AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 14 of 38  ELOG logo
ID Date Author Subjectdown Text Attachments
  532   Mon Feb 19 21:46:32 2024 EH, EM, CBRun 45 + end of late shift22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
 14x 
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  531   Mon Feb 19 08:45:22 2024 JM, JG, SHB, EM, EHRun 44 - cooled beam on target09:43

Run 44 started cooled beam
on target
 35x 
  596   Fri Jun 7 14:09:04 2024 JM, CB, DR, CN, LBRun 44 - 15N Data Taking15:35

Electron cooler voltage set point
= 244.3 V
  
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  202   Wed Feb 16 21:41:11 2022 JMRun 43 Alpha Background22:41

Check Leakage current: (see attachment
1) = 10.01 uA and falling
 8x 
  529   Mon Feb 19 05:10:48 2024 TDRun 42 night shift contd.06.03 DAQ continues file G22-86/R42_32

      DSSSD bias & leakage current - attachments
 6x 
  528   Sun Feb 18 22:03:56 2024 TDRun 42 night shift
23.03 DAQ continues file G22-86/R42_21
 47x 
  530   Mon Feb 19 06:01:17 2024 SHB, JM, JGRun 42 morning shift07:00

Observed reduction in YR09 presure
over last few hours in ML online plot. Beam
 6x 
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  527   Sun Feb 18 13:58:33 2024 AR, OF, JMRun 42 - cooled beam on targetRun 42 - 15:00

Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary.
 27x 
  595   Fri Jun 7 10:05:40 2024 CBRun 41/42/43 - 15N data taking start11:05

Confirmed overlap is at 4 mm under
new settings.
 8x 
  200   Wed Feb 16 15:27:53 2022 EM, JMRun 41 Pulser tests16:30

NOTE: Pulser is ON!

Check Leakage current: (see attachment
 11x 
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  525   Sun Feb 18 07:53:51 2024 HW AGRun 40 Morning Shift08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1

Tempritures of, attchment 2
 27x 
  524   Sun Feb 18 00:16:55 2024 JM CBRun 40 - night shift01:17

Run 40 continues.

Beam intensity looks OK. Oscillates
 15x 
  523   Sat Feb 17 14:29:03 2024 JM, CB, AR, ABRun 40 - cooled beam on target15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5
 31x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15NStarted run 39.

 

We have the 15N+ beam with 426
 15x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
ELOG V3.1.4-unknown