139
|
Tue Nov 8 11:51:28 2016 |
Ale | spikes on some spectra | Some spectra show spikes or do not look normal.
This should be checked.
|
|
155
|
Tue Nov 22 10:17:57 2016 |
ATS, PV, LIU | 252Cf | Measurement with 252Cf at Z=22.5cm from the
moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
|
|
390
|
Thu Oct 25 09:07:00 2018 |
ATS & JLT | BRIKEN Calibration check | We put the 252Cf source and check the aligment
of 3He tubes gains:
|
|
391
|
Thu Oct 25 09:18:24 2018 |
ATS & JLT | F11 plastic | F11 plastic (long plastic after MUSIC chamber)
connected to DACQ.
|
|
393
|
Thu Oct 25 16:04:17 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
394
|
Thu Oct 25 16:08:53 2018 |
ATS & JLT | Lead bricks | Lead bricks in BRIKEN hole to protect AIDA |
|
395
|
Fri Oct 26 03:24:25 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
397
|
Fri Oct 26 03:57:37 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
358
|
Tue Oct 16 03:15:03 2018 |
ATD & JLT | Start of REP run preparation (RIBF148) | 16-Oct-2018
- Start DACQ computer: OK!
|
|
359
|
Tue Oct 16 08:57:56 2018 |
ATD & JLT | 252Cf source | 252Cf source Run
START:?
STOP: 16:56
|
|
360
|
Tue Oct 16 09:00:02 2018 |
ATD & JLT | Background measurement overnight |
18/10/16 START: 16:56
18/10/17 STOP: 9:51
|
|
365
|
Thu Oct 18 08:21:18 2018 |
AT2, JLT, SN | 252Cf long measure, z=0cm, no clovers |
18/10/18 START: 17:22
18/10/18 STOP: 20:09
|
|
366
|
Thu Oct 18 12:16:39 2018 |
AT2, JLT, SN | 252Cf long measure, z=15cm beam upstream, no clovers |
18/10/18 START: 20:20
18/10/18 STOP: 23:17
|
|
367
|
Thu Oct 18 15:24:40 2018 |
AT2, JLT, SN | 252Cf long measure, z=25cm beam upstream, no clovers |
18/10/18 START: 23:23
18/10/19 STOP: 08:23
|
|
368
|
Fri Oct 19 00:28:48 2018 |
AT2, JLT, SN | background measurement, no clovers |
18/10/19 START: 08:31
18/10/19 STOP: 10:50
|
 |
396
|
Fri Oct 26 03:31:33 2018 |
AT2 & JA | Test pulser effect on baseline | We have tested possible change of the baseline
in the digitizer due to the pulser connection.
NO EFFECT has been
|
6x |
299
|
Thu May 25 13:24:02 2017 |
AT,PC,KR,JLT,AA | CLOVER, detector not in its rigth position | We have noticed that D4 is not in its right
position. That explains the different number
of counts in the
|
|
306
|
Fri May 26 03:52:23 2017 |
AT,AA,JLT | CLOVER, 137Cs | 137Cs, No AIDA, Efficiency calibration
Source ID: 393
|
|
301
|
Thu May 25 13:42:45 2017 |
AT, PC,KR,JLT,AA | 252Cf | 252Cf source in Z=0cm position.
Start:21:41
|
|
300
|
Thu May 25 13:38:11 2017 |
AT, PC, KR, JLT, AA | Clover, detectors in new position | Both clover detectors were moved. They are
in a symmetrical position. The end on the
clover nose is of the order
|
  |