AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 10 of 34  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
14:50

 

Temperature, Statistics fine (see screenshots).
Entry  Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift  Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png
11:00

Changed slow comp threshold to 0x32 (500 keV). Checkloaded.

 
Entry  Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
10:30 Found ADC#4 on aida 1 and 4 are suddenly noisy. See attach 1-2. Checkloaded multiple times - no effect.

Leakage current overnight was stable, but a clear transient can be observed yesterday around the times of the DSSD motion test. We did not observe
this in the cave looking at the CAEN module - it might have been too fast.
Entry  Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals 20240205_174307.jpg
17.43 setup signals from detector movement controller.

See attachment 1
Entry  Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png

16.40 CB/ML install fibre optic cable from patch panel beneath dipole downstream of YR09/CARME chamber to VETAR2 front panel fibre connector - see attachments
1 & 2.
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png

13.41 DAQ start - file G22-88/R4
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
Entry  Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk 
1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x

01.07 DAQ continues file G22-88/R1_46
      background alpha
Entry  Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix  7x
DAQ and NewMerger appear to be cofigured correctly.

Can allocate device, create volume and open file with TapeServer but cannot write data.
Entry  Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
Current pulser widths excel spreadsheet attached

09.58 DSSSD bias OK - attachment 1 
Entry  Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup 
To include alll 16 FEE modules in the NewMerger we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi from MERGE.LinksAvailable string 5 to
MERGE.LinksAvailable string 15

We also edited the file /MIDAS/Linux/startup/NewMerger from ./master64 -i 8 -l 16 -p 11001  & to ./master64 -i 16 -l 16 -p 11001 
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay

11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved
Entry  Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
Removed ground from DSSD #1 to the chamber and set MACBs so that timestamp is from the NIM WR emulator not the VME VETAR2.

Root MACB mode 0x3 -> 0xd - all other MACB modes 0x3 ( unchanged ).

No timestamps observed from the emulator. Re-set to take timestamps from the VETAR" unit -> all timestamps observed.
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
This is how to update the MACB firmware using the opensource tool xc3sprog

Entry  Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x

09.00 CARME IE514 5.1e-11mbar
Entry  Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x

Test + and test - daisy chain cabling extended from DSSSD #1 to #2 to DSSSD #1 to DSSSD #4
 terminated by 50 Ohm at end of daisy chain
Entry  Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x

09.50 CARME IE514 5.1e-11 mbar ( ambient temperature 16 deg C )
Entry  Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems 
This is a suggested sequence of actions to help with the current problem with the White Rabbit timestamp distribution. Test the system between each intervention.
If a test provides an answer to the problem then proceed accordingly rather than continue with the suggestions.


Please sketch the current MACB wiring.
Unplug and replug the connectors of the VETAR HDMI connecting cable. If possible clean
ELOG V3.1.4-unknown