AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 42 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Authordown Subject Text Attachments
  599   Thu May 25 02:11:04 2017 CB, TDThursday 25 May10.10 DAQ continues OK 
      Current file May2017/R26_17
 10x 
  700   Fri Nov 17 10:03:25 2017 CB, TDFriday 17 November19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
 32x 
  703   Sat Nov 18 04:25:16 2017 CB, TDSaturday 18 November
13.27 Detector biases & leakage currents
OK - see attachments 1 & 2
 19x 
  704   Sun Nov 19 01:46:10 2017 CB, TDSunday 19 November10.45 Detector biases & leakage currents OK
- see attachments 1
      FEE64 Temperatures OK - see attachment
 14x 
  833   Sat Jun 8 06:08:52 2019 CB, TDSaturday 8 June14.14 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers
 13x 
  632   Sun Jun 4 23:50:24 2017 CB, PW, DK, TDMonday 5 June 08:00 to 16:0007:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment
2
 24x 
  601   Fri May 26 02:20:42 2017 CB, OH, NNFriday 26 May10.20 DAQ continues OK 
      Current file May2017/R27_22
 15x 
  843   Sat Jun 15 16:53:22 2019 CB, OH, DK, MLSunday 16 June
00.30 AIDA file R2_26
      DTAS run 007
 37x 
  775   Sun Nov 11 21:35:42 2018 CB, OH, CA, LSMonday 12 November06:35 DAQ Continues ok
      Stats ok - attachment 1
      FEE Temps ok - attachment 2
 20x 
  579   Sat May 20 02:39:06 2017 CB, OHSaturday 20 May10.35 DAQ continues OK 
      Current file May2017/R16
 9x 
  614   Tue May 30 07:56:05 2017 CB, NN, OH, AETuesday 30 May - evening shift16.00   Still no beam  
        Current run /RIBF127R1/R1_197
        Found dropped channels on nnaida1,
 7x 
  851   Mon Jun 17 16:01:27 2019 CB, CG, OH, TDTuesday 18 June 00:00 - 16:0000:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of
 34x 
  554   Thu Apr 13 15:08:31 2017 CBCard testI tested the FWHM of a BNC PB-5 pulser
signal as a function of shaping time using
the first produced ISOL FEE64 card in Daresbury
 8us.png4us.png0.5us.pngPlot.pngPlot_teflon.png 
  625   Fri Jun 2 16:02:37 2017 CBSaturday 3 June 00:00-08:0000:02  Noise in nnaida 1 and 2 appears to
be reduced.
       However, some channels in nnaida1,
 28x 
  699   Fri Nov 17 03:32:31 2017 CBJulabo FL11006 recirculating chiller refilled12:32 Chiller found almost empty &
still working at 20C. Refilled to overflow.
  
  854   Tue Jun 18 23:58:46 2019 CBWed Jun 19 8:00-16:00 08:00 Shift change
      No change in settings
 19x 
  788   Thu Nov 15 22:55:38 2018 CA, TD, OH, LSFriday 16th November 08.00 - 16.0007.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
 42x 
  780   Tue Nov 13 07:35:37 2018 CA, TD, OHTuesday 13 November 16:00 - 00:0016.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
 20x 
  789   Fri Nov 16 04:47:39 2018 CA, TD, OHCorrelation analysis at different degrader Al thickness13.53 Correlation analysis plot of all detectors
with 3.3mm Al degrader thickness (attachment
1)
 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png 
  795   Mon May 13 03:23:58 2019 CA, TD, OHMonday 13 May
09.55 all system wide checks OK *except*
nnaida7 fails ADC calibration
 18x 
ELOG V3.1.3-7933898