AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 11 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Authordown Subject Text Attachments
  12   Sun May 3 09:04:07 2015 J.L. Tain, J. Agramunt, G. KissSummary of neutron measurements
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
  
  13   Sun May 3 10:07:25 2015 J.L. Tain, J. Agramunt, G. KissPhotos of new PE shieldingPhotos of the general arrangement and details
of the new PE blocks
 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg 
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
  
  21   Tue May 5 05:04:00 2015 J.L. Tain, J. Agramunt, G. KissChange of degrader thicknessFor EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger
  
  22   Tue May 5 05:17:36 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurement

Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)

We take the chance of
  
  23   Tue May 5 05:29:26 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurementBeam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
  
  24   Wed May 6 04:57:24 2015 J.L. Tain, J. Agramunt, G. KissNew degrader thicknessThe Al degrader thickness was reduced to 4.8mm   
  25   Wed May 6 05:10:14 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurementAfter the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat
  
  54   Wed Jul 20 16:50:12 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, S. Go...252CfMeasurement of the 252Cf source at the central
position
  
  57   Wed Jul 20 17:18:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui...ElectronicsMeasurement with preamplifiers after drying.

Amplifiers are brought back after ~12h and
 Bkg-afterPAdrying.pngV2A4C3-SpuriousSignal.png 
  50   Wed Jul 20 12:00:15 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...252CfMeasurement with the source at the center

Listmode: 160719_BRIKEN_252Cf_009.dlt
  
  56   Wed Jul 20 17:05:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...BackgroundBackground measurement with remaining tubes
(95) overnight
 Bkg-with95tubes.png 
  27   Thu May 7 08:36:56 2015 J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.GriffinFirst BRIKEN_v.0 beta-delayed neutron correlations?During the 98,100Kr setting run we observe

in the time correlation plot (middle right
 Screenshot_from_2015-05-07_16_01_27.png 
  46   Wed Jul 20 08:58:13 2016 J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ...ElectronicsDistribution of connections of tubes in preamplifiers
and digitizers
 TubeDistribution-new.xlsxTubeDistribution-new.pdf 
  10   Sat May 2 03:52:14 2015 J.L. Tain3He tube description3He tube drawings and technical details: 
RIKEN, UPC, GSI, ORNL-1, ORNL-2
 He3_GE_30cm.pdfHe3-252248.pdf1inch3He.pdf2inch3He.pdf 
  30   Sat Jul 9 20:44:31 2016 J.L. TainBRIKEN neutron detectorSTART
Assembly and commissioning of BRIKEN neutron
detector 
  
  31   Sat Jul 9 21:00:54 2016 J.L. TainHardwareA list of the available hardware  Hardware.xlsxHardware.pdf 
  32   Sat Jul 9 21:08:08 2016 J.L. TainNeutron moderatorDrawings of the polyethylene neutron moderator
and table assembly
 Moderator-Table.pdfTable.pdfModerator-Shielding.pdf 
  33   Sat Jul 9 21:14:12 2016 J.L. Tain3He tubesDrawings and specs of 3He tubes  He3_GE_30cm-RIKEN.pdf1inch3He-ORNL.pdf2inch3He_ORNL.pdfHe3-252248-UPC-GSI.pdf 
  34   Sat Jul 9 21:21:38 2016 J.L. Tain3He tubesTube distribution in the moderator, pre-amplifiers
and digitizers
 TubeDistribution.pdfTubeDistribution.xlsx 
ELOG V3.1.3-7933898