Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
|
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.
|
Mon Jun 2 17:48:07 2025, JG, AG, Run 44 scraper tests 
|
Same settings are Run 43 but with coasting beam and scrapers set to: 30 / - 30 mm.
all checks ok, but WR timestamp error, see attached |
Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
|
09:43
Run 44 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as previous runs |
Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking
|
15:35
Electron cooler voltage set point = 244.3 V
Electron cooler voltage readout = 243.75 V |
Mon Jun 2 17:25:31 2025, JG, AG, Run 43 scraper tests
|
Same settings are Run 42 but bunched beam and scrapers set to: 30 / - 30 mm.
|
Wed Feb 16 21:41:11 2022, JM, Run 43 Alpha Background 8x
|
22:41
Check Leakage current: (see attachment 1) = 10.01 uA and falling
Check NewMerger tab: (see attachment 2) |
Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
|
06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments 1-2
|
Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x
|
23.03 DAQ continues file G22-86/R42_21
|
Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
|
07:00
Observed reduction in YR09 presure over last few hours in ML online plot. Beam intensity looks OK but target density was fluctuating quite a
lot. Current value was 1.5e11. |
Mon Jun 2 16:35:35 2025, EW, AG, Run 42 and scraper tests 
|
17:00
Scraper tests conducted. We tried moving in the scrapers both at a fixed position throughout and also moving with the injection cycle.
We were unable to find a good position with the scrapers that did not produce significant scattering in the detectors. |
Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
|
Run 42 - 15:00
Detectors IN (left arm pot =36.54 mm, right arm pot = 70.49 mm). Stationary. Same as run 40
Electron cooler voltage 751.89 V this corresponds to 1.3444 MeV/u. This should be on the right of the peak of the resonance. |
Fri Jun 7 10:05:40 2024, CB, Run 41/42/43 - 15N data taking start 8x
|
11:05
Confirmed overlap is at 4 mm under new settings.
For unclear reasons, the bottom-left detector is not seeing the halo anymore since around 10:00. Rutherford still visible and if the left arm |
Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
|
16:30
NOTE: Pulser is ON!
Check Leakage current: (see attachment 1) |
Mon Jun 2 09:30:38 2025, JM, EW, ST, Run 41 6x
|
Run 41 started.
D+ beam deuterium target. D+ beam energy is 0.75 MeV/u. (beam calc calculation is 0.7619 MeV/u). See previous entry for beamcalc.
Beam calc - Attachment 1 |
Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
|
08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1
Tempritures of, attchment 2
System wide check, all correct. |
Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
|
01:17
Run 40 continues.
Beam intensity looks OK. Oscillates between just below 2.5e7 and just below 3e7. (attachment 1) |
Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
|
15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as run 35 |
Sun Jun 1 15:33:50 2025, EW, JM, CB, Run 40 10x
|
16:30
Run 40 started.
D+ beam deuterium target. D+ beam energy is 0.75 MeV/u. (beam calc calculation is 0.7619 MeV/u) |
Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
|
Started run 39.
We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam |
Sun Jun 1 07:46:34 2025, JM, EM, CB, Run 39 7x
|
08:45
Run 39 started.
D+ beam deuterium target. D+ beam energy is 1.0 MeV/u. (beam calc calculation is 1.0151 MeV/u) |