Entry  Sat Nov 26 09:31:05 2016, Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa, Output signals from G7Red G7red_01.svg02.svg03.svg06.svg
Preamplifier of crystal G7Red was replaced. 
Output signals from G7Red are weird.
Entry  Sat Nov 26 06:37:37 2016, AT, 41Al run 1 
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
Entry  Sat Nov 26 06:30:30 2016, AT, Setup 
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
Entry  Sat Nov 26 00:15:12 2016, AT, 41Al run0 161126_0815_000_RateBRIKEN.svg
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
Entry  Sat Nov 26 00:04:15 2016, AT, Elog 
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Entry  Fri Nov 25 23:18:04 2016, BRIKEN collaboration, Fallon Parasitic experiments 
=====   START OF PARASITIC EXPERIMENTS  ======
Entry  Fri Nov 25 21:50:42 2016, AT, New Conf File 
161125Conf_BrikenFull.xlsx
Entry  Fri Nov 25 21:49:36 2016, AT, Background Beam OFF 
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
Entry  Fri Nov 25 21:48:49 2016, AT, DACQ 
19:00  Test calibration 
Entry  Fri Nov 25 21:47:05 2016, AT, Background Beam OFF 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
Entry  Fri Nov 25 03:49:44 2016, AT, Background Beam ON 
16/11/25 12h28min: Background measurement beam ON 19B
Entry  Fri Nov 25 03:41:40 2016, AT, Run setups RUNsum_kanagoda.pdf
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php
Entry  Fri Nov 25 03:37:23 2016, AT, Background Beam OFF/ON 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C

21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved 
Entry  Fri Nov 25 03:15:46 2016, AT, Background Beam ON 
16/11/24 19h38min:  
Background measurement during tunning of BigRips from 27-29F to 22C is started.
Entry  Thu Nov 24 14:57:55 2016, AT, Background Beam ON 161124_1222_010_BRIKEN.svg161124_1222_010_RateBRIKEN.svg
Starting from today 12:22, the background generated by the different setups on BigRips is monitorized.

- 30 min aprox Beam off
Entry  Thu Nov 24 14:36:27 2016, AT, 252Cf CalibrationCheck_161122.xlsx
Check of calibrations and rates for neutron detectors with Conf File 161107Conf_BrikenFull.xlsx

Measurement 161122_2208_003.root has been used to check the calibrations and counting rates in the BRIKEN
Entry  Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x
PDFs of the local ELog for the RIBF123R1 experiment Nov 2016
Entry  Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover 
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
Entry  Tue Nov 22 10:17:57 2016, ATS, PV, LIU, 252Cf 161122_2208_003_BRIKEN.svg
Measurement with 252Cf at Z=22.5cm from the moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Beam is off.
Entry  Tue Nov 22 09:26:04 2016, A. Tarifeno-Saldivia, Noise check 161122_1820_000_BRIKEN.svg
Run for checking the noise just after turn on the crates, without high voltages on the PREAMPS.

Attached calibrated histogram for the full BRIKEN detector. 