Tue Mar 1 22:10:26 2022, David, George, Current status   
|
Ring current 6.67e7 particles/s
pressure at S1: 2.3-2.8e-8
Merger, Tape server (WS3): 1574 kB/s, writing ok
Leakage current (WS4): 3.20 uA
DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed
Online monitoring (WS 5): done |
Tue Mar 1 21:34:06 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0
'Check the White rabbit decoder status: Passed 0, Failed 5
target density at S1: 2.2-2.7e-8
temp: 110K
beam at injection: 7e7 |
Tue Mar 1 20:41:28 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0
'Check the White rabbit decoder status: Passed 0, Failed 5
target density at S1: 2.3-2.7e-8
temp: 110K
beam at injection: 7e7 |
Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough
|
A target temperature walkthrough has been initiated at 20:41 since the target density at S1 had slightly decreased (with ~0.1-0.2)
Current temprature 116K
set to 126K at 20:41
set to 95K at 20:47:30
set to 108.5K at 21:01:30, at this temperature was a sweetspot observerd for target density.
set to 109.7 at 21:08:30
set to 110K at 21:13:30 - we keep at this value for a while. the values at S1 are changing between 2.2-2.9e-8 |
Tue Mar 1 19:40:28 2022, PM, LV, check 12x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0
'Check the White rabbit decoder status: Passed 0, Failed 5
target density at S1: 2.1-2.3e-8
temp: 116K
beam at injection: 7e7 |
Tue Mar 1 18:43:41 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0
'Check the White rabbit decoder status: Passed 0, Failed 5
target density at S1: 2.1-2.4e-8
temp: 116K |
Tue Mar 1 17:36:04 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0
'Check the White rabbit decoder status: Passed 0, Failed 5
target density at S1: 2.1-2.4e-8
temp: 116K |
Tue Mar 1 16:57:34 2022, CB, LV, PMH, New run
|
Beam issues due to too long storage time in the last hours. Motors moved out and not moving.
Decreased storage time to 70 s. Seems OK now. Restarted motor movement as before
Started new run R86 |
Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change |
Tue Mar 1 12:58:32 2022, CB, MS, SS, ML, Synced pneumatic motion
|
New run R84
Attempting to sync pneumatic movement with ring. Still see something on t out -> p out
Command to move out was being given relative to the wrong time.
Fixed it. Still see one-two events every time we move out around 4-6 MeV. Attempted to greatly increase time before next injection - no difference. Microphonics from moving the detectors? It's just one-two counts on entire detector, acceptable.
New run R85
Now moving in/out
Potentiometer: 23.10 mm to 67.19 mm |
Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change |
Tue Mar 1 10:43:36 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': same
|
Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab
|
old potentiometer position 19.1 mm
new run number: 83
new potentiometer position : 27.58 mm
|
Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes |
Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
|
detector motors are still out
'Check Clock Status', 'Check ADC Calibration' : Clock status test result: Passed 5, Failed 0
'Check the White rabbit decoder status' :
Base Current Difference
aida01 fault 0xab60 : 0xab8f : 47
aida02 fault 0x88d3 : 0x8901 : 46
aida03 fault 0x23aa : 0x23d9 : 47
aida04 fault 0x15d7 : 0x1606 : 47
aida05 fault 0x2f03 : 0x2f0f : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR |
Tue Mar 1 06:04:04 2022, SHB, MS, positions
|
just FYI: current positions saved in files are x=1000 and y=-750. this information is good in case of crash.
|
Tue Mar 1 05:23:02 2022, JM, EM, Current status
|
06:20
Servo motors moved to fully out position as some work on the beam was neccessary. Beam injection had dropped from ~9e7 to around 1e7. Potentiometer reads 19.10 mm.
Still trying to improve target density. Current setpoint 100 K.
Merger OK
Data rate = 1600 kb/sec
Leakage current = 3.21 uA
System checks OK - wr fails
Base Current Difference
aida01 fault 0xab60 : 0xab8e : 46
aida02 fault 0x88d3 : 0x8900 : 45
aida03 fault 0x23aa : 0x23d8 : 46
aida04 fault 0x15d7 : 0x1605 : 46
aida05 fault 0x2f03 : 0x2f0f : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
Avg ring pressure = 4.3E-10 mbar.
06:40
Target density still very low. Setpoint back to 116 K. Detectors still fully out, very low rutherford rate.
Attempted to move nozzle to increase density, already on maximum point.
06:50
Setpoint to 95 k. Small increase in target density, however this was temporary
|
Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle
|
Have been unable to achieve decent target density with temperature cycling so far. Will attempt to go up to 300 k and back down to around 115 k which proved successful in previous shifts. |
Tue Mar 1 03:34:28 2022, JM, EM, Current status 7x
|
Temperature setpoint = 116 k
Detector IN potentiometer = 34.89 mm
Rutherford rate is reduced from previous entries. Avergae peak height appears to be ~50 counts. Fluctuations in peak height and E4 pressure are quite high. Temperature has been cycled, nozzle position has been optimised and different temperatures have been trialled however density cannot be maintained at a decent level.
Merger OK
Data rate ~ 1500 kb/sec
Leakage current = 3.2295 uA
Temperatures OK
System checks OK - wr fails
Base Current Difference
aida01 fault 0xab60 : 0xab8c : 44
aida02 fault 0x88d3 : 0x88fe : 43
aida03 fault 0x23aa : 0x23d6 : 44
aida04 fault 0x15d7 : 0x1603 : 44
aida05 fault 0x2f03 : 0x2f0f : 12
White Rabbit error counter test result: Passed 0, Failed 5
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
Avg ring pressure = 4.4 E-10 mbar
|
Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle
|
04:20
Did another temperature cycle (118 K -> 125 K -> 95 K -> 116 K) trying to improve the pressures at the target and the detector count rate.
Rates are still mostly below 100 counts (Ex rate) and the pressures are still fluctuating by about an order of magnitude (E4: between 1e-9 and 1e-8 mbar). |