AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 29 of 46  ELOG logo
ID Date Author Subjectdown Text Attachments
  447   Wed Nov 9 11:07:14 2016 TD, CG, DKNP1412 R22 R23DAQ start (R22) failed - merger remained in
'want first sync' state, no output to TapeServer
-> soft reset OK
 6x 
  446   Wed Nov 9 09:50:50 2016 TDNP1412 R20, R21
DAQ start (R20) failed - nnaida5 dropped
data transfer #1 link
 1.png2.png3.png4.png 
  433   Tue Nov 8 13:37:06 2016 TD, OH, DKNP1412 R210:36 Run 2 Start
      Degraders (5.4mm Al) in at start and
all removed once started.
 6x 
  445   Wed Nov 9 08:47:03 2016 OH, TDNP1412 R16, R17 and R18start 17:44
stop 17:49
AIDA filename R16
 r16bias1.pngr16bias2.png 
  444   Wed Nov 9 07:16:59 2016 OH, TDNP1412 R15Run 15

start 16:14
 6x 
  443   Wed Nov 9 02:14:08 2016 OH, TDNP1412 R1411.13 Still waiting to get beam back got access
so took temp measurement.
      T=25.6 DP=0.0 H=18.1
 bias1.pngbias2.pngR14bias1.pngR14bias2.png 
  442   Wed Nov 9 00:49:03 2016 TD, OHNP1412 R1309.50 Run 13 Start
      Thick C target (6mm) removed from F11.
All variable Al degraders put in place
 r13bias1.pngr13bias2.png 
  441   Tue Nov 8 23:36:56 2016 DK, TDNP1412 R12Takechi team changes the condition: F5
carbon; F7 empty; F11 carbon

  F11 Plastic is 1.1kHz
 10x 
  440   Tue Nov 8 23:16:15 2016 DK, TDNP1412 R11Recovered AIDA after power cycle (unknown
cause of crash from the end of R10)

Corresponding run in BRIKEN: 161109_0814_747576Ni_012
 R11_USB1.pngR11_USB2.png 
  439   Tue Nov 8 22:04:21 2016 DKNP1412 R10Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)

Takechi team switches the condition:
 R10_USB1.pngR10_USB2.png 
  531   Wed Feb 1 16:54:40 2017 CGNP1306 run summary   Run_Summary_NP1306.xlsx 
  229   Mon May 23 09:17:55 2016 Patrick Coleman-SmithMultiplicity Trigger SpecificationPlease read and comment on the attached
specification.
 Specification_for_the_multiplicity_Trigger_for_AIDA.pdf 
  902   Mon Oct 9 14:29:12 2023 TDMonday 9 October contd.
15.20 aida10 LK4 ( front f/p -> gnd ) fitted
- investigate impact aida10 asic #4 edge
 Screenshot_from_2023-10-09_15-40-36.png 
  901   Mon Oct 9 09:03:10 2023 TDMonday 9 October09.55 Water pressure and temp OK
      Power on
 50x 
  558   Mon May 8 02:11:37 2017 OH, TDMonday 8 May10.11 DAQ continues OK 
      Current file May2017/R1_58
 11x 
  428   Mon Nov 7 02:13:05 2016 CG, OH, TD, DKMonday 7 November11.10 DAQ found stopped. No storage mode so
can't tell when, but presumably at 06.30
during LN2 fill cycle.
 10x 
  278   Sun Jun 5 17:09:49 2016 CG, DK, AEMonday 6th June00.45 Run R1100 started on n-rich setting
(EURICA run_1100, BigRIPS run 1165)
           
 20x 
  358   Mon Sep 5 06:54:02 2016 TDMonday 5 September14.20 R17 continues

      DSSSD bias/leakage current OK - see
 16x 
  765   Mon Nov 5 01:40:10 2018 CA, CB, TD, OH, PJWMonday 5 November10.40 Lowered slow comparator threshold from
100 to 10
      Good event statistics ok (attachment
 16x 
  633   Mon Jun 5 08:43:24 2017 CB, TD, PW, DKMonday 5 June 16:00 to 24:0016:43  Leakage currents OK - see attachment
1
       FEE64 temperatures OK - see attachment
 38x 
ELOG V3.1.4-unknown