AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
Entry  Mon Nov 7 14:17:23 2016, BRIKEN collaboration, Picture of shift schedule IMG_20161107_183105.jpg
 
Entry  Tue Jul 19 04:34:57 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the electronics 9x
Racks, crates, rear part of the preamps and matrix with all tubes.
Entry  Tue Jul 19 11:54:03 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the AIDA insertion hole with the 3He tubes DSC_2520.JPGDSC_2517.JPGDSC_2515.JPG
RIKEN tubes on the AIDA side with the SHV right angle connector will protrude
by ~95mm in the HYBRID configuration (with CLOVERS). 
In the current AIDA DSSD configuration there are six detectors occupying 45-50mm 
Entry  Sun May 3 10:07:25 2015, J.L. Tain, J. Agramunt, G. Kiss, Photos of new PE shielding 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg
Photos of the general arrangement and details of the new PE blocks
Entry  Mon Nov 7 02:39:55 2016, Ale, Photo of the white board with the details on the cards and preamps at B1F New_Doc_160_2.pdf
Photo of the white board with the details on the cards and preamps at B1F
Entry  Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG
This Pb shielding structure is right behind the variable degrader
Entry  Thu Nov 22 07:01:36 2018, AT, PID high mass seting (165Pm) - RIBF148 F7pid_RIBF148_165PmSetting_labels.png
PID plot for the high mass setting (165Pm), run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification at F7.
Please use for internal reports about the BRIKEN activities.
Entry  Sun Nov 6 23:35:42 2016, Tain et al., Overnight measurement: Ca isotopes 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf
First 50,49,48Ca beam and then 47,46,45Ca beam
C-6mm IN and OUT
Entry  Sun Nov 6 03:12:55 2016, Alvaro,Jorge, Overnight measurement 
Measurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
Entry  Sat Nov 26 09:31:05 2016, Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa, Output signals from G7Red G7red_01.svg02.svg03.svg06.svg
Preamplifier of crystal G7Red was replaced. 
Output signals from G7Red are weird.
Entry  Mon Nov 28 10:48:21 2016, JLT, Online analysis analysis-271116.pdf
Comparison of current spectra with spectra from Takechi's run

(See attachment)
Entry  Mon Apr 27 10:18:21 2015, K.Gabor S.Nishimura J.Agramunt, ORNL 3He tube at RIKEN photo-3.JPG
 
Entry  Thu Oct 26 09:01:53 2017, BCR, Number of Counts vs Expected Efficiency for Proposals ExpectedBRIKEN_Precision.pdf
 

Here is a doc with an estimate of the statistical uncertainty P1n and P2n as a function of the number of implant-beta correlations for future
experiments.
Entry  Tue Nov 22 09:26:04 2016, A. Tarifeno-Saldivia, Noise check 161122_1820_000_BRIKEN.svg
Run for checking the noise just after turn on the crates, without high voltages on the PREAMPS.

Attached calibrated histogram for the full BRIKEN detector. 
Entry  Fri Oct 7 08:35:15 2016, JL Tain et al, Noise noiseDifferentTubes2.pdf
Low amplitude noise component.

The figure shows the composition of the low amplitude noise
Entry  Fri Oct 7 10:42:52 2016, JL Tain et al, Noise ORNL-DiffPreamp.pdf
We investigate the effect on the noise in ORNL tubes of using a differential PA.

We connect the tubes in current PA10 (126-140) to one of the new diff PA
Entry  Sun Oct 9 04:20:47 2016, JL Tain et al, Noise noHV.pdf161008_0642_noHV.pdf
We check for the appearance of spurious signals in the preamplifiers.

We set all HV to zero and run a measurement for several hours.
Entry  Sun Oct 9 18:19:01 2016, JL Tain et al, Noise 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf
Optimization of ADC thresholds

In order to try to reduce the grass-like background
Entry  Wed Oct 12 05:06:57 2016, JL Tain et al, Noise He136-nosource.pdfHe136-137Cs.pdf
Gamma source close to ORNL2 tube

In order to investigate the origin of the background
Entry  Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover 
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
ELOG V3.1.3-7933898