Sat Nov 26 09:31:05 2016, Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa, Output signals from G7Red   
|
Preamplifier of crystal G7Red was replaced.
Output signals from G7Red are weird.
|
Sat Nov 26 06:37:37 2016, AT, 41Al run 1
|
11:07 New acquisition is started for tungsten degraders
1mm W + 1mm Al
0.5mm W + 1mm Al
|
Sat Nov 26 06:30:30 2016, AT, Setup
|
Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
|
Sat Nov 26 00:15:12 2016, AT, 41Al run0
|
08:15 BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
|
Sat Nov 26 00:04:15 2016, AT, Elog
|
RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
|
Fri Nov 25 23:18:04 2016, BRIKEN collaboration, Fallon Parasitic experiments
|
===== START OF PARASITIC EXPERIMENTS ====== |
Fri Nov 25 21:50:42 2016, AT, New Conf File
|
161125Conf_BrikenFull.xlsx |
Fri Nov 25 21:49:36 2016, AT, Background Beam OFF
|
21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files: |
Fri Nov 25 21:48:49 2016, AT, DACQ
|
19:00 Test calibration |
Fri Nov 25 21:47:05 2016, AT, Background Beam OFF 
|
16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after beam ON. File:
|
Fri Nov 25 03:49:44 2016, AT, Background Beam ON
|
16/11/25 12h28min: Background measurement beam ON 19B |
Fri Nov 25 03:41:40 2016, AT, Run setups
|
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on
http://ribfdaq/~gamma16/expdbrunsum.php
|
Fri Nov 25 03:37:23 2016, AT, Background Beam OFF/ON  
|
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C
21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved
|
Fri Nov 25 03:15:46 2016, AT, Background Beam ON
|
16/11/24 19h38min:
Background measurement during tunning of BigRips from 27-29F to 22C is started.
|
Thu Nov 24 14:57:55 2016, AT, Background Beam ON 
|
Starting from today 12:22, the background generated by the different setups on BigRips is monitorized.
- 30 min aprox Beam off
|
Thu Nov 24 14:36:27 2016, AT, 252Cf
|
Check of calibrations and rates for neutron detectors with Conf File 161107Conf_BrikenFull.xlsx
Measurement 161122_2208_003.root has been used to check the calibrations and counting rates in the BRIKEN
|
Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x
|
PDFs of the local ELog for the RIBF123R1 experiment Nov 2016 |
Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover
|
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV.
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
|
Tue Nov 22 10:17:57 2016, ATS, PV, LIU, 252Cf
|
Measurement with 252Cf at Z=22.5cm from the moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Beam is off.
|
Tue Nov 22 09:26:04 2016, A. Tarifeno-Saldivia, Noise check
|
Run for checking the noise just after turn on the crates, without high voltages on the PREAMPS.
Attached calibrated histogram for the full BRIKEN detector.
|