Tue Nov 8 11:51:28 2016, Ale, spikes on some spectra
|
Some spectra show spikes or do not look normal. This should be checked.
Look at BRIKEN, Ring4, Ring5, Ring6, Ring7, D4, G7, Clovers,
|
Tue Nov 22 10:17:57 2016, ATS, PV, LIU, 252Cf
|
Measurement with 252Cf at Z=22.5cm from the moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Beam is off.
|
Thu Oct 25 09:07:00 2018, ATS & JLT, BRIKEN Calibration check
|
We put the 252Cf source and check the aligment of 3He tubes gains:
File: 181025_1600_252Cf_gaincheck.root
|
Thu Oct 25 09:18:24 2018, ATS & JLT, F11 plastic
|
F11 plastic (long plastic after MUSIC chamber)
connected to DACQ.
The connections were re-cabled and verified.
|
Thu Oct 25 16:04:17 2018, ATS & JLT, Background
|
Background BRIKEN control measurement
No DLT
|
Thu Oct 25 16:08:53 2018, ATS & JLT, Lead bricks
|
| Lead bricks in BRIKEN hole to protect AIDA |
Fri Oct 26 03:24:25 2018, ATS & JLT, Background
|
Background BRIKEN control measurement
No DLT
|
Fri Oct 26 03:57:37 2018, ATS & JLT, Background
|
Background BRIKEN control measurement
No DLT
|
Tue Oct 16 03:15:03 2018, ATD & JLT, Start of REP run preparation (RIBF148)
|
16-Oct-2018
- Start DACQ computer: OK!
|
Tue Oct 16 08:57:56 2018, ATD & JLT, 252Cf source
|
252Cf source Run
START:?
STOP: 16:56
|
Tue Oct 16 09:00:02 2018, ATD & JLT, Background measurement overnight
|
18/10/16 START: 16:56
18/10/17 STOP: 9:51
|
Thu Oct 18 08:21:18 2018, AT2, JLT, SN, 252Cf long measure, z=0cm, no clovers
|
18/10/18 START: 17:22
18/10/18 STOP: 20:09
|
Thu Oct 18 12:16:39 2018, AT2, JLT, SN, 252Cf long measure, z=15cm beam upstream, no clovers
|
18/10/18 START: 20:20
18/10/18 STOP: 23:17
|
Thu Oct 18 15:24:40 2018, AT2, JLT, SN, 252Cf long measure, z=25cm beam upstream, no clovers
|
18/10/18 START: 23:23
18/10/19 STOP: 08:23
|
Fri Oct 19 00:28:48 2018, AT2, JLT, SN, background measurement, no clovers 
|
18/10/19 START: 08:31
18/10/19 STOP: 10:50
|
Fri Oct 26 03:31:33 2018, AT2 & JA, Test pulser effect on baseline 6x
|
We have tested possible change of the baseline in the digitizer due to the pulser connection. NO EFFECT has been
found!
|
Thu May 25 13:24:02 2017, AT,PC,KR,JLT,AA, CLOVER, detector not in its rigth position
|
We have noticed that D4 is not in its right position. That explains the different number of counts in the
detectors.
Probably of the order of 3 cm away from its nominal place.
|
Fri May 26 03:52:23 2017, AT,AA,JLT, CLOVER, 137Cs
|
137Cs, No AIDA, Efficiency calibration
Source ID: 393
|
Thu May 25 13:42:45 2017, AT, PC,KR,JLT,AA, 252Cf
|
252Cf source in Z=0cm position.
Start:21:41
|
Thu May 25 13:38:11 2017, AT, PC, KR, JLT, AA, Clover, detectors in new position  
|
Both clover detectors were moved. They are in a symmetrical position. The end on the clover nose is of the order
of 3-4 mm from the AIDA tunnel.
|