  CARME, Page 1 of 39  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Subject Text Attachments
  768   Fri Jan 16 13:59:08 2026 JM[How to] Startup CARME via x2goThe startup procedure is the same as the
regular startup as described in elog https://elog.ph.ed.ac.uk/CARME/666
with some important differences
  
  767   Fri Jan 16 13:54:08 2026 JMBackground run - R612:00

Background run started via x2go
- Run 6
  
  766   Wed Jan 14 09:06:01 2026 EW, JMJan26 - electronic testsR3 pulser walkthrough completed.

Pulser amplitudes from 90,000 to
10,000 in steps of 10,000
 7x 
  765   Tue Jan 13 12:59:37 2026 JM, EWCARME startup - Jan26 tests13/01/26

Arrived at GSI.

Biased DSSDs. Noticed higher leakage
 12x 
  764   Thu Dec 18 16:30:49 2025 CB, ML, JMAttempting to start CARME backgroundML flicked switch on CAEN bias module to
Enable, and restored remote control.

Attempted to bias the DSSDs. Leakage
 Capture.PNG 
  763   Tue Aug 26 14:43:44 2025 JM, CB, EWCARME on, background run 26 August

14:40

Turned CARME on 
 bias.png 
  762   Thu Jul 17 07:07:56 2025 CBCARME off08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still
 Capture.PNG2.PNG3.PNGCapture.PNG 
  761   Wed Jul 9 11:21:14 2025 EW, CBCARME restarted - long background R98---9 July---

11:00

Turned detectors on - all stable
 32x 
  760   Sun Jul 6 11:35:28 2025 CBAnydesk version updatedUpdated anydesk to 6.3.2 CentOS7 release.

Works now.
  
  759   Sat Jul 5 08:51:33 2025 EBManydesk connection settings   anydesk_settings.png 
  758   Wed Jun 18 14:21:39 2025 CBCARME off15:20

DAQ stopped

Merger & Tape Server stopped
 Screenshot_from_2025-06-18_15-18-31.png 
  757   Tue Jun 17 23:51:58 2025 TD, CB, JGRun 96 - continued
00.31 DAQ continues data file G22-205/R96_27
      
 23x 
  756   Tue Jun 17 19:10:07 2025 NH, PMHRun 9620:00 - Go to YR cave to see what is going
on
 7x 
  755   Tue Jun 17 12:22:50 2025 CB EW JG AG SNRun 94/95/96Run 94

Background with beam at 150 keV
and no target.
 G35Voltage.pdf 
  754   Tue Jun 17 12:14:30 2025 EW, CB, AGRun 93- Background with beam 150keVRun 93- New run at 150keV, background with
beam

13:15 All checks ok
 Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png 
  753   Tue Jun 17 08:04:09 2025 EW, AG, CBRun 92- Background with beam 90keVRun 92- started at 09:00, background with
beam

Same settings as run 91
 Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png 
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
  750   Mon Jun 16 11:12:22 2025 JG, AK, AR, EHrun 8312:15 restarted measurement with target
- Run 83

same settings as for runs 76, 77
 8x 
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  