ID |
Date |
Author |
Subject |
Text |
 |
532
|
Mon Feb 19 21:46:32 2024 |
EH, EM, CB | Run 45 + end of late shift | 22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
|
14x |
714
|
Mon Jun 2 17:48:07 2025 |
JG, AG | Run 44 scraper tests | Same settings are Run 43 but with coasting
beam and scrapers set to: 30 / - 30
mm. |
 |
531
|
Mon Feb 19 08:45:22 2024 |
JM, JG, SHB, EM, EH | Run 44 - cooled beam on target | 09:43
Run 44 started cooled beam
on target |
35x |
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
713
|
Mon Jun 2 17:25:31 2025 |
JG, AG | Run 43 scraper tests | Same settings are Run 42 but bunched beam
and scrapers set to: 30 / - 30 mm.
|
|
202
|
Wed Feb 16 21:41:11 2022 |
JM | Run 43 Alpha Background | 22:41
Check Leakage current: (see attachment
1) = 10.01 uA and falling |
8x |
529
|
Mon Feb 19 05:10:48 2024 |
TD | Run 42 night shift contd. | 06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments |
6x |
528
|
Sun Feb 18 22:03:56 2024 |
TD | Run 42 night shift |
23.03 DAQ continues file G22-86/R42_21
|
47x |
530
|
Mon Feb 19 06:01:17 2024 |
SHB, JM, JG | Run 42 morning shift | 07:00
Observed reduction in YR09 presure
over last few hours in ML online plot. Beam |
6x |
712
|
Mon Jun 2 16:35:35 2025 |
EW, AG | Run 42 and scraper tests | 17:00
Scraper tests conducted. We tried
moving in the scrapers both at a fixed position |
 |
527
|
Sun Feb 18 13:58:33 2024 |
AR, OF, JM | Run 42 - cooled beam on target | Run 42 - 15:00
Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary. |
27x |
595
|
Fri Jun 7 10:05:40 2024 |
CB | Run 41/42/43 - 15N data taking start | 11:05
Confirmed overlap is at 4 mm under
new settings. |
8x |
200
|
Wed Feb 16 15:27:53 2022 |
EM, JM | Run 41 Pulser tests | 16:30
NOTE: Pulser is ON!
Check Leakage current: (see attachment |
11x |
711
|
Mon Jun 2 09:30:38 2025 |
JM, EW, ST | Run 41 | Run 41 started.
D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation |
6x |
525
|
Sun Feb 18 07:53:51 2024 |
HW AG | Run 40 Morning Shift | 08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1
Tempritures of, attchment 2 |
27x |
524
|
Sun Feb 18 00:16:55 2024 |
JM CB | Run 40 - night shift | 01:17
Run 40 continues.
Beam intensity looks OK. Oscillates |
15x |
523
|
Sat Feb 17 14:29:03 2024 |
JM, CB, AR, AB | Run 40 - cooled beam on target | 15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 |
31x |
710
|
Sun Jun 1 15:33:50 2025 |
EW, JM, CB | Run 40 | 16:30
Run 40 started.
D+ beam deuterium target. D+ beam |
10x |
594
|
Thu Jun 6 16:23:10 2024 |
LB CB JM | Run 39 - Run 40 15N | Started run 39.
We have the 15N+ beam with 426 |
15x |
709
|
Sun Jun 1 07:46:34 2025 |
JM, EM, CB | Run 39 | 08:45
Run 39 started.
D+ beam deuterium target. D+ beam |
7x |
|