ID Date Author Subject Text Attachments
  946   Wed Apr 10 16:45:59 2024 TDAIDA interlock
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
 cynergy3-fsvplc-v3.pdf 
  945   Fri Mar 29 08:39:18 2024 TD, PJCSUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
> At AIDA test station T9, STFC DL unable
to start MIDAS DAQ with 1x FEE64 ( aida04
  
  944   Thu Mar 28 15:43:47 2024 TDUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 )
 Screenshot_from_2024-03-28_15-43-28.pngScreenshot_from_2024-03-28_15-43-08.pngScreenshot_from_2024-03-28_15-47-49.png 
  943   Thu Mar 28 11:10:09 2024 TDTest of 4x FEE64s at AIDA test station, T9, STFC DLTest of 4x FEE64s at AIDA test station, T9,
STFC DL
 22x 
  942   Wed Mar 13 14:50:04 2024 NH[HowTo] Backup and Restore Raspberry Pi SD CardsMicro SD cards used by the raspberry pis are
cheap but prone to failing
  
  941   Tue Jan 30 14:18:16 2024 NH[HowTo] Update MACB Firmware https://elog.ph.ed.ac.uk/CARME/482  MACB_GSI_Simple.jed 
  940   Thu Dec 14 10:53:27 2023 NH, MP, CC, GASnout RemovedSnout removed from S4

All detectors removed
  
  939   Mon Dec 11 23:56:36 2023 TDTuesday 12 December00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
 18x 
  938   Mon Dec 11 11:05:27 2023 TDWR timestamp fail aida05 & aida07
MACB config 
1x level 0
 11x 
  937   Mon Dec 11 09:57:54 2023 TDMonday 11 DecemberWater flow and temperature ( gauges outside
S4 entrance ) OK
 27x 
  936   Sun Dec 10 13:06:27 2023 TDSunday 10 December14.05 S4 closed

Water flow and temperature ( gauges outside
 14x 
  935   Fri Dec 8 12:55:38 2023 TD, NHFEE64 configuration
FEE64 configuration for 1x MSL type BB18(DS)-1000
24cm x 8cm DSSSD
  
  934   Fri Dec 8 11:32:44 2023 NH, CC, VP, TDFriday 8 December
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty
 18x 
  933   Thu Dec 7 17:30:36 2023 NH, CC, VP, TDThursday 7 December
Stack re-assembled - upstream to downstream
 8x 
  932   Wed Dec 6 16:32:03 2023 NHReplacement of faulty Honeywell HSS-DPS sensor
Honeywell HSS-DPS sensor is faulty - attachments
1 & 2
 Honeywell_HSS-DPS_63-2711.pdf1000008603.jpg1000008604.jpg1000008605.jpg 
  931   Mon Dec 4 10:34:48 2023 NHAIDA Todo for 11.12.23This is a short list of things todo or check
before the test beam time on 11.12.23 
Updated after 15:00 CET meeting
  
  930   Fri Nov 24 10:36:06 2023 NHFriday 24 NovemberPulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04 
 Screenshot_from_2023-11-24_11-47-29.pngScreenshot_from_2023-11-24_11-47-39.pngScreenshot_from_2023-11-24_11-48-14.pngScreenshot_from_2023-11-24_12-00-33.png 
  929   Thu Nov 23 10:00:16 2023 NHReport - Cannot change per-ASIC Settings> On ASIC settings page trynig to change the
settings for one ASIC (e.g. ASIC1 of aida09)
seems to cause all 4 ASIC settings to change
 Screenshot_from_2023-11-23_10-58-30.pngScreenshot_from_2023-11-23_10-58-57.pngScreenshot_from_2023-11-23_10-59-12.pngScreenshot_from_2023-11-23_10-59-24.png 
  928   Wed Nov 22 15:12:40 2023 TD/tmp/log8015_error   log8015_error 
  927   Wed Nov 22 14:52:43 2023 NHAIDA Pulser CalibrationConnect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for
 Screenshot_from_2023-11-22_15-18-08.pngScreenshot_from_2023-11-22_15-31-43.pngScreenshot_from_2023-11-22_15-21-34.pngScreenshot_from_2023-11-22_16-05-33.png 