AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 42 of 46  ELOG logo
Entry  Thu May 25 02:11:04 2017, CB, TD, Thursday 25 May 10x
10.10 DAQ continues OK 
      Current file May2017/R26_17
Entry  Fri Nov 17 10:03:25 2017, CB, TD, Friday 17 November 32x
19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
Entry  Sat Nov 18 04:25:16 2017, CB, TD, Saturday 18 November 19x

13.27 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
Entry  Sun Nov 19 01:46:10 2017, CB, TD, Sunday 19 November 14x
10.45 Detector biases & leakage currents OK - see attachments 1
      FEE64 Temperatures OK - see attachment 2
      DAQ statistics OK - note *all* slow comparators 0xa - see attachment 3
Entry  Sat Jun 8 06:08:52 2019, CB, TD, Saturday 8 June 13x
14.14 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers
      Temperature +25.3 deg C dew point +8.5 deg C RH 34.7%
Entry  Sun Jun 4 23:50:24 2017, CB, PW, DK, TD, Monday 5 June 08:00 to 16:00 24x
07:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment 2
       Good event statistics OK - attachment 3
Entry  Fri May 26 02:20:42 2017, CB, OH, NN, Friday 26 May 15x
10.20 DAQ continues OK 
      Current file May2017/R27_22
Entry  Sat Jun 15 16:53:22 2019, CB, OH, DK, ML, Sunday 16 June 37x

00.30 AIDA file R2_26
      DTAS run 007
Entry  Sun Nov 11 21:35:42 2018, CB, OH, CA, LS, Monday 12 November 20x
06:35 DAQ Continues ok
      Stats ok - attachment 1
      FEE Temps ok - attachment 2
Entry  Sat May 20 02:39:06 2017, CB, OH, Saturday 20 May 9x
10.35 DAQ continues OK 
      Current file May2017/R16
Entry  Tue May 30 07:56:05 2017, CB, NN, OH, AE, Tuesday 30 May - evening shift 7x
16.00   Still no beam  
        Current run /RIBF127R1/R1_197
        Found dropped channels on nnaida1, ASIC4 - see attach 1
Entry  Mon Jun 17 16:01:27 2019, CB, CG, OH, TD, Tuesday 18 June 00:00 - 16:00 34x
00:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of Sn100
Entry  Thu Apr 13 15:08:31 2017, CB, Card test 8us.png4us.png0.5us.pngPlot.pngPlot_teflon.png
I tested the FWHM of a BNC PB-5 pulser signal as a function of shaping time using the first produced ISOL FEE64 card in Daresbury Labs.

Find attached four representative spectra per ASIC taken with 8, 5 and 0.5 us shaping time values. Run times are different.

Also find attached a plot of the FWHM as a function of the shaping time for the first channel in each ASIC. There appears to be a maximum of
Entry  Fri Jun 2 16:02:37 2017, CB, Saturday 3 June 00:00-08:00 28x
00:02  Noise in nnaida 1 and 2 appears to be reduced.
       However, some channels in nnaida1, ASIC4 and nnaida2, ASIC 1 have been dropped. See attachment 1
Entry  Fri Nov 17 03:32:31 2017, CB, Julabo FL11006 recirculating chiller refilled 
12:32 Chiller found almost empty & still working at 20C. Refilled to overflow.
Entry  Tue Jun 18 23:58:46 2019, CB, Wed Jun 19 8:00-16:00  19x
08:00 Shift change
      No change in settings
Entry  Thu Nov 15 22:55:38 2018, CA, TD, OH, LS, Friday 16th November 08.00 - 16.00 42x
07.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Tue Nov 13 07:35:37 2018, CA, TD, OH, Tuesday 13 November 16:00 - 00:00 20x
16.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
Entry  Fri Nov 16 04:47:39 2018, CA, TD, OH, Correlation analysis at different degrader Al thickness 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png
13.53 Correlation analysis plot of all detectors with 3.3mm Al degrader thickness (attachment 1)
 
13.54 Correlation analysis plot of detectors 1 and 2 with 3mm, 2.3mm and 2.8mm degrader thickness (attachment 2)
Entry  Mon May 13 03:23:58 2019, CA, TD, OH, Monday 13 May 18x

09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
ELOG V3.1.3-7933898