AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 39 of 46  ELOG logo
ID Date Author Subject Text Attachments
  158   Mon Feb 22 16:47:28 2016 PJCSVersion 8 in nnaida2 outputting and merging two streamsnnaida2 , the bare test FEE64 in T9, is
successfully running with two streams connected
to nndhcp177 ( a Linux64 computer )
  
  157   Mon Feb 22 15:19:52 2016 PJCST9 System changed to version 8I have changed the T9 system to be using
Version 8.
Tests using the detector and pulser
 LED_window.png 
  156   Fri Feb 19 10:23:31 2016 TD19 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature
+20.2 deg C
  
  155   Thu Feb 18 13:23:03 2016 TDReport: high: MERGE error messagesDuring R30 ( see https://elog.ph.ed.ac.uk/AIDA/154
) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k
  
  154   Thu Feb 18 10:23:48 2016 TDThursday 18 FebruaryMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature
+20.1 deg C
 19x 
  153   Wed Feb 17 11:54:50 2016 CG, TD17 February 2016File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V
 6x 
  152   Tue Feb 16 17:32:21 2016 CG, TD16 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature
+20.1 deg C
  
  151   Wed Feb 10 10:56:02 2016 CG, TD9-10 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature
+19.9 deg C
 7x 
  150   Tue Feb 9 17:27:12 2016 CG, TDRibbon cable + coupler tests at DL 8-9th Feb08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6.
 allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png 
  149   Wed Feb 3 15:34:30 2016 CG, TDRibbon cable + coupler tests at DL 1st-2nd Feb01/02/16
Started up system. Biased det to
+200V 
  
  148   Tue Feb 2 17:32:46 2016 CG, TDTuesday 2 February 2016Bias +200V, I_L +6.955uA, ambient temp +20.2
deg C
 9x 
  147   Tue Feb 2 14:08:44 2016 CG, TDReport: Low - No SYNCs from FEEsCurrently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc.
 noSYNCs.png 
  146   Thu Jan 28 13:53:29 2016 CG, TDRibbon cable + coupler tests at DL - 25-26th Jan 25/01/16
On start up, received error when
trying to access spectrum browser (attachment
 15x 
  145   Wed Jan 27 14:54:48 2016 TD, CGWednesday 27 January 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature
+20.2 deg C
 11.png14.png 
  144   Wed Jan 20 17:02:47 2016 CG, TDRibbon cable + coupler tests at DL 18/01/16
Set up as last week but with 8us
shaping time.
 17x 
  143   Wed Jan 20 16:44:02 2016 TDReport - LOW - spectrum browser x/y expand
Spectrum Browser
  
  142   Wed Jan 20 12:00:19 2016 CG, TDWednesday 20 January 201611.58 Repeat yesterday's test - no significant
change observed
 6x 
  141   Tue Jan 19 18:09:53 2016 CG, TDTuesday 19 january 2016
18.00 Swapped input cables to nnaida11 and
nnaida14
 1.png2.png3.png4.png 
  140   Fri Jan 15 16:50:09 2016 CG, TDRibbon cable + couple tests at DL 12/01/16      (Attachments
1-8)
FEEs set up as per ELOG entry 136
 20x 
  139   Thu Jan 7 16:04:44 2016 CG, PJCSPCS Reply to RIKEN progress - 15/12/15 (late)


   
        
            
  
ELOG V3.1.4-unknown