AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 14 of 38  ELOG logo
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.
Entry  Mon Jun 2 17:48:07 2025, JG, AG, Run 44 scraper tests Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png
Same settings are Run 43 but with coasting beam and scrapers set to:  30 / - 30 mm.

 

all checks ok, but WR timestamp error, see attached
Entry  Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
09:43

Run 44 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as previous runs
Entry  Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking 
15:35

Electron cooler voltage set point = 244.3 V

Electron cooler voltage readout = 243.75 V
Entry  Mon Jun 2 17:25:31 2025, JG, AG, Run 43 scraper tests 
Same settings are Run 42 but bunched beam and scrapers set to:  30 / - 30 mm.

 
Entry  Wed Feb 16 21:41:11 2022, JM, Run 43 Alpha Background 8x
22:41

Check Leakage current: (see attachment 1) = 10.01 uA and falling

Check NewMerger tab: (see attachment 2)
Entry  Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
06.03 DAQ continues file G22-86/R42_32

      DSSSD bias & leakage current - attachments 1-2
Entry  Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x

23.03 DAQ continues file G22-86/R42_21
Entry  Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
07:00

Observed reduction in YR09 presure over last few hours in ML online plot. Beam intensity looks OK but target density was fluctuating quite a
lot. Current value was 1.5e11.
Entry  Mon Jun 2 16:35:35 2025, EW, AG, Run 42 and scraper tests Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png
17:00

Scraper tests conducted. We tried moving in the scrapers both at a fixed position throughout and also moving with the injection cycle.

We were unable to find a good position with the scrapers that did not produce significant scattering in the detectors.
Entry  Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
Run 42 - 15:00

Detectors IN (left arm pot =36.54 mm, right arm pot = 70.49 mm). Stationary. Same as run 40

Electron cooler voltage 751.89 V this corresponds to 1.3444 MeV/u. This should be on the right of the peak of the resonance.
Entry  Fri Jun 7 10:05:40 2024, CB, Run 41/42/43 - 15N data taking start 8x
11:05

Confirmed overlap is at 4 mm under new settings.

For unclear reasons, the bottom-left detector is not seeing the halo anymore since around 10:00. Rutherford still visible and if the left arm
Entry  Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
16:30

NOTE: Pulser is ON!

Check Leakage current: (see attachment 1)
Entry  Mon Jun 2 09:30:38 2025, JM, EW, ST, Run 41 6x
Run 41 started.

D+ beam deuterium target. D+ beam energy is 0.75 MeV/u. (beam calc calculation is 0.7619 MeV/u). See previous entry for beamcalc.

Beam calc - Attachment 1
Entry  Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1

Tempritures of, attchment 2

System wide check, all correct.
Entry  Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
01:17

Run 40 continues.

Beam intensity looks OK. Oscillates between just below 2.5e7 and just below 3e7. (attachment 1)
Entry  Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as run 35
Entry  Sun Jun 1 15:33:50 2025, EW, JM, CB, Run 40 10x
16:30

Run 40 started.

D+ beam deuterium target. D+ beam energy is 0.75 MeV/u. (beam calc calculation is 0.7619 MeV/u)
Entry  Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
Started run 39.

 

We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam
Entry  Sun Jun 1 07:46:34 2025, JM, EM, CB, Run 39 7x
08:45

Run 39 started.

D+ beam deuterium target. D+ beam energy is 1.0 MeV/u. (beam calc calculation is 1.0151 MeV/u)
ELOG V3.1.4-unknown