AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 28 of 28  ELOG logo
ID Date Author Subjectup Text Attachments
  313   Sun Feb 27 20:19:06 2022 Rui-Jiu Chen, Yuriopen the valves of target.    
  342   Tue Mar 1 06:04:04 2022 SHB, MSpositionsjust FYI: current positions saved in files
are x=1000 and y=-750. this information is
good in case of crash.
  
  534   Tue Feb 20 08:41:08 2024 OF, AGstill no beam CRYRINGWe have mosty empty injections into CRYRING.
Only sporadically the beam with good intensity
is injected.
  
  354   Tue Mar 1 19:41:24 2022 PM, LVtarget temperature walkthroughA target temperature walkthrough has been
initiated at 20:41 since the target density
at S1 had slightly decreased (with ~0.1-0.2)
  
  242   Tue Feb 22 19:28:35 2022 David, YurivacuumAt 19:10 Frank called us that vacuum in
sections 08 and 10 got worse by about 1.5
times. There is a possible danger that vacuum
  
  362   Wed Mar 2 06:00:49 2022 Spillmann, Uwewaiting07:00
Target density is hovering between
2.0e-8 and 2.3e-8
  
ELOG V3.1.4-unknown