AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 28 of 46  ELOG logo
ID Date Author Subjectdown Text Attachments
  361   Wed Sep 28 07:51:45 2016 TD & CGNew spectrum display software installed
Spectrum display software updated
    maximum number of galleries increased
  
  720   Sat Jun 23 02:28:13 2018 TD, OHNew fuses fitted to USB-controlled ac mains relay
The input fuses of the USB-controlled ac
mains relay have been changed from 2x 5x20mm
 2290195.pdf 
  121   Wed Nov 18 18:18:26 2015 CG, TDNew Kapton cable tests at DLNote: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain.
 nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg 
  124   Thu Nov 19 17:31:24 2015 CG, TDNew Kapton cable tests at DLPowered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC.
 nnaida11_wav.pngIMG_20151119_162831.jpg 
  125   Fri Nov 20 16:29:49 2015 CGNew Kapton cable tests at DLPowered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC.
 nnaida14_goodGNDbetweenAll.png 
  126   Wed Nov 25 19:24:39 2015 CG, TD, PJCSNew Kapton cable tests at DLPowered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra
 6x 
  127   Thu Nov 26 16:32:52 2015 CG, TDNew Kapton cable tests at DLPowered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room
 9x 
  128   Wed Dec 2 18:39:44 2015 CGNew Kapton cable tests at DLPowered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to
 nnaida14_wav_noHVnoDetNoShielding.pngnnaida14_wav_noHVnoDetWithShielding.pngall1.8.L_noDetShaping2us.png 
  130   Thu Dec 3 16:28:46 2015 CG, TDNew Kapton cable tests at DLSpent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance
 18x 
  53   Mon Mar 9 13:59:32 2015 TDNew AIDA support frame for F11/F12 @ RIKEN   IMG_2798.JPG 
  106   Sat May 9 11:47:40 2015 TDNetwork cabling & Raspberry Pi configuration   IMG_2907.JPGIMG_2908.JPGIMG_2909.JPGIMG_2910.JPG 
  107   Sat May 9 23:40:49 2015 TDNetwork cabling & Raspberry Pi configuration Hi Tom,
Please could you photo the power
supply cabling and the MACBs.
  
  435   Tue Nov 8 14:29:34 2016 TD, OH, DKNP1412 Run 423:28 Run 4 Start
      Thick 6mm C target in beam
      
  
  432   Tue Nov 8 13:06:18 2016 DK, TD, CG, OHNP1412 Run 1AIDA run with Takechi experiment. 71~73
Ni beam setting

F5 carbon target is:   
 14_JST_2016.png 
  438   Tue Nov 8 21:01:40 2016 CG, DKNP1412 R906.02 R9 started with Takechi group C target
out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
  
  437   Tue Nov 8 18:52:32 2016 CG, DKNP1412 R7 R803.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target
 bias1.pngbias2.pngbias1.pngbias2.png 
  436   Tue Nov 8 15:10:16 2016 CG, TD, DK, OHNP1412 R5 R600.15 Setting changed to 71,72,73Ni. All variable
degraders in.
      Will remove while watching rates to
 bias1.pngbias2.png 
  434   Tue Nov 8 14:22:16 2016 TD, OH, DKNP1412 R311:21 Run 3 Started
      Degrader moved upstream. AIDA moved
to centre of BRIKEN. Fixed degrader moved
  
  449   Thu Nov 10 09:56:20 2016 TD, OH, MLNP1412 R26 R27start 18.55 10.11.16
stop 
AIDA filename R26_0
 8x 
  448   Wed Nov 9 22:16:11 2016 CG, DK, TD, MLNP1412 R24 R2507.15 R24 started. BRIKEN run 33.
      76~78Ni beam setting.
      F5 C target out. F7 CH2 in. F11 C out.
 34x 
ELOG V3.1.4-unknown