AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 13 of 21  ELOG logo
ID Date Author Subject
  174   Sat Nov 26 16:21:08 2016 Briken collaboration41Al run 2-15
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!

13:25 Signal cables for clover G7 are connected, now G7 spectra are visible in ONLINE.

13:35 Beam Off!

14:00 Beam ON

15:08 Beam OFF, still problems with beam!

15:11 Beam ON 

15:18 Acquisition is stopped. Files 
   161126_1308_002.dlt to 161126_1308_015.dlt
   161126_1308_002.root (online)

Rates:
F11R	:  4.2 & 1.0  & 9.3 Hz
BRIKEN	:  150 & 12.9 & 160 Hz
  173   Sat Nov 26 09:31:05 2016 Gabor Kiss, Ariel Tarifeno, Alvaro TolosaOutput signals from G7Red
Preamplifier of crystal G7Red was replaced. 
Output signals from G7Red are weird.

Several screen-shots of the signal are attached. The time calibration factor is 20ns/sample. 
  172   Sat Nov 26 06:37:37 2016 AT41Al run 1
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
3mm Pb (fixed on the beam)

11:14  Online is saved and then cleared
file:   161126_1107_001_1114.root

Rates:
F11R	:   10.5Hz
BRIKEN	:  170 Hz

11:18 Tungsten degraders are removed.

11:20 Beam Off

11:30 Beam ON

OBS:  Something happens in between with the beam intensity!!!  
Rates:
F11R	:   10.5Hz   &&  4.54 Hz
BRIKEN	:  177.7 Hz  && 160 Hz

11:41 Beam OFF

11:55 Acquisition is stopped. Files
 161126_1107_001.dlt  (full run)
 161126_1107_001.root  (Online from 11:18)
  171   Sat Nov 26 06:30:30 2016 ATSetup
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u

Degraders:
- Pb 3mm width  ---> IN beam
- Tungsten:
 1) 0.5 mm W + 1mm Al  ---> IN/OUT beam
 2) 0.3 mm W + 1mm Al  ---> IN/OUT beam
 3) 1.0 mm W + 1mm Al  ---> IN/OUT beam
  170   Sat Nov 26 00:15:12 2016 AT41Al run0
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers

08:45    
Beam Off for intervention

08:50    
Degrader is modified to 3mm Pb

09:44    
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root

Rates:
BRIKEN	:  85.2 Hz
F11R	: 33.5 Hz

Daq Conf. File	: 161125Conf_BrikenFull.xlsx
  169   Sat Nov 26 00:04:15 2016 ATElog
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Elog is found in http://ribf-exp.riken.jp/elog/DALI2+Fall+2016/

BRIKEN collaboration: 
We keep elog from Takeshi experiments (Nishimura-san desicion!). This elog is found in 

http://ribf-exp.riken.jp/elog/RIBF123/
  168   Fri Nov 25 23:18:04 2016 BRIKEN collaborationFallon Parasitic experiments
=====   START OF PARASITIC EXPERIMENTS  ======
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File
161125Conf_BrikenFull.xlsx
  166   Fri Nov 25 21:49:36 2016 ATBackground Beam OFF
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
  165   Fri Nov 25 21:48:49 2016 ATDACQ
19:00  Test calibration 
  164   Fri Nov 25 21:47:05 2016 ATBackground Beam OFF
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
161125_1617_017.dlt
161125_1617_017.root

BRIKEN rate beam OFF (background): 0.34 +- 0.03 n/s
  163   Fri Nov 25 03:49:44 2016 ATBackground Beam ON
16/11/25 12h28min: Background measurement beam ON 19B
  162   Fri Nov 25 03:41:40 2016 ATRun setups
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php

A copy of the information in this page is placed here!

According to their Setup, they are using C targets on F8 and F11. The targets can be IN/OUT.
  161   Fri Nov 25 03:37:23 2016 ATBackground Beam OFF/ON
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C

21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved 
File:        161124_2106_013.root 
  160   Fri Nov 25 03:15:46 2016 AT Background Beam ON
16/11/24 19h38min:  
Background measurement during tunning of BigRips from 27-29F to 22C is started.


Files: 
161124_1938_012.dlt
161124_1938_012.root
  159   Thu Nov 24 14:57:55 2016 ATBackground Beam ON
Starting from today 12:22, the background generated by the different setups on BigRips is monitorized.

- 30 min aprox Beam off
- 25 min aprox 29F after C target in F8
- 14 min aprox Beam Off
- 272 min aprox 27F
- 11.5 min Beam Off
- Tunning for 10Min

Adquisition is stopped at 18:22

Files: 
161124_1222_010.dlt
161124_1222_011.dlt
161124_1222_010.root (online)

The RUN summary for this experiments is found in
http://ribfdaq/~gamma16/expdbrunsum.php (Access only from RIKEN)
  158   Thu Nov 24 14:36:27 2016 AT252Cf
Check of calibrations and rates for neutron detectors with Conf File 161107Conf_BrikenFull.xlsx

Measurement 161122_2208_003.root has been used to check the calibrations and counting rates in the BRIKEN
detector. Condition of the measurement:
252Cf at 22.5cm from moderator, opposite sede from AIDA

RESULTS

Calibrations factors:
Calibrations of the neutron detectors are reasonable in the current conditions. A check detector by detector
(see attached file) shows that the full peak for most of the counters is around 764keV. Only 3 counters are
shifted more than 10keV:
He134	741.901
He135	750.312
He140	748.587	

The impact on the counting rates would not be serious.

Counting rates (n/pulser):
#########################################
Total neutron rate:	1516.28
#########################################
	BY RING:
#########################################
R1	359.057
R2	222.997
R3	386.299
R4	253.833
R5	143.434
R6	90.6357
R7	60.025

The total current counting rate is lower than rate obtained in Oct 12th (total 1550.91 n/pulser). The difference
is due mainly to a decrease in the counting rates for rings 1 to 4.
  157   Thu Nov 24 02:30:56 2016 CGRIBF123R1 Local ELogs

PDFs of the local ELog for the RIBF123R1 experiment Nov 2016

  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
turning up.
We have turned down the HV after that.
We've checked that the NIM crate power supply for the preamp is On and the HV and peamplifier connections for
this Clover are Ok.
  155   Tue Nov 22 10:17:57 2016 ATS, PV, LIU252Cf
Measurement with 252Cf at Z=22.5cm from the moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Beam is off.

Files: 
161122_1820_001.dlt
161122_1820_002.dlt
161122_1820_001.root
Obs: There is a problem in the online data for this run. DAQ for VME1 do not stored data. This problems seems to
be a crash on the DAQ. I restarted the system and run again the measurement. The display for voltages has lost
connection. The channels on VME1 have been checked, no problems is observed in the waveforms.

Again, this time without observing problems:
File:
161122_2208_003.dlt
161122_2208_003.root

BRIKEN spectrum is attached for this run. Counts in the pulser are 1.123e4
ELOG V3.1.4-unknown