  258   Mon May 30 08:43:10 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  257   Mon May 30 08:18:48 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  256   Mon May 30 06:03:51 2016 CG, TDMACB settings14.00 MACB settings (from left -> right)

    
  
  
  255   Mon May 30 03:58:10 2016 TDpeakfind not working on aidas1
Peakfind appears not to be working on aidas1
- example spectrum attached
 1.5.L.msf 
  254   Mon May 30 02:50:19 2016 CGMonday 30th May10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
 startup.tcl95.png 
  253   Mon May 30 00:07:56 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > > > 
> > > > > > 22.05 nnaida17 ASIC parameters
not loading
  
  252   Mon May 30 00:01:23 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > > 
> > > > > 22.05 nnaida17 ASIC parameters
not loading
 90.png91.png92.png93.png94.png 
  251   Sun May 29 23:55:15 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> > 
> > > > 22.05 nnaida17 ASIC parameters not
loading
 80.png81.png82.png83.png84.png 
  250   Sun May 29 23:28:56 2016 TD, AE & CG - reply PJCSSunday 29 May 2016
> > > 22.05 nnaida17 ASIC parameters not
loading
  
  249   Sun May 29 22:35:25 2016 TD, AE & CG - reply PJCSSunday 29 May 2016
> > 22.05 nnaida17 ASIC parameters not loading
> >       power cycle & reboot
 70.png71.png72.png 
  248   Sun May 29 20:06:15 2016 TD, AE & CG - reply PJCSSunday 29 May 2016> Throughout day:
>       DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage
  
  247   Sun May 29 14:06:31 2016 TD, AE & CGSunday 29 May 2016Throughout day:
      DSSD2 (3058-25) would not bias, either
short circuit or suspiciously low leakage
 62.png63.png64.pngcaen_addr0_290616_2244.pngcaen_addr1_290616_2244.png 
  246   Sun May 29 10:31:59 2016 TDnnaida19 'H' histogramming enabled indicator dispappears following DAQ start18.30 Options for nnaida19 and a.n.other (working)
FEE (nnaida18)
 60.png61.png 
  245   Sun May 29 10:11:07 2016 TD, CG & reply by PJCSSaturday 8 May 2016 - reply about 'H' and "X"> 15.20 DAQ histogramming & data transfer
#1 enabled
>       Merger configured, started, input
  
  244   Sat May 28 07:31:07 2016 Saturday 8 May 2016TD, CG15.20 DAQ histogramming & data transfer #1
enabled
      Merger configured, started, input paused
 9x 
  243   Fri May 27 11:16:40 2016 TD[How To] Start and Stop RunsAll AIDA operations are controlled from the
Dell T410 Workstation aidas1 using web browsers.
 7x 
  242   Fri May 27 11:10:37 2016 TD[How To] Startup AIDA1) Start Julabo FL11006 Recirculating Chiller

   See manual (page 19)  http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
 34x 
  241   Fri May 27 06:38:27 2016 TD, AE & CGFriday 27 May 201614.30 DSSSD stack moved upstream to position
DSSSD#3 at centre of EURICA.
 13x 
  240   Thu May 26 14:19:13 2016 Patrick Coleman-Smith[HowTo] Access AIDA documentationThe latest version of the FEE64 software Interface
document ( May 2016 ) is available as a .pdf
from
  
  239   Thu May 26 10:03:11 2016 Patrick Coleman-Smith[HowTo] Specification Document for MACB including suggested setup.Attached is the specification for the MACB
with the settings currently available.
 Specification_for_the_MACB_25May16.pdf 
ELOG V3.1.4-unknown