AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 3 of 21  ELOG logo
Entry  Sun May 3 09:04:07 2015, J.L. Tain, J. Agramunt, G. Kiss, Summary of neutron measurements  

U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
Entry  Wed Oct 25 01:02:14 2017, RG, Status of the YSO array 
The presently used detector has 48x48x5 mm3 YSO array with 1x1mm2 segments. They are separated with ESR.  We use H8500 pspmt and 2 mm quartz diffuser
with rough edges. Coupling is done with sylgard.  Anger logic uses a conventional resistive network with 1kohm and we have 4 position signals and
dynode.  The position signals (xa,xb,ya,yb) are split in Low gain branch connected directly to 5V range input in Struck and High gain branch, which
Entry  Wed Mar 29 13:31:37 2017, J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain, Start of parasitic 170329_Conf_BrikenFull.xlsx
Start of parasitic Ca beam
(main experiment "New isotope search", Ahn et al.)
Entry  Tue Oct 16 03:15:03 2018, ATD & JLT, Start of REP run preparation (RIBF148) Screenshot_from_2018-10-16_14-57-33.png
16-Oct-2018

- Start DACQ computer: OK!
Entry  Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector  has an effective area of 134 x 123 mm and  320 micrometer  thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN)
Entry  Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased 
We increase the bias voltage of the dE detector from 20 V to 100 V

Leakage current:

Before: ~0.590 uA
Entry  Mon Nov 7 04:37:33 2016, Phong,Liu,..., Si de and AIDA plastic calibration 
60Co source placed close to the detectors:

ROOT files: 
Entry  Tue Nov 8 17:00:27 2016, NTB, CG, AT, Si Delta E 
At least during the timeframe in between ~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root) we see that the silicon dE have a very low counting
rate. ~1Hz when the first AIDA detector sees ~600 Hz and a cumulative ~2kHz. The energy range in the dE stops at ~10MeV.

Edit: It appears the Si dE were removed. Some signals are still in the spectra.
Entry  Mon Jun 12 02:45:44 2017, Iris Dillmann AT, Setup detectors. Id of Ancillary@BRIKEN Setup-26May2017.pngOfflineConf_Signals.csv
Attachment 1: Setup detectors 
Attachment 2: example of configuration file (valid only for RIBF127). The Id of the ancillary detectors are:
Entry  Sat Nov 26 06:30:30 2016, AT, Setup 
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
Entry  Mon Oct 16 05:52:14 2017, BRIKEN collaboration, START preparation 171016_Conf_BrikenFull.xlsx
We start to check every thing for the coming run

New directory: /data/1710Preparation/
Entry  Wed May 24 06:42:05 2017, JLT,AT,AM,RY,SG, START Preparation 
We start to check every thing for the coming run

New directory: /data/1705Preparation/
Entry  Thu Oct 6 02:03:32 2016, JL Tain, START 6x
We started the assembly of BRIKEN and AIDA detectors in their final position
on Tuesday October 4:
Entry  Thu Nov 3 04:40:02 2016, All, START 161103Conf_BrikenFull.xlsx
Start of commissioning preparation

Entry  Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol GasificShort.pdf
Preliminary
Entry  Fri Nov 25 03:41:40 2016, AT, Run setups RUNsum_kanagoda.pdf
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php
Entry  Sat Apr 1 02:07:49 2017, ID DK JA, Run 55 
Date: 1/04/2017
Start:10:04
BRIKEN run: 55
Entry  Fri Mar 31 10:35:22 2017, PV CG JA, Run 40 
Date: 31/03/2017
Start: 
BRIKEN run: 40
Entry  Fri Mar 31 09:23:45 2017, CG PV JA, Run 39 
Date: 31/03/2017
Start: 17:22
BRIKEN run: 039
Entry  Fri Mar 31 08:23:32 2017, CG PV JA, Run 38 
Date: 31/03/2017
Start: 16:21
BRIKEN run: 038
ELOG V3.1.4-unknown