Installation of BRIKEN PE shielding for beam
related neutrons
The missing metallic pieces needed to mount
the forward PE shielding finally arrive and
we mount it with help of the crane.
The shielding (4 PE slabs + 1Cd-PE slab) has attached
the support for VETO detectors on the beam side
and for and additional ancillary detector
a large Si detector on the BRIKEN side.
See attached photos.
The distance between shielding and BRIKEN is 40 cm. |