Thu Jan 7 16:04:44 2016, CG, PJCS, PCS Reply to RIKEN progress - 15/12/15 (late)
|
Quote:
Tues 15/12/15 |
Mon Feb 23 11:10:44 2015, TD, Outline test plan - RIKEN - Feb 2015
|
With the exception of one AIDA FEE64 PSU configuration test (5) and the upgrades
of the AIDA FEE64 firmware (8) and MIDAS DAQ software (9) we have now completed all
|
Mon May 27 08:51:04 2019, TD, Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11 9x
|
Offline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11 ( c. 380h )
1 per DSSSD m_p versus m_n
|
Sat Nov 26 09:17:42 2016, AE, TD, DK, Offline analysis of R9_24  
|
R9_24 3mm Pb + 0.3mm W (+1mm Al) + 1.0mm W (+1mm Al)
*** data items: 261088000 ( 99232.91 Hz)
*** ADC events: 41690396 ( 15845.46 Hz) |
Sat Nov 26 07:45:48 2016, TD, DK, AE, Offline analysis of R7_45  
|
R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at start of run) changing to 1.5mm W (+2mm Al)
S O R T C O M P L E T E ..... Sat Nov 26 16:46:31 2016
|
Sat Nov 26 06:57:36 2016, DK, TD, Offline analysis of R7_37   
|
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to 3mm Al, 1mm per W layer - 0.3mm W, 0.5mm W & 1.0 W))
|
Fri Dec 2 08:23:28 2016, TD, Offline analysis of R48_9   
|
Analysis of background, pulser off
S O R T C O M P L E T E ..... Fri Dec 2 17:11:14 2016
|
Thu Dec 1 09:46:06 2016, TD, Offline analysis of R43_59 9x
|
Variable degrader setting is now #2 + #3: 0.3 mm W + 1.0 mm W [+2 mm Al]
Centre ZDS @ 40Mg
|
Thu Dec 1 00:21:08 2016, DK, Offline analysis of R42_7    
|
Checking that the implantation is still reasonable after LN2 fill recovery.
Degrader condition is 8. + 0.2 mm Al on the upstream side of the PE wall.
All three variable degraders are in (0.5 mm W; 0.3 mm W; 1.0 mm W, each on 1 mm Al backing). |
Thu Dec 1 02:25:41 2016, DK, Offline analysis of R42_32 6x
|
Offline analysis of AIDA R42_32.
Degrader condition of F11 is with the same stopping power of e.g. R42_7 (see https://elog.ph.ed.ac.uk/AIDA/509).
|
Wed Nov 30 11:36:32 2016, TD, Offline analysis of R41_2 8x
|
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
Steering to F11 changed by PD
|
Wed Nov 30 06:42:01 2016, TD, Offline analysis of R39_26 8x
|
Following degrader change to (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
S O R T C O M P L E T E ..... Wed Nov 30 17:13:45 2016
|
Tue Nov 29 05:18:50 2016, TD, Offline analysis of R31 10x
|
Offline analysis of AIDA data files from R31_0 to c. R31_5 (elapsed time 1120.45s)
Note impact of increased noise ( https://elog.ph.ed.ac.uk/AIDA/494 )on LEC spectra,
|
Thu May 25 03:03:38 2017, TD, Offline analysis of R23_91 to R23_115 13x
|
Offline analysis of RIBF123R1_91 to R23_115
See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
|
Sun Nov 27 02:46:54 2016, DK, Offline analysis of R18_2  
|
Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
*** data items: 261088000 ( 105923.42 Hz) |
Sun Nov 27 05:30:51 2016, TD, Offline analysis of R12   
|
Offline analysis of R12 LEC -> MEC setting
S O R T C O M P L E T E ..... Sun Nov 27 14:37:35 2016
|
Tue Nov 13 01:41:12 2018, TD, Offline analysis RIBF148/R5_130 to _139  
|
10.41 FEE64 ADC data synchronised - attachment 1
|
Sat Nov 18 03:37:46 2017, TD, Offline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 data   
|
Offline analysis of
AIDA RIBF128/R5_124 to R5_148 data "130Ag setting", June 2017 RIBF128 experiment *yellow*
|
Tue Oct 31 05:57:33 2017, TD, Offline analysis RIBF128/R5_124-R5_148 and Oct17/R31_17-R17_34 10x
|
Offline analysis of the AIDA Oct17/R17_31 to R17_34 data "84Ge setting"
compared to an equivalent analysis of the AIDA RIBF128/R5_124 to R5_148
|
Fri May 26 05:19:40 2017, TD, Offline analysis RIBF123R1/R23_44 to R23_70
|
Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
|