AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 37 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  494   Mon Nov 28 18:07:14 2016 CG, TD, AE, DKTuesday 29 November01:39 : Attachment 26 (R30_70to72) shows a
gradual change in the hit pattern for DSSD2
(at the lower left
 42x 
  257   Mon May 30 08:18:48 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  258   Mon May 30 08:43:10 2016 CG, TD - PJCS replyMACB settings

    

       
            
  
  48   Tue Feb 24 03:04:59 2015 CG, TDTues 24th Feb progress24/02/15
1200: Update the FEE firmware on
nnaida1-16 without problem.
 9x 
  57   Mon Apr 20 06:53:24 2015 CG, TDProgress 20th April + RPi procedure20/04/15
1200: Complete all points on first
part of check list, except checking the PSU
 7x 
  58   Mon Apr 20 07:39:49 2015 CG, TDRasberry Pi : USB ac mains switch + USB serial link to FEE64 console
It would appear that you cannot reliably
startup the Raspberry Pi (nnrpi1)
  
  62   Tue Apr 21 06:01:50 2015 CG, TDTuesday 21 April 201521/04/15
1325: Recabled the MACB distribution
tree as per PC-S instruction yesterday.
 8x 
  116   Thu Nov 5 16:28:05 2015 CG, TD5 Nov 2015 - New kapton cable tests @ DLNew Kapton PCB design (2x 0.45m + inter-connecting
PCB, no ground plane layers)  under
test with small system in T9.
 11x 
  117   Wed Nov 11 17:36:19 2015 CG, TD11 Nov 2015 - new Kapton cable tests at DLUpon starting system with nothing connected
beyond adapter PCBs, observed pulser peak
FWHM of ~12-15ch in nnaida13+14 and ~15-18ch
 18x 
  118   Thu Nov 12 18:28:41 2015 CG, TD12 Nov 2015 - new Kapton cable tests at DLThis morning PC-S changed firmware and
DAQ software to that of the RIKEN setup
Firmware
 23x 
  119   Fri Nov 13 16:17:14 2015 CG, TD13 Nov 2015 - new Kapton cable tests at DLPowered system up with 4 bare 45cm kaptons
connected and nothing seems to have changed
from where we left last night
 6x 
  121   Wed Nov 18 18:18:26 2015 CG, TDNew Kapton cable tests at DLNote: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain.
 nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg 
  122   Thu Nov 19 12:19:15 2015 CG, TDReport: Low - nnaida12 ASIC4 not functioningCurrent nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all.
 nnaida12_stats.pngnnaida12_ASIC4_checkError.png 
  123   Thu Nov 19 12:23:03 2015 CG, TDReport: Low - Error message when selecting Act on all FEE64s for FADC calibrateWhen trying to calibrate FADCs in FADC
Align and Control page, ticked 'Act on ALL
FEE64 modules'.
 FADC_actOnAll.png 
  124   Thu Nov 19 17:31:24 2015 CG, TDNew Kapton cable tests at DLPowered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC.
 nnaida11_wav.pngIMG_20151119_162831.jpg 
  127   Thu Nov 26 16:32:52 2015 CG, TDNew Kapton cable tests at DLPowered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room
 9x 
  129   Thu Dec 3 10:12:08 2015 CG, TDReport: Low - RPi power cable can't be fully inserted due to case conflictThe RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic
  
  130   Thu Dec 3 16:28:46 2015 CG, TDNew Kapton cable tests at DLSpent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance
 18x 
  140   Fri Jan 15 16:50:09 2016 CG, TDRibbon cable + couple tests at DL 12/01/16      (Attachments
1-8)
FEEs set up as per ELOG entry 136
 20x 
  141   Tue Jan 19 18:09:53 2016 CG, TDTuesday 19 january 2016
18.00 Swapped input cables to nnaida11 and
nnaida14
 1.png2.png3.png4.png 
ELOG V3.1.3-7933898