AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 24 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Jun 17 11:00:55 2017, TD, Report - high - 'zero all histograms' doesn't 
    Reply  Mon Jun 19 08:52:40 2017, TD, Report - high - 'zero all histograms' doesn't 
    Reply  Mon Jun 19 08:58:00 2017, TD, Patrick, Report - high - 'zero all histograms' doesn't 
Entry  Wed Jan 20 16:44:02 2016, TD, Report - LOW - spectrum browser x/y expand 
Entry  Wed Nov 22 13:44:36 2023, NH, Report - Cannot change per-ASIC Settings 
    Reply  Thu Nov 23 10:00:16 2023, NH, Report - Cannot change per-ASIC Settings Screenshot_from_2023-11-23_10-58-30.pngScreenshot_from_2023-11-23_10-58-57.pngScreenshot_from_2023-11-23_10-59-12.pngScreenshot_from_2023-11-23_10-59-24.png
Entry  Wed Dec 6 16:32:03 2023, NH, Replacement of faulty Honeywell HSS-DPS sensor Honeywell_HSS-DPS_63-2711.pdf1000008603.jpg1000008604.jpg1000008605.jpg
Entry  Wed Jan 18 14:16:47 2017, Patrick Coleman-Smith, Repaired Modules returning to RIKEN 
Entry  Thu Sep 25 11:35:18 2014, Patrick Coleman-Smith, Removing the MACB from the system 
Entry  Mon Jun 6 11:17:30 2016, TD, ML & YS, Re-configure merger to ignore nnaida19 11.png12.png
Entry  Mon Apr 20 07:39:49 2015, CG, TD, Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console 
Entry  Thu May 18 03:07:47 2017, TD, OH, CB, RasPi system console diagnostics 105.png105.png106.png
    Reply  Thu May 18 09:29:50 2017, TD, OH, CB, RasPi system console diagnostics 
    Reply  Thu May 18 09:46:36 2017, TD, OH, CB, RasPi system console diagnostics 
Entry  Tue Apr 28 11:22:25 2015, VP, RPI 
Entry  Thu Dec 10 04:56:08 2015, CG, AE, RIKEN progress - first day and a half 2015-12-08_16.19.16.jpg2015-12-08_16.16.30.jpg
Entry  Thu Jan 7 13:55:24 2016, CG, RIKEN progress - 15/12/15 (late) AIDA_measurements_-_Dec2015.pdfAIDA_measurements_-_Dec2015.pptx
Entry  Sat Dec 12 02:12:17 2015, CG, AE, VH, RIKEN progress 9x
Entry  Mon Dec 14 07:56:27 2015, CG, RIKEN progress 10x
Entry  Tue Mar 8 06:00:45 2016, CG, AE, RIKEN maintenance progress 2016-03-07_15.54.46.jpg
ELOG V3.1.3-7933898