567
|
Fri May 31 21:03:21 2024 |
CB, EM | Run14 | 22:03
Before this run we checked quickly
beam with the target on but it does not make |
  |
503
|
Fri Feb 9 17:04:39 2024 |
JM, AR, CB, NH | Run12 - Background | |
|
502
|
Fri Feb 9 11:58:04 2024 |
TD + CB, JM, AR, NH, AB | Run10 contd, Run11 |
12.46 DAQ continues G22-88/R10_14
|
27x |
501
|
Fri Feb 9 07:57:38 2024 |
AR, CB, AB, JM | Run10 - First cool beam on target | 8:58
System wide checks okay, except
|
27x |
486
|
Fri Feb 2 08:59:36 2024 |
JM, TD, CB | Run1 start - pulser widths spreadsheet | Current pulser widths excel spreadsheet attached
09.58 DSSSD bias OK - attachment 1
|
20x |
488
|
Sat Feb 3 00:13:03 2024 |
CB TD | Run1 end - R3 start |
01.07 DAQ continues file G22-88/R1_46
background alpha
|
50x |
656
|
Wed Jun 19 12:06:50 2024 |
CB, OF, SS | Run 98/99/100 - higher energy | 10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
|
655
|
Wed Jun 19 12:04:02 2024 |
CB + OF, SS | Run 96/97 | Run 96 - as run 89, while we wait for beam
energy change at higher energies
Run stopped around 08:56 |
|
757
|
Tue Jun 17 23:51:58 2025 |
TD, CB, JG | Run 96 - continued |
00.31 DAQ continues data file G22-205/R96_27
|
23x |
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
755
|
Tue Jun 17 12:22:50 2025 |
CB EW JG AG SN | Run 94/95/96 | Run 94
Background with beam at 150 keV
and no target. |
|
653
|
Wed Jun 19 12:00:56 2024 |
CB | Run 93/94/95 - background | 04:00 17 June
Moved the detectors back to the
usual configuration (as per run 89). |
6x |
754
|
Tue Jun 17 12:14:30 2025 |
EW, CB, AG | Run 93- Background with beam 150keV | Run 93- New run at 150keV, background with
beam
13:15 All checks ok |
   |
753
|
Tue Jun 17 08:04:09 2025 |
EW, AG, CB | Run 92- Background with beam 90keV | Run 92- started at 09:00, background with
beam
Same settings as run 91 |
   |
652
|
Wed Jun 19 11:54:26 2024 |
CB | Run 91/92 - moving detectors | ~ 2:00 17 June
Run 91 |
    |
651
|
Mon Jun 17 23:10:08 2024 |
CB | Run 90 | 00:10
As run 89, detectors moved fully
out. |
 |
650
|
Mon Jun 17 16:26:00 2024 |
JM, RSS, CB | Run 89 | 17:20
(Run 87 Junk and Run 88 does not
exist) |
19x |
648
|
Mon Jun 17 05:47:35 2024 |
JM | Run 86 | 06:50
No sign of the resonance during
night shift. New run started but when operators |
|
647
|
Mon Jun 17 04:01:16 2024 |
JM | Run 85 | 05:00
Cooler voltage setpoint 247.45
V. |
|
646
|
Mon Jun 17 02:05:37 2024 |
JM | Run 84 | 03:00
Cooler voltage setpoint 247.7 V.
FC20 read value 247.15 V. |
|
|