Entry  Sun Oct 31 13:55:13 2021, CB OH, Leak tests 20211031_155820.jpg
Found CARME at 2E-7.

Closed valve on top of roughing pump. Clamp was not tight. Pressure still good.

 
Entry  Wed Jul 19 08:17:26 2023, TD, Leak testing 
09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
      Leak tester c. 5e-12 mbar.l/s (leak tester valved off)
Entry  Tue Jul 4 17:08:08 2023, JM, Leak test and venting 20230704_135455.jpg20230704_174524.jpg
This morning the pressure achieved was 1.44E-7 mbar. Leak testing showed an overall leak rate of 1.5E-10 mbar l/s, this is below the previous leak rate
but still significantly above the leak rate from elog 141 of the CARME chamber on its own. Spraying helium, a leak is visible on the VAT gate valve on
the interaction chamber (inside of the ring). The leak rate increases to ~2.3E-10 mbar l/s. No increase in the leak rate was observed elsewhere on CARME
Entry  Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test 
Leak tested CARME via He leak tester + He 
bottle. No leaks could be found. Some 
indication of potential leak close to 
Entry  Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight  Screenshot_2024-01-08_09-56-20.png
Left bias in overnight. Leakage current decreased and stabilised. See attached. Bias off as we prepare to mount the fees.
Entry  Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 20211103_110244.jpg20211103_110414.jpg
Found CARME at 1.0E-6 mbar. Beginning leak test.

 

Found leaks in the same location as before. Roughly 1~3E-8 mbar l second vs. base leak of 1E-12
Entry  Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
22:30 Shift handed over. DAQ OK. Target OK. Beam OK.

 

00:22 Temperatures OK
Entry  Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg
Found strut bolts in the bag with 
spherical washers. Mounted the struts and 
the washers. See attach 1.
Entry  Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 20210903_154614.jpg20210903_162519.jpg
Attempted to mount cable clamps for strain 
relief on inner part of Allectra 
feedthroughs.
Entry  Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet 20211102_134446.jpg
Attempted to close CARME as carefully as possible.

Swapped out one foot for another one and temporarily removed a second to allow CARME to rotate slightly and get a better alignment of the two
surfaces of the COF600 flange.
Entry  Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
In order to install the detector supports 
and eventually install the detectors 
themselves CARME must be split and 
Entry  Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on vacplot24.pngvacplot.pngCARMEtemps.png
Found SIP power unit for D2000 #4 not functioning correctly. Max current regardless of ion element connected to.

 

ML kindly loaned a spare. All D2000 work Ok now. Will have to send faulty unit for repairs back to SAES.
Entry  Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far. 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt
Screenshots and ParamModi settings export attached.
Entry  Wed Mar 2 01:24:48 2022, David, George, Ion Source Update 
02:25
Zoran was unable to ignite the ion source.

He has given some parameters to the control room so they can wiggle stuff around and try and ignite it.
Entry  Sat Jan 15 11:28:10 2022, JM, Inventory 20220115_162649.jpg20220115_162712.jpg
 


Vaccum
DN250CF 1x gaskets     
DN200CF 5x gaskets  
DN160CF 1x gaskets, 2x blank flanges   
DN100CF 69x gaskets, 19x blank flanges, 14
double feedthroughs (1 damaged) 
DN63CF 3x gaskets, 2x blank flanges    
DN300CF 5x gaskets
DN350CF 0x gaskets
1X WIRE SEAL
DN35CF 3x gaskets, 13
Entry  Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg
Prepared to move interaction chamber in place. Ok CARME side, flange has M10 bolts. On interaction chamber side i.e. bellows it has M8 bolts.

DS designed this to have loose fit under assumption of  M10 side actually being 3/8 holes i.e. 9.9 mm. However holes are 10.2 mm. Furthermore
Grossmontage suggest loose fit will be damaged in baking in the long term.
Entry  Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar

12.10 Bakeout tent frame installed
Entry  Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump 
The turbo pump E1 is continuing to draw too much current and the rotation frequency has steadily decreased from 817 Hz at the beginning of the night
shift to 800 Hz now. The frequency recovered after the temperature was increased.

Both of the valves (inlet and dump) have been closed to improve the vacuum in the ring.
Entry  Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests 20230813_114600.jpg20230813_132550.jpg20230813_170829.jpg20230813_205613.jpg20230813_210238.jpg
12/08/23

Baking testing. Aim to find relationship between heater temperature setpoint and the temperature of the chamber and floating temperature in the
baking volume. Behaviour of the heater tempertures and ability to control the heating is also required. Ambient chamber temperature ~22 C. Interaction
Entry  Mon Feb 21 18:03:58 2022, SHB, JM, CB, OH (remotely), Info: signals on ion intensity for experiment 
Currently 4 possibilities to have a look at the beam, all of them are OK to check whether there is beam or not, but some of them are better for checking
absolute values.
- Schottky RF signal