AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 38  ELOG logo
Entry  Thu Jul 17 07:07:56 2025, CB, CARME off Capture.PNG2.PNG3.PNGCapture.PNG
08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still high. - attached
Entry  Wed Jul 9 11:21:14 2025, EW, CB, CARME restarted - long background R98 32x
---9 July---

11:00

Turned detectors on - all stable see attachment 1 
Entry  Sun Jul 6 11:35:28 2025, CB, Anydesk version updated 
Updated anydesk to 6.3.2 CentOS7 release.

Works now.
Entry  Sat Jul 5 08:51:33 2025, EBM, anydesk connection settings anydesk_settings.png
 
Entry  Wed Jun 18 14:21:39 2025, CB, CARME off Screenshot_from_2025-06-18_15-18-31.png
15:20

DAQ stopped

Merger & Tape Server stopped
Entry  Tue Jun 17 23:51:58 2025, TD, CB, JG, Run 96 - continued 23x

00.31 DAQ continues data file G22-205/R96_27
      
Entry  Tue Jun 17 19:10:07 2025, NH, PMH, Run 96 7x
20:00 - Go to YR cave to see what is going on

20:20 - Beam back
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Run 94

Background with beam at 150 keV and no target.

Note energy is 0.15% off vs. beam and target to have a more realistic orbit.
Entry  Tue Jun 17 12:14:30 2025, EW, CB, AG, Run 93- Background with beam 150keV Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png
Run 93- New run at 150keV, background with beam

13:15 All checks ok
Entry  Tue Jun 17 08:04:09 2025, EW, AG, CB, Run 92- Background with beam 90keV Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png
Run 92- started at 09:00, background with beam

Same settings as run 91

See attachments for rates etc
Entry  Mon Jun 16 22:06:00 2025, CB, AR, EW, RUN 90-91 14x
23:00 DAQ restored and data now being written okay. Checks all okay, see screenshots below. Histograms reset. 40 bars in bottle @ 23:45 - should last
30 hours.

12:00 Checks all ok. No problems with aidas or writing to disk.
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Found all Merger Links background black - inactive. Nontheless the tapeservice was working, the data rate to disk was normal, and the file was being
written and the histograms were being updated.

Decided to stop DAQ, stop Merger, restart merger. Links rest to green background - but no more writing to disk!
Entry  Mon Jun 16 11:12:22 2025, JG, AK, AR, EH, run 83 8x
12:15 restarted measurement with target - Run 83

same settings as for runs 76, 77 etc

ROOT histograms NOT zeroed
Entry  Mon Jun 16 10:46:11 2025, CB JM JG AK, Run82 
Background without beam while source is optimised.
Entry  Mon Jun 16 08:17:41 2025, JG, D2 consumption 
The current bottle of D2 was installed on friday 06.06. at around 12:00. I assume we started at 200 bar.

Right now we have 50 bar remaining in this bottle (16.06. at 8:00).

This is an average consumption of ~15 bar/day
Entry  Sun Jun 15 10:46:35 2025, EW, EM, AR, AB, CB, JG, AK, Run 81 30x
11:45 New run started - run 81, same settings as previous runs (75, 76 etc)

ROOT histograms NOT zeroed

Beam at 2.5e8, target density at 3e12
Entry  Sun Jun 15 07:01:37 2025, EW, EM, Run 80 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png
08:00 New run started - run 80

Run whilst they are optimising the beam after losing it, everything else same as previous runs

ROOT histograms NOT zeroed
Entry  Fri Jun 13 19:41:32 2025, JG, SHB, JM, AR, EW, OF, Run 77, 78, 79 17x
New run started - Run 77 after refilling LN2 dewar

Same settings as Run 75 & 76

The root histos have not been reset, i.e. they show combined statistics of run 75, 76 and 77.
Entry  Fri Jun 13 16:39:18 2025, JG, SHB, Run 76 7x
Same settings as run 75.

Detector 4 is biased at 100V and switched from MEC to LEC.

The root histos have not been reset, i.e. they show combined statistics of run 75 and 76.
Entry  Fri Jun 13 14:45:58 2025, JG, SS, JM, CB, EW, AR, Run 75 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt
 

90 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam - @ -12.5mm

We do not expect to see see Rutherford due to energy loss in the dead layer, using other particle detector for normalsiation.
ELOG V3.1.4-unknown