| ID |
Date |
Author |
Subject |
Text |
 |
|
405
|
Fri May 26 09:08:06 2023 |
JM, CB | Detector movement | Hopefully we will not be opening the chamber
for quite some time so find attached images
of all four installed detectors and a video |
 | |
416
|
Thu Jul 13 00:12:19 2023 |
JM, CB | Bellow replaced | The left (inside ring) bellow for the motors
rod was replaced.
Replacing the bellow involved; |
| |
417
|
Thu Jul 13 00:12:45 2023 |
JM, CB | CARME closed | The CARME chamber was closed and pushed
back into position on the ring.
Prior to moving back onto the ring, |
  | |
458
|
Fri Jan 5 12:29:10 2024 |
JM, CB | Further bias tests | Biased detectors this morning to 150V,
the leakage current for all detectors appears
stable and is ~3.5 uA. We have also replaced |
| |
467
|
Sun Jan 14 12:31:32 2024 |
JM, CB | FEE positions mac addresses | *Updated following FEE changes. Correct
as of 31/01/24
FEE modules are labelled according |
| |
484
|
Thu Feb 1 10:04:11 2024 |
JM, CB | Shaping time testing | Arrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according |
31x | |
485
|
Thu Feb 1 14:45:09 2024 |
JM, CB | NewMerger setup | To include alll 16 FEE modules in the NewMerger
we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi
from MERGE.LinksAvailable string 5 to MERGE.LinksAvailable |
| |
521
|
Sat Feb 17 06:19:27 2024 |
JM, CB | Run 35 - contd | 07:10
FEE temperatures OK
System checks OK |
    | |
522
|
Sat Feb 17 13:21:44 2024 |
JM, CB | Beam on target - motors tests | 14:01
Run 36 started.
We put both detectors to the fully |
  | |
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   | |
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   | |
605
|
Sun Jun 9 08:30:49 2024 |
JM, CB | Run 54 - beam on target | 09:30
New run 54 with:
Electron cooler setpoint |
7x | |
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
| |
725
|
Sat Jun 7 10:23:26 2025 |
JM, CB | carme-gsi rebooted | 10:00
The computer screen controlling
the DAQ on carme-gsi appeared to have crashed. |
| |
740
|
Thu Jun 12 14:08:42 2025 |
JM, CB | Run 72 - pulser walkthrough | Pulser walkthrough conducted while the
cave was open.
Pulser amplitudes 90000, 80000, |
| |
510
|
Tue Feb 13 17:19:43 2024 |
JM, AR, NP, AB, RSS | Run22 - cooled beam on target (definitely maybe) | 18:05 We believe we have an overlap between
the beam and the target. Run 22 started.
|
48x | |
503
|
Fri Feb 9 17:04:39 2024 |
JM, AR, CB, NH | Run12 - Background | |
| |
514
|
Wed Feb 14 16:52:46 2024 |
JM, AR, CB, JG | Run28 - beam on target |
Beam energy - 1.361 MeV/u
17:12 |
42x | |
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target | 21:32
New run 59
Right arm at 64.60 mm |
18x | |
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
|