AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 1 of 46  ELOG logo
Entry  Fri May 13 13:27:50 2016, patrick Coleman-Smith, Power supply changes and blowing fuses ! 
 Reading about the power supply changes and the requirement to replace fuses leads me to be concerned.
I think the power being changed is the AC input to the FEE64 power supplies. 
Which Fuses are failing ? 
Entry  Sat Jun 11 13:57:09 2016, laura, How to monitor and check synchronisation of FEES eg1.pngeg2.pngeg3.pngeg4.png
Alfredo has written a program to check the synchronisation of the FEES, which need to be checked regularly
 
To do this:
Entry  Mon Jun 12 00:31:29 2017, ZLiu, TD, OH, Monday 12 June 08:00-16:00  11x
09:00   Stop DAQ  to tune the Sm beam, may need 3 hours
        AIDA file RIBF128/R9_319
        
Entry  Thu Jun 8 23:57:26 2017, ZLiu, TD, 9June2017 8:00-16:00 32x

08:06 System wide checks all ok
         implantation profile - attachment 1 
         count rate - attachment 2
         Bias and leakage currents
ok - attachment 3 
         DAQstatistics

08:30 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_604

08:32 BigRIPS starts run 3090
  
   BRIKEN starts run 85
      AIDA on file R7_604

08:44   BRIKEN and BigRIPS stop their DAQs
Entry  Fri Jun 9 09:12:03 2017, ZLiu, AE, 17:00-24:00 leakage_jun9_6pm.pngstat_21.14.pngtemp2116.pngnnaida12_EL.pngnnaida9_EL.png
17:06 BRIKEN and BigRIPS stop their DAQs
      AIDA on file R7_723
Entry  Sat Jun 10 15:56:31 2017, ZLiu, 0:00-8:00 11 June 2017 46x

00:35   Stop DAQ
        AIDA file RIBF128/R7_1172

00:36   Start DAQ
        AIDA file RIBF128/R7_1172
        BRIKEN file 118
        BigRIPS
file 4008

 


00:50   Detector biases & leakage currents OK - see attachments 4, 5 
        FEE64 Temperatures OK - see attachments 3
        good
Entry  Wed Jun 7 16:04:42 2017, ZL, DK, Thurs 8 June 0:00~8:00 13x
00:05  Shift change.
       Primary beam current ~4800 enA, 238U^86+ so 50 to 60 pnA.
       Biases shown as attachment #1, 08JunBias1.png
Entry  Fri Jun 10 08:04:11 2016, YS, Leakage Currents Spread Sheet AIDA_leakage_current.ods44.png
Leakage Currents Spread Sheet and Chart
Entry  Wed May 31 00:02:41 2017, VP, CB, Wednesday 31 May 08:00 - 16:00 10x
08:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
Entry  Tue Apr 28 11:22:25 2015, VP, RPI 
replace RPI with model B+.  4 USB ports + 4 port switch
 
The RPI system has been replaced by a model B+ which has 4 internal USB ports
Entry  Mon Apr 27 04:54:02 2015, VFEP & TD, [How To] Remote control of CAEN N1419 Programmable HV Power Supply N1419_rev4.pdf30.png

@ CAEN N1419
Entry  Mon May 4 02:32:29 2015, VFEP & TD, How to fix DAQ stalls at GO 
It has been observed that when starting the AIDA data acquisition (select 'GO' from the 'Data Acquisition Run
Control' window) that from time to time one, or possibly more, FEE64 modules fail to begin producing data.
Once running they appear to be totally reliable. 
Entry  Thu Sep 11 16:12:06 2014, Tom Davinson and photos by Patrick, AIDA Tests at STFC DL - PCS, SLT, TD 19x

Changes from configuration described by Elog entry https://elog.ph.ed.ac.uk/AIDA/3
are as follows:
Entry  Wed Sep 10 08:42:03 2014, Tom Davinson, Welcome to the AIDA Elog 
The AIDA Elog is now operational and can be found at

https://elog.ph.ed.ac.uk/AIDA/
Entry  Thu Sep 11 10:16:57 2014, Tom Davinson, AIDA Tests at STFC DL - PCS, SLT, TD 19x
MSL type BB18-1000 2998-22 bias +200V I_L +3.27uA

BNC PB-5
Entry  Thu Sep 11 17:29:59 2014, Tom Davinson, AIDA Tests at STFC DL - To Do list 

In no particular order of priority:
Entry  Thu Nov 20 14:05:21 2014, Tom Davinson, AIDA Tests at STFC DL - PCS, TD 20x

Configuration per Elog entries:
Entry  Wed Jan 28 16:12:52 2015, Tom Davinson, AIDA Tests at STFC DL - 27-28.1.15 - TD & PCS IMG_0881.JPGIMG_0882.JPGIMG_0883.JPG
MSL type BB18-1000 2998-22 bias +200V I_L +3.52uA

Entry  Tue Jun 13 00:11:56 2017, TD,ZLIU, Tuesday 13 June 08:00-16:00 17x

08.11 DAQ continues
Entry  Tue Jun 6 15:26:44 2017, TD, ZL, Tuesday 06 June 16.00-24.00 29x
15.53    Bias and leakage currents ok - attachments 1 & 2 
         FEE temperatures ok - attachment 3 
         statistics good events still seeing noise on 13 and 14 - attachment 4 
ELOG V3.1.3-7933898