AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 13 of 21  ELOG logo
Entry  Sat Nov 26 09:31:05 2016, Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa, Output signals from G7Red G7red_01.svg02.svg03.svg06.svg
Preamplifier of crystal G7Red was replaced. 
Output signals from G7Red are weird.

Several screen-shots of the signal are attached. The time calibration factor is 20ns/sample. 
Entry  Sat Nov 26 06:37:37 2016, AT, 41Al run 1 
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
3mm Pb (fixed on the beam)

11:14  Online is saved and then cleared
file:   161126_1107_001_1114.root

Rates:
F11R	:   10.5Hz
BRIKEN	:  170 Hz

11:18 Tungsten degraders are removed.

11:20 Beam Off

11:30 Beam ON

OBS:  Something happens in between with the beam intensity!!!  
Rates:
F11R	:   10.5Hz   &&  4.54 Hz
BRIKEN	:  177.7 Hz  && 160 Hz

11:41 Beam OFF

11:55 Acquisition is stopped. Files
 161126_1107_001.dlt  (full run)
 161126_1107_001.root  (Online from 11:18)
Entry  Sat Nov 26 06:30:30 2016, AT, Setup 
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u

Degraders:
- Pb 3mm width  ---> IN beam
- Tungsten:
 1) 0.5 mm W + 1mm Al  ---> IN/OUT beam
 2) 0.3 mm W + 1mm Al  ---> IN/OUT beam
 3) 1.0 mm W + 1mm Al  ---> IN/OUT beam
Entry  Sat Nov 26 00:15:12 2016, AT, 41Al run0 161126_0815_000_RateBRIKEN.svg
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers

08:45    
Beam Off for intervention

08:50    
Degrader is modified to 3mm Pb

09:44    
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root

Rates:
BRIKEN	:  85.2 Hz
F11R	: 33.5 Hz

Daq Conf. File	: 161125Conf_BrikenFull.xlsx
Entry  Sat Nov 26 00:04:15 2016, AT, Elog 
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Elog is found in http://ribf-exp.riken.jp/elog/DALI2+Fall+2016/

BRIKEN collaboration: 
We keep elog from Takeshi experiments (Nishimura-san desicion!). This elog is found in 

http://ribf-exp.riken.jp/elog/RIBF123/
Entry  Fri Nov 25 23:18:04 2016, BRIKEN collaboration, Fallon Parasitic experiments 
=====   START OF PARASITIC EXPERIMENTS  ======
Entry  Fri Nov 25 21:50:42 2016, AT, New Conf File 
161125Conf_BrikenFull.xlsx
Entry  Fri Nov 25 21:49:36 2016, AT, Background Beam OFF 
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
Entry  Fri Nov 25 21:48:49 2016, AT, DACQ 
19:00  Test calibration 
Entry  Fri Nov 25 21:47:05 2016, AT, Background Beam OFF 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
161125_1617_017.dlt
161125_1617_017.root

BRIKEN rate beam OFF (background): 0.34 +- 0.03 n/s
Entry  Fri Nov 25 03:49:44 2016, AT, Background Beam ON 
16/11/25 12h28min: Background measurement beam ON 19B
Entry  Fri Nov 25 03:41:40 2016, AT, Run setups RUNsum_kanagoda.pdf
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php

A copy of the information in this page is placed here!

According to their Setup, they are using C targets on F8 and F11. The targets can be IN/OUT.
Entry  Fri Nov 25 03:37:23 2016, AT, Background Beam OFF/ON 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C

21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved 
File:        161124_2106_013.root 
Entry  Fri Nov 25 03:15:46 2016, AT, Background Beam ON 
16/11/24 19h38min:  
Background measurement during tunning of BigRips from 27-29F to 22C is started.


Files: 
161124_1938_012.dlt
161124_1938_012.root
Entry  Thu Nov 24 14:57:55 2016, AT, Background Beam ON 161124_1222_010_BRIKEN.svg161124_1222_010_RateBRIKEN.svg
Starting from today 12:22, the background generated by the different setups on BigRips is monitorized.

- 30 min aprox Beam off
- 25 min aprox 29F after C target in F8
- 14 min aprox Beam Off
- 272 min aprox 27F
- 11.5 min Beam Off
- Tunning for 10Min

Adquisition is stopped at 18:22

Files: 
161124_1222_010.dlt
161124_1222_011.dlt
161124_1222_010.root (online)

The RUN summary for this experiments is found in
http://ribfdaq/~gamma16/expdbrunsum.php (Access only from RIKEN)
Entry  Thu Nov 24 14:36:27 2016, AT, 252Cf CalibrationCheck_161122.xlsx
Check of calibrations and rates for neutron detectors with Conf File 161107Conf_BrikenFull.xlsx

Measurement 161122_2208_003.root has been used to check the calibrations and counting rates in the BRIKEN
detector. Condition of the measurement:
252Cf at 22.5cm from moderator, opposite sede from AIDA

RESULTS

Calibrations factors:
Calibrations of the neutron detectors are reasonable in the current conditions. A check detector by detector
(see attached file) shows that the full peak for most of the counters is around 764keV. Only 3 counters are
shifted more than 10keV:
He134	741.901
He135	750.312
He140	748.587	

The impact on the counting rates would not be serious.

Counting rates (n/pulser):
#########################################
Total neutron rate:	1516.28
#########################################
	BY RING:
#########################################
R1	359.057
R2	222.997
R3	386.299
R4	253.833
R5	143.434
R6	90.6357
R7	60.025

The total current counting rate is lower than rate obtained in Oct 12th (total 1550.91 n/pulser). The difference
is due mainly to a decrease in the counting rates for rings 1 to 4.
Entry  Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x

PDFs of the local ELog for the RIBF123R1 experiment Nov 2016

Entry  Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover 
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
turning up.
We have turned down the HV after that.
We've checked that the NIM crate power supply for the preamp is On and the HV and peamplifier connections for
this Clover are Ok.
Entry  Tue Nov 22 10:17:57 2016, ATS, PV, LIU, 252Cf 161122_2208_003_BRIKEN.svg
Measurement with 252Cf at Z=22.5cm from the moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Beam is off.

Files: 
161122_1820_001.dlt
161122_1820_002.dlt
161122_1820_001.root
Obs: There is a problem in the online data for this run. DAQ for VME1 do not stored data. This problems seems to
be a crash on the DAQ. I restarted the system and run again the measurement. The display for voltages has lost
connection. The channels on VME1 have been checked, no problems is observed in the waveforms.

Again, this time without observing problems:
File:
161122_2208_003.dlt
161122_2208_003.root

BRIKEN spectrum is attached for this run. Counts in the pulser are 1.123e4
Entry  Tue Nov 22 09:26:04 2016, A. Tarifeno-Saldivia, Noise check 161122_1820_000_BRIKEN.svg
Run for checking the noise just after turn on the crates, without high voltages on the PREAMPS.

Attached calibrated histogram for the full BRIKEN detector. 

Files:
161122_1820_000.dlt
161122_1820_000.root

Pulser counts: 1.179e4
ELOG V3.1.4-unknown