AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 10 of 38  ELOG logo
Entry  Fri May 31 21:03:21 2024, CB, EM, Run14 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png
22:03

Before this run we checked quickly  beam with the target on but it does not make sense with the current status of the beam.

We removed target and starte Run14
Entry  Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background 
 
Entry  Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x

12.46 DAQ continues G22-88/R10_14
Entry  Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
8:58

System wide checks okay, except

   
Entry  Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
Current pulser widths excel spreadsheet attached

09.58 DSSSD bias OK - attachment 1 
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x

01.07 DAQ continues file G22-88/R1_46
      background alpha
Entry  Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy 
10:21 June 17

New energy: 1.125 MeV/u

Target in. Run 98 started.
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Run 96 - as run 89, while we wait for beam energy change at higher energies

Run stopped around 08:56 June 17

 
Entry  Tue Jun 17 23:51:58 2025, TD, CB, JG, Run 96 - continued 23x

00.31 DAQ continues data file G22-205/R96_27
      
Entry  Tue Jun 17 19:10:07 2025, NH, PMH, Run 96 7x
20:00 - Go to YR cave to see what is going on

20:20 - Beam back
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Run 94

Background with beam at 150 keV and no target.

Note energy is 0.15% off vs. beam and target to have a more realistic orbit.
Entry  Wed Jun 19 12:00:56 2024, CB, Run 93/94/95 - background 6x
04:00 17 June

Moved the detectors back to the usual configuration (as per run 89).

Moved target away - background run.
Entry  Tue Jun 17 12:14:30 2025, EW, CB, AG, Run 93- Background with beam 150keV Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png
Run 93- New run at 150keV, background with beam

13:15 All checks ok
Entry  Tue Jun 17 08:04:09 2025, EW, AG, CB, Run 92- Background with beam 90keV Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png
Run 92- started at 09:00, background with beam

Same settings as run 91

See attachments for rates etc
Entry  Wed Jun 19 11:54:26 2024, CB, Run 91/92 - moving detectors Screenshot_from_2024-06-18_03-07-50.pngScreenshot_from_2024-06-18_03-53-51.pngScreenshot_from_2024-06-18_04-20-15.pngScreenshot_from_2024-06-18_04-20-18.pngScreenshot_from_2024-06-18_04-20-21.png
~ 2:00 17 June

 

Run 91
Entry  Mon Jun 17 23:10:08 2024, CB, Run 90 Screenshot_from_2024-06-18_01-21-47.pngScreenshot_from_2024-06-18_01-21-55.png
00:10

As run 89, detectors moved fully out.

 
Entry  Mon Jun 17 16:26:00 2024, JM, RSS, CB, Run 89 19x
17:20

(Run 87 Junk and Run 88 does not exist)

Beam charge state set to 5+. Energy is ~1.06 MeV/u
Entry  Mon Jun 17 05:47:35 2024, JM, Run 86 
06:50

No sign of the resonance during night shift. New run started but when operators are avaiable we will likely move to higher energies to try and
observe the (p,a) reaction.
Entry  Mon Jun 17 04:01:16 2024, JM, Run 85 
05:00

Cooler voltage setpoint 247.45 V.

FC20 read value 246.9 V.
Entry  Mon Jun 17 02:05:37 2024, JM, Run 84 
03:00

Cooler voltage setpoint 247.7 V.

FC20 read value 247.15 V.
ELOG V3.1.4-unknown