ID Date Author Subject Text Attachments
  134   Sun Oct 31 07:29:17 2021 CB JM + RSS OGDetectors mounted on plate in CARME(Wed 27 October)

Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
 8x 
  133   Sun Oct 31 07:21:09 2021 CB JM RSSDetectors arrived in GSI(Tue 26 October)

Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
 6x 
  132   Fri Oct 29 15:09:27 2021 CB JM + RSS OG DRPreparation to mount new DSSDs(Mon 25 October - Tue 26 October)

Considered different strategies
to mount DSSDs inside CARME, while waiting
 6x 
  131   Sat Oct 23 12:58:11 2021 JMGSI vacuum and bakeout testing summaryAttachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and
 GSI_fullpumpdown.pngGSI_pumping.pngBakeout-elog.pngfit-elog.pngActivation-elog.png 
  130   Fri Oct 22 13:22:48 2021 TDCARME FEE64 adaptor PCB   10x 
  129   Fri Oct 22 13:11:26 2021 TDMSL type TTT14 assembly drawings & pin assignments   C-3434.pdfC-3517.pdf 
  128   Thu Oct 21 20:26:44 2021 JM TDThermocouple and Connector cablesNEG pump electrical connections tested
- all connections sound. 

Detector carriers have been redrilled
 10x 
  127   Mon Oct 18 16:25:11 2021 JM RSS TDNEG rotation + cable removalsKapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
 Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg 
  126   Sun Oct 17 11:48:48 2021 TD RSSSunday 17 OctoberLooking downstream the RHS motor assembly
has  loose green/yellow (gnd?) see attachment
1
 14x 
  125   Sat Oct 16 17:25:47 2021 RSS TDBroken detectorsOne of the detectors was damaged while
mounting (see pictures 1-3).

Second detector was found already
 IMG_5098.JPGIMG_5097.JPGIMG_5096.JPGIMG_5106.JPGIMG_5105.JPG 
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 OctoberRing seal is out. See picture 1.

Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
 8x 
  123   Thu Oct 14 15:54:47 2021 TD RSSThursday 14 OctoberAttachment 1 - what is function of the 4x
c/s holes indicated?
 IMG_5056.JPG.jpgIMG_5053.JPG 
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnelsSplit funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
 7x 
  121   Wed Oct 13 15:16:12 2021 TDOrientation of 2x 78 way D connector feedthroughs
Looking downstream
 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg 
  120   Wed Oct 13 12:06:09 2021 RSS TDFlanges cleanedRSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section
 12x 
  119   Wed Oct 13 11:59:23 2021 TD[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and 
 20211013_103806.jpg20211013_103800.jpg 
  118   Tue Oct 12 13:54:21 2021 RSS TD + OD DRCARME openedWith the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate
 20x 
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solvedNeg and ion cables were taken off and were
put in the box.

Top support was taken off.
 IMG_4971.JPGIMG_4970.JPG 
  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labelingSplit funnels were given to Oemer for cleaning.
Have received them back after lunch.

Valve support is installed again
 IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg 
  115   Sat Oct 9 09:47:33 2021 CBTo do list for next week0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
 Capture.PNG 