Sun May 3 09:04:07 2015, J.L. Tain, J. Agramunt, G. Kiss, Summary of neutron measurements
|
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
|
Wed Oct 25 01:02:14 2017, RG, Status of the YSO array
|
The presently used detector has 48x48x5 mm3 YSO array with 1x1mm2 segments. They are separated with ESR. We use H8500 pspmt and 2 mm quartz diffuser
with rough edges. Coupling is done with sylgard. Anger logic uses a conventional resistive network with 1kohm and we have 4 position signals and
dynode. The position signals (xa,xb,ya,yb) are split in Low gain branch connected directly to 5V range input in Struck and High gain branch, which |
Wed Mar 29 13:31:37 2017, J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain, Start of parasitic
|
Start of parasitic Ca beam
(main experiment "New isotope search", Ahn et al.)
|
Tue Oct 16 03:15:03 2018, ATD & JLT, Start of REP run preparation (RIBF148)
|
16-Oct-2018
- Start DACQ computer: OK!
|
Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector  
|
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector has an effective area of 134 x 123 mm and 320 micrometer thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN) |
Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased
|
We increase the bias voltage of the dE detector from 20 V to 100 V
Leakage current:
Before: ~0.590 uA |
Mon Nov 7 04:37:33 2016, Phong,Liu,..., Si de and AIDA plastic calibration
|
60Co source placed close to the detectors:
ROOT files:
|
Tue Nov 8 17:00:27 2016, NTB, CG, AT, Si Delta E
|
At least during the timeframe in between ~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root) we see that the silicon dE have a very low counting
rate. ~1Hz when the first AIDA detector sees ~600 Hz and a cumulative ~2kHz. The energy range in the dE stops at ~10MeV.
Edit: It appears the Si dE were removed. Some signals are still in the spectra. |
Mon Jun 12 02:45:44 2017, Iris Dillmann AT, Setup detectors. Id of Ancillary@BRIKEN 
|
Attachment 1: Setup detectors
Attachment 2: example of configuration file (valid only for RIBF127). The Id of the ancillary detectors are:
|
Sat Nov 26 06:30:30 2016, AT, Setup
|
Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
|
Mon Oct 16 05:52:14 2017, BRIKEN collaboration, START preparation
|
We start to check every thing for the coming run
New directory: /data/1710Preparation/
|
Wed May 24 06:42:05 2017, JLT,AT,AM,RY,SG, START Preparation
|
We start to check every thing for the coming run
New directory: /data/1705Preparation/
|
Thu Oct 6 02:03:32 2016, JL Tain, START 6x
|
We started the assembly of BRIKEN and AIDA detectors in their final position
on Tuesday October 4:
|
Thu Nov 3 04:40:02 2016, All, START
|
Start of commissioning preparation
|
Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol
|
Preliminary |
Fri Nov 25 03:41:40 2016, AT, Run setups
|
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on
http://ribfdaq/~gamma16/expdbrunsum.php
|
Sat Apr 1 02:07:49 2017, ID DK JA, Run 55
|
Date: 1/04/2017
Start:10:04
BRIKEN run: 55
|
Fri Mar 31 10:35:22 2017, PV CG JA, Run 40
|
Date: 31/03/2017
Start:
BRIKEN run: 40
|
Fri Mar 31 09:23:45 2017, CG PV JA, Run 39
|
Date: 31/03/2017
Start: 17:22
BRIKEN run: 039
|
Fri Mar 31 08:23:32 2017, CG PV JA, Run 38
|
Date: 31/03/2017
Start: 16:21
BRIKEN run: 038
|