  139   Thu Jan 7 16:04:44 2016 CG, PJCSPCS Reply to RIKEN progress - 15/12/15 (late)


   
        
            
  
  47   Mon Feb 23 11:10:44 2015 TDOutline test plan - RIKEN - Feb 2015
With the exception of one AIDA FEE64 PSU
configuration test (5) and the upgrades
 RIKEN_test_-_Feb_2015.txt 
  816   Mon May 27 08:51:04 2019 TDOffline analysis of alpha background data files May19/R1, R2, R7, R8, R9, R11Offline analysis of alpha background data
files May19/R1, R2, R7, R8, R9, R11 ( c.
380h )
 9x 
  474   Sat Nov 26 09:17:42 2016 AE, TD, DKOffline analysis of R9_24
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)

 

 *** data items:  261088000
 rates_r9_24.pngee_r9_24.pngxy_r9_24.png 
  473   Sat Nov 26 07:45:48 2016 TD, DK, AEOffline analysis of R7_45R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at
start of run) changing to 1.5mm W (+2mm Al)
 103.png110.png111.png 
  470   Sat Nov 26 06:57:36 2016 DK, TDOffline analysis of R7_37
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm
 100.png101.png102.pngK3MVQY.tmp 
  516   Fri Dec 2 08:23:28 2016 TDOffline analysis of R48_9Analysis of background, pulser off

S O R T    C O M P L E T E ..... Fri Dec
 100.png101.png102.png103.png 
  512   Thu Dec 1 09:46:06 2016 TDOffline analysis of R43_59     Variable degrader setting is now #2 +
#3: 0.3 mm W + 1.0 mm W [+2 mm Al]
     Centre ZDS @ 40Mg
 9x 
  509   Thu Dec 1 00:21:08 2016 DKOffline analysis of R42_7Checking that the implantation is still
reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2
 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png 
  510   Thu Dec 1 02:25:41 2016 DKOffline analysis of R42_32Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same
 6x 
  507   Wed Nov 30 11:36:32 2016 TDOffline analysis of R41_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 0.5mm/1mm Al + 1mm W/1m Al) variable
 8x 
  504   Wed Nov 30 06:42:01 2016 TDOffline analysis of R39_26Following degrader change to  (8mm Al) fixed
+ ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m
Al) variable
 8x 
  496   Tue Nov 29 05:18:50 2016 TDOffline analysis of R31Offline analysis of AIDA data files from R31_0
to c. R31_5 (elapsed time 1120.45s)
 10x 
  600   Thu May 25 03:03:38 2017 TDOffline analysis of R23_91 to R23_115Offline analysis of RIBF123R1_91 to R23_115

See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
 13x 
  479   Sun Nov 27 02:46:54 2016 DKOffline analysis of R18_2Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)

 
 307-312.png2120-2125.png2110-2115.png 
  482   Sun Nov 27 05:30:51 2016 TDOffline analysis of R12Offline analysis of R12 LEC -> MEC setting

S O R T    C O M P L E T E ..... Sun Nov
 103.png104.png120.png121.png 
  779   Tue Nov 13 01:41:12 2018 TDOffline analysis RIBF148/R5_130 to _139
10.41 FEE64 ADC data synchronised - attachment
 20.png21.png22.png 
  701   Sat Nov 18 03:37:46 2017 TDOffline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 dataOffline analysis of

AIDA RIBF128/R5_124 to R5_148 data "130Ag
 100.png101.png102.png103.png 
  693   Tue Oct 31 05:57:33 2017 TDOffline analysis RIBF128/R5_124-R5_148 and Oct17/R31_17-R17_34
Offline analysis of the AIDA Oct17/R17_31
to R17_34 data "84Ge setting"
 10x 
  602   Fri May 26 05:19:40 2017 TDOffline analysis RIBF123R1/R23_44 to R23_70
Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
  