Entry  Fri Jan 16 13:59:08 2026, JM, [How to] Startup CARME via x2go 
The startup procedure is the same as the regular startup as described in elog https://elog.ph.ed.ac.uk/CARME/666 with some important differences

x2go opens up the computer on the GSI network carme@atppc025

In order to access the carme computer and the CRYRING network we need to ssh. 
Entry  Fri Jan 16 13:54:08 2026, JM, Background run - R6/7 
12:00

Background run started via x2go - Run 6

We need to run for a while to gather sufficient stats on aida05, aida06, aida07 and aida08 channels to see which capacitance is best for the
Entry  Wed Jan 14 09:06:01 2026, EW, JM, Jan26 - electronic tests 7x
R3 pulser walkthrough completed.

Pulser amplitudes from 90,000 to 10,000 in steps of 10,000

Pulser peaks widths taken again. Some channels show big improvement. Note leakage currents are higher today. See previos elog
Entry  Tue Jan 13 12:59:37 2026, JM, EW, CARME startup - Jan26 tests 12x
13/01/26

Arrived at GSI.

Biased DSSDs. Noticed higher leakage currents than previous experiment circa 19uA for DSSD#1 and #3 and 9uA for DSSD#2 and #4
Entry  Thu Dec 18 16:30:49 2025, CB, ML, JM, Attempting to start CARME background Capture.PNG
ML flicked switch on CAEN bias module to Enable, and restored remote control.

Attempted to bias the DSSDs. Leakage currents significantly higher than before, but apparently stable. See attach 1.

Likely a vacuum gauge turned on? Will have to investigate.
Entry  Tue Aug 26 14:43:44 2025, JM, CB, EW, CARME on, background run  bias.png
26 August

14:40

Turned CARME on 
Entry  Thu Jul 17 07:07:56 2025, CB, CARME off Capture.PNG2.PNG3.PNGCapture.PNG
08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still high. - attached
Entry  Wed Jul 9 11:21:14 2025, EW, CB, CARME restarted - long background R98 32x
---9 July---

11:00

Turned detectors on - all stable see attachment 1 
Entry  Sun Jul 6 11:35:28 2025, CB, Anydesk version updated 
Updated anydesk to 6.3.2 CentOS7 release.

Works now.
Entry  Sat Jul 5 08:51:33 2025, EBM, anydesk connection settings anydesk_settings.png
 
Entry  Wed Jun 18 14:21:39 2025, CB, CARME off Screenshot_from_2025-06-18_15-18-31.png
15:20

DAQ stopped

Merger & Tape Server stopped
Entry  Tue Jun 17 23:51:58 2025, TD, CB, JG, Run 96 - continued 23x

00.31 DAQ continues data file G22-205/R96_27
      
Entry  Tue Jun 17 19:10:07 2025, NH, PMH, Run 96 7x
20:00 - Go to YR cave to see what is going on

20:20 - Beam back
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Run 94

Background with beam at 150 keV and no target.

Note energy is 0.15% off vs. beam and target to have a more realistic orbit.
Entry  Tue Jun 17 12:14:30 2025, EW, CB, AG, Run 93- Background with beam 150keV Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png
Run 93- New run at 150keV, background with beam

13:15 All checks ok
Entry  Tue Jun 17 08:04:09 2025, EW, AG, CB, Run 92- Background with beam 90keV Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png
Run 92- started at 09:00, background with beam

Same settings as run 91

See attachments for rates etc
Entry  Mon Jun 16 22:06:00 2025, CB, AR, EW, RUN 90-91 14x
23:00 DAQ restored and data now being written okay. Checks all okay, see screenshots below. Histograms reset. 40 bars in bottle @ 23:45 - should last
30 hours.

12:00 Checks all ok. No problems with aidas or writing to disk.
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Found all Merger Links background black - inactive. Nontheless the tapeservice was working, the data rate to disk was normal, and the file was being
written and the histograms were being updated.

Decided to stop DAQ, stop Merger, restart merger. Links rest to green background - but no more writing to disk!
Entry  Mon Jun 16 11:12:22 2025, JG, AK, AR, EH, run 83 8x
12:15 restarted measurement with target - Run 83

same settings as for runs 76, 77 etc

ROOT histograms NOT zeroed
Entry  Mon Jun 16 10:46:11 2025, CB JM JG AK, Run82 
Background without beam while source is optimised.