AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 2 of 21  ELOG logo
    Reply  Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup Full_BRIKEN_Setup-includingTakechi.pdf


Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
Entry  Sat Nov 5 16:27:13 2016, Tain,Ale,Jorge,Alvaro, 62Ni beam in F11 empty target 
Empty position of the target ladder at F11
(hole is smaller than beam size)
Entry  Sat Nov 5 17:07:27 2016, Tain, Alvaro, Jorge, 62Ni in F7 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
62Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty position.
Entry  Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run 
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 
Entry  Sat Nov 5 15:07:11 2016, Tain, Ale, 62Ni beam on F11 C-6mm 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
Entry  Mon Nov 7 04:49:57 2016, Tain, Ale, AIDA plastic (veto) and Si de calibration 
AIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the spectrum seen in the detectors was used.
Entry  Sun Nov 6 06:27:49 2016, Tain et al., 58Ni on F11 C-6mm in 
New calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
Entry  Sun Nov 6 06:39:23 2016, Tain et al., 58Ni on F11 C-6mm 161106_1609_58Ni_F11_empty_Rates.pdf
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV
Entry  Sun Nov 6 07:16:59 2016, Tain et al., 58Ni on F7 CH2 F11 empty/C6mm 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
Entry  Sun Nov 6 23:35:42 2016, Tain et al., Overnight measurement: Ca isotopes 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf
First 50,49,48Ca beam and then 47,46,45Ca beam
C-6mm IN and OUT
Entry  Sat Nov 5 01:25:24 2016, Tain et al, End of Beam Line Setup 9x
Some photos of the elements in the last part of the beam line
during Takechi run.
Entry  Sat Nov 5 03:36:34 2016, Tain et al, Ancillary detectors VetoBottomPlastic.JPGVetoTopPlastic.JPGAIDAPlasticShaped.JPG
Some info on ancillary detector signals

Plastic veto detectors (Top and Botomm):
Entry  Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run 
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
Entry  Tue Nov 8 08:49:51 2016, Tain et al, Move ELOG 
We will start to use the internal RIKEN ELOG
It is not clear that we can keep the present ELOG also updated
Entry  Tue Nov 8 06:13:11 2016, Tain et al, New plastic detector in F11 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg
There is a new plastic scintillator
after the MUSIC chambers
Entry  Wed Oct 25 18:12:43 2017, Sunflower collaboration, Gamma sources web page 
http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html
Entry  Mon May 4 03:20:00 2015, Shunji Nishimura, RNC New Rule kanri_e.pdf
We have some new rule about the data taken at RNC from this year. 
Shunji
 
Entry  Mon Jul 18 09:32:50 2016, Shintaro Go, HV controls 
You can start applying HVs on the detectors using macro on the control-computer.
If you have already signed in the computer that controls mpod,
1. Type http://192.168.13.239/  to monitor the status of HV.
Entry  Thu Mar 30 16:15:24 2017, SN, JLT, GK, DK, JLiu, 40Mg run 21 
Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
Entry  Thu Mar 30 07:31:09 2017, SN PV CG RCF JA, Run 14 
Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
ELOG V3.1.3-7933898