | After changing degrader to optimize 40Mg,
hit pattern in AIDA is shown in figure below.
The implantation position changed |
|
32
|
Sun Feb 15 22:30:48 2015 |
TD | Julabo FL11006 Operating Manual | |
|
54
|
Mon Mar 9 16:45:35 2015 |
TD | Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains |
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer |
7x |
581
|
Sun May 21 10:58:01 2017 |
TD | Julabo FL11006 recirculating chiller refilled | 18.55 Julabo FL11006 recirculating chiller
refilled to "H" marker of the filling level
indicator.
|
|
699
|
Fri Nov 17 03:32:31 2017 |
CB | Julabo FL11006 recirculating chiller refilled | 12:32 Chiller found almost empty &
still working at 20C. Refilled to overflow. |
|
723
|
Sun Jun 24 09:08:03 2018 |
3OH, TD | June 2018 New Stack Configuration | Stack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 |
|
63
|
Tue Apr 21 09:39:00 2015 |
AE | LISE estimates for implantation setup [updated] | [UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
|
|
365
|
Sat Oct 1 01:57:56 2016 |
TD & PJCS | Latest MACB firmware - 16 April 2015 | |
|
791
|
Sun Nov 18 02:02:48 2018 |
TD | Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) | https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769 |
|
216
|
Tue May 10 16:03:50 2016 |
TD & VFEP | Latest version of Rly16 |
Do not forget to backup the current versions
of the attached files before
|
|