AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 27 of 33
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
654 Entries
Goto page
Previous
1
,
2
,
3
...
26
, 27,
28
...
31
,
32
,
33
Next
ID
Date
Author
Subject
Text
134
Sun Oct 31 07:29:17 2021
CB JM + RSS OG
Detectors mounted on plate in CARME
(Wed 27 October)
Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
8x
133
Sun Oct 31 07:21:09 2021
CB JM RSS
Detectors arrived in GSI
(Tue 26 October)
Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
6x
132
Fri Oct 29 15:09:27 2021
CB JM + RSS OG DR
Preparation to mount new DSSDs
(Mon 25 October - Tue 26 October)
Considered different strategies
to mount DSSDs inside CARME, while waiting
6x
131
Sat Oct 23 12:58:11 2021
JM
GSI vacuum and bakeout testing summary
Attachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and
130
Fri Oct 22 13:22:48 2021
TD
CARME FEE64 adaptor PCB
10x
129
Fri Oct 22 13:11:26 2021
TD
MSL type TTT14 assembly drawings & pin assignments
128
Thu Oct 21 20:26:44 2021
JM TD
Thermocouple and Connector cables
NEG pump electrical connections tested
- all connections sound.
Detector carriers have been redrilled
10x
127
Mon Oct 18 16:25:11 2021
JM RSS TD
NEG rotation + cable removals
Kapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
126
Sun Oct 17 11:48:48 2021
TD RSS
Sunday 17 October
Looking downstream the RHS motor assembly
has loose green/yellow (gnd?) see attachment
1
14x
125
Sat Oct 16 17:25:47 2021
RSS TD
Broken detectors
One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already
124
Fri Oct 15 19:37:12 2021
RSS TD + DR
Friday 15 October
Ring seal is out. See picture 1.
Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
8x
123
Thu Oct 14 15:54:47 2021
TD RSS
Thursday 14 October
Attachment 1 - what is function of the 4x
c/s holes indicated?
122
Wed Oct 13 15:28:22 2021
RSS TD + OG
Split funnels
Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
7x
121
Wed Oct 13 15:16:12 2021
TD
Orientation of 2x 78 way D connector feedthroughs
Looking downstream
120
Wed Oct 13 12:06:09 2021
RSS TD
Flanges cleaned
RSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section
12x
119
Wed Oct 13 11:59:23 2021
TD
[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and
118
Tue Oct 12 13:54:21 2021
RSS TD + OD DR
CARME opened
With the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate
20x
117
Tue Oct 12 09:22:37 2021
RSS TD + OG DR
Motors problem solved
Neg and ion cables were taken off and were
put in the box.
Top support was taken off.
116
Mon Oct 11 11:24:16 2021
RSS TD ML
Valve support and cable labeling
Split funnels were given to Oemer for cleaning.
Have received them back after lunch.
Valve support is installed again
115
Sat Oct 9 09:47:33 2021
CB
To do list for next week
0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
Goto page
Previous
1
,
2
,
3
...
26
, 27,
28
...
31
,
32
,
33
Next
ELOG V3.1.4-unknown