AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 21 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  405   Fri May 26 09:08:06 2023 JM, CBDetector movement Hopefully we will not be opening the chamber
for quite some time so find attached images
of all four installed detectors and a video
 20230525_135756.jpgdetector-movement-in.mp4 
  416   Thu Jul 13 00:12:19 2023 JM, CBBellow replacedThe left (inside ring) bellow for the motors
rod was replaced.

Replacing the bellow involved;
 20230705_164523.jpg 
  417   Thu Jul 13 00:12:45 2023 JM, CBCARME closedThe CARME chamber was closed and pushed
back into position on the ring. 

Prior to moving back onto the ring,
 Bias110723.pngfullyin.jpgfullyin-measured.jpg 
  458   Fri Jan 5 12:29:10 2024 JM, CBFurther bias testsBiased detectors this morning to 150V,
the leakage current for all detectors appears
stable and is ~3.5 uA. We have also replaced
  
  467   Sun Jan 14 12:31:32 2024 JM, CBFEE positions mac addresses*Updated following FEE changes. Correct
as of 31/01/24

FEE modules are labelled according
 CARME-FEEs.jpg 
  484   Thu Feb 1 10:04:11 2024 JM, CBShaping time testingArrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according
 31x 
  485   Thu Feb 1 14:45:09 2024 JM, CBNewMerger setupTo include alll 16 FEE modules in the NewMerger
we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi
from MERGE.LinksAvailable string 5 to MERGE.LinksAvailable
  
  521   Sat Feb 17 06:19:27 2024 JM, CBRun 35 - contd07:10

FEE temperatures OK

System checks OK
 Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png 
  522   Sat Feb 17 13:21:44 2024 JM, CBBeam on target - motors tests14:01

Run 36 started.

We put both detectors to the fully
 Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png 
  557   Wed May 29 09:49:35 2024 JM, CBThreshold changes / D+ beam09:00

R4 alpha background continues,
currently R4_12
 Screenshot_from_2024-05-29_11-00-20.pngScreenshot_from_2024-05-29_11-01-30.pngScreenshot_from_2024-05-29_11-01-47.pngScreenshot_from_2024-05-29_11-02-03.png 
  591   Wed Jun 5 13:21:45 2024 JM, CBRun 36 - pulser walkthrough14:00

Access to the cave as Nikos and
Andreas have begun work on the target.
 Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png 
  605   Sun Jun 9 08:30:49 2024 JM, CBRun 54 - beam on target09:30

New run 54 with:

Electron cooler setpoint
 7x 
  606   Sun Jun 9 09:45:27 2024 JM, CBBeam-Target OverlapTarget density this morning had stabalised
at 7e11 at/cm2

This is sufficient to test the
 Beam-overlap.png 
  725   Sat Jun 7 10:23:26 2025 JM, CBcarme-gsi rebooted 10:00

The computer screen controlling
the DAQ on carme-gsi appeared to have crashed.
  
  740   Thu Jun 12 14:08:42 2025 JM, CBRun 72 - pulser walkthroughPulser walkthrough conducted while the
cave was open.

Pulser amplitudes 90000, 80000,
 Screenshot_from_2025-06-12_15-33-03.png 
  510   Tue Feb 13 17:19:43 2024 JM, AR, NP, AB, RSSRun22 - cooled beam on target (definitely maybe)18:05 We believe we have an overlap between
the beam and the target. Run 22 started.

         
 48x 
  503   Fri Feb 9 17:04:39 2024 JM, AR, CB, NHRun12 - Background    
  514   Wed Feb 14 16:52:46 2024 JM, AR, CB, JGRun28 - beam on target  

Beam energy - 1.361 MeV/u

17:12
 42x 
  614   Mon Jun 10 20:31:12 2024 JM, AK, EH, CBRun 59 Beam on target21:32

New run 59

Right arm at 64.60 mm
 18x 
  575   Sun Jun 2 13:04:41 2024 JM, AG, CB, DRRun 23 - vertical beam position and beam lifetime tests14:05

Run 22 stopped. Run 23 started
we will now adjust the vertical beam position
 Screenshot_from_2024-06-02_14-04-55.png 
ELOG V3.1.3-7933898