AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 26 of 33
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
654 Entries
Goto page
Previous
1
,
2
,
3
...
25
, 26,
27
...
31
,
32
,
33
Next
ID
Date
Author
Subject
Text
156
Wed Nov 17 07:12:22 2021
RSS CB + ML (remotely)
CARME baking with tape continues 17 Nov
CARME baking with heating tape continues
Left overnight at -
Ch1-3: 140 degrees
7x
155
Tue Nov 16 12:05:13 2021
CB RSS
CARME baking with tape continues
CARME baking with heating tape continues
Left overnight at 100C. Turned
up this morning at 9:00 to 120C.
154
Fri Nov 12 08:54:11 2021
RSS ML + CB (remotely) NK AK NP
First CARME baking attempt
07:50 Small leaks (near the motors and
upper valve) were detected in the tent which
were covered with Al foil.
153
Thu Nov 11 14:01:00 2021
AK, ML
Heater channel layouts
Schematic layout of heaters and channel
assignment attached. Table kindly provided
by AK. I hope the conversion from excel to
151
Thu Nov 11 11:44:58 2021
RSS + ML OG + CB (remotely)
CARME baking started
With the help of OG, the baking tent was
built. MG started baking around 11:30 am
with a rate of 0.2 K/minute.
150
Wed Nov 10 18:38:16 2021
RSS TD + ML OG AK NK
CARME wrapped in heating tape
Heating and electronic experts were in
CRYRING and were unhappy with the damaged
wire. Heaters were opened by OG, but no damage
149
Wed Nov 10 18:24:12 2021
RSS
Thermocouple labelling
1. Detector
2. Chamber back
3. Strain relief
147
Wed Nov 10 14:41:12 2021
TD RSS + CB (remotely)
Wrapping CARME in heating tape
ML reports that baking of the upstream section
(gas jet interaction chamber plus e-target)
has commenced - initially to 50 deg C to
146
Tue Nov 9 15:03:29 2021
RSS + OG
Burnt cables issues
Upper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then
7x
145
Mon Nov 8 17:19:02 2021
RSS + OG
Neg and ion cables connected
Neg and ion pump cables were labeled and
connected.
Kapton tape wrapped around the
144
Sat Nov 6 14:21:10 2021
CB RSS
Preparation for bakeout tent mounting + to do for next week
Connected pneumatic hoses prepared by Gleb.
Opened flow to pressure reducer set at 2
bar. Ok. Attempted to operate pneumatic motors.
143
Fri Nov 5 12:27:11 2021
CB RSS + DR NP ML US
First pump down of YR09
Tightened all flanges.
Added Pirani gauge and third IE514
to interaction chamber.
142
Wed Nov 3 16:39:01 2021
CB RSS + NP DR NK ML
Interaction chamber lifted in place
Prepared to move interaction chamber in
place. Ok CARME side, flange has M10 bolts.
On interaction chamber side i.e. bellows
141
Wed Nov 3 11:18:11 2021
CB RSS + DR NK ML
Leak closed
Found CARME at 1.0E-6 mbar. Beginning leak
test.
140
Tue Nov 2 12:45:36 2021
CB + DR NK
Issues with CARME feet
Attempted to close CARME as carefully as
possible.
Swapped out one foot for another
139
Mon Nov 1 14:48:16 2021
CB + ML DR
CARME opened
Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak
138
Sun Oct 31 13:55:13 2021
CB OH
Leak tests
Found CARME at 2E-7.
Closed valve on top of roughing
pump. Clamp was not tight. Pressure still
137
Sun Oct 31 08:05:15 2021
CB OH + DR ML
CARME closed again + feedthroughs labeled
(Fri 29 October)
Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n
11x
136
Sun Oct 31 07:55:39 2021
CB JM + OH
Strain relief mounted
(Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk
135
Sun Oct 31 07:41:20 2021
CB JM + RSS
Wires plugged in DSSDs
(Wed 27 October)
Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation