Entry  Thu Nov 22 07:01:36 2018, AT, PID high mass seting (165Pm) - RIBF148 F7pid_RIBF148_165PmSetting_labels.png
PID plot for the high mass setting (165Pm), run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification at F7.
Please use for internal reports about the BRIKEN activities.
Entry  Tue Nov 6 21:51:54 2018, NT Brewer, New D4Off.conf for HV also on github 



V A V/s V/s 1/0









------ ---------------
--------- ----- ---- ------- ------- ------ ------ -------------









0
192.168.13.239 0 0 PA1 1450 0.0001 50 10 1









0 192.168.13.239 1
Entry  Mon Nov 5 22:47:40 2018, AT, JR, FM, PA, Low threshold, 252Cf, z=0cm, perpendicular 0 deg Screenshot_from_2018-11-06_08-32-50.png
252Cf at z=0cm, i.e 0 cm from the center of the detector,  source axis perpendicular at 0 deg 
Low threshold.
Entry  Mon Nov 5 21:24:20 2018, AT, JR, FM, PA, Low threshold, 252Cf, z=25cm, perpendicular 90 deg 
252Cf at z=25cm, i.e 25 cm from the center of the detector,  source axis perpendicular at 90 deg 
Low threshold.
Entry  Mon Nov 5 19:55:20 2018, AT, JR, FM, PA, Low threshold, 252Cf, z=0cm, perpendicular 90 deg 
252Cf at z=0cm, i.e 0 cm from the center of the detector,  source axis perpendicular at 90 deg 
Low threshold.
Entry  Mon Nov 5 09:59:36 2018, MW, KR, suspicious clover G7 temp sensor 
We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.

D4 went full within reasonable time of below 10 minutes.

Filling of G7 was stopped by "emergency sensor" after about 15 minutes of filling.
    Reply  Mon Nov 5 18:52:54 2018, MW, KR, suspicious clover G7 temp sensor 
 




Quote:



We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.
Entry  Mon Nov 5 18:05:48 2018, AT, JR, FM, PA, Low threshold, 252Cf, z=25cm, perpendicular 0 deg 
252Cf at z=25cm, i.e 25 cm from the center of the detector,  source axis perpendicular  
Low threshold.
Entry  Mon Nov 5 16:43:43 2018, FM, PA,, Low threshold, 252Cf, z=25cm, Parallel downstream 
252Cf at z=25cm, i.e 25 cm from the center of the detector,  source axis parallel downstream 
Low threshold.
Entry  Mon Nov 5 15:10:43 2018, FM, PA,, Low threshold, 252Cf, z=15cm, Parallel downstream 
252Cf at z=15cm, i.e 15 cm from the center of the detector,  source axis parallel downstream 
Low threshold.
Entry  Mon Nov 5 13:43:57 2018, FM, PA, Low threshold, 252Cf, z=0cm, Parallel downstream 
252Cf at z=0cm,ie center of moderator, source axis parallel downstream 
Low threshold.
Entry  Mon Nov 5 12:04:08 2018, FM, PA, AT, Low threshold, 252Cf, z=15cm, Perpendicular 0deg 
252Cf at z=15cm,ie center of moderator, source axis perpendicular at 0deg (typical orientation)
Low threshold.
Entry  Mon Nov 5 09:32:00 2018, FM, JR, PA, AT, Low threshold, 252Cf, z=0cm, Perpendicular 0deg 
252Cf at z=0cm,ie center of moderator, source axis perpendicular at 0deg (typical orientation)
Low threshold.
Entry  Mon Nov 5 06:46:30 2018, KR, YR, MW, JLT, ..., Clover check Screenshot_from_2018-11-05_15-57-40.pngScreenshot_from_2018-11-05_16-23-12.png

With detectors still on the floor we check signals and found
that D4 gives no signal with PA power.  Two power supplies/cables were checked.
Entry  Fri Nov 2 14:18:54 2018, JLT, 136Sn at ZDS 
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 136Sn at ~140MeV/u, Be target, 136Sn in the ZDS
Entry  Fri Nov 2 01:07:21 2018, JLT, 134Sn/133In on ZDS Screenshot_from_2018-11-02_10-17-34.pngScreenshot_from_2018-11-02_10-20-20.pngScreenshot_from_2018-11-02_10-21-50.png
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam: 
Entry  Wed Oct 31 03:41:33 2018, JLT, 134Sn at ZDS 
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at ~140MeV/u, Au target, 134Sn in the ZDS
Entry  Wed Oct 31 00:36:34 2018, JLT, 133In at ZDS 
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at XXMeV, Be target, 133In i the ZDS
Entry  Tue Oct 30 01:01:42 2018, JLT, AA, Adjustment of 3He thresholds 181030_Conf_BrikenFull_LowThrAdj_masterCLK.xlsxScreenshot_from_2018-10-30_16-22-32.png
Background with BigRIPS+ZD already working
No pulser
Entry  Mon Oct 29 12:08:12 2018, JR, JA, AT, Background 

Background was measurement
Pulser: NO
Entry  Sun Oct 28 07:41:03 2018, AT, JA, AA, Background 
Dacq was reinitialized
Background was measurement
Pulser: YES