  46   Tue Aug 31 07:09:54 2021 CB RSS (rem) JMPreparation for mounting
(30 August 2021)

The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
will have to be mounted on CARME. Dismounting is scheduled for this Wed.

CB and RSS have been preparing for CARME to be mounted. JM supplied pictures of mounting process in DL. Attach 2-5.

2: Studs on carriages
3: CARME feet
4: Back foot
5: Elbows support

All components required have been located in the boxes except

- Cap hex bolts (M4 x 12?) to mount studs on carriages
- Plastic rails to remove cariages (a solution with bubble-wrap was found. Extra carriages are now in a box. Do
not turn it around.)
- Baking tray does not fit with carriages. Unclear how it did before. Will try to file down edges today.
- Bolts for CARME feet are of rather poor quality, and a host of different sizes. We may have to buy some, but
unclear what length.
- Studs are of different heights. That was not clear from previous pictures (attach 6)
- New and improved valve/elbow support (attach 7) is aligned worse than old one. Will keep using old one. Should
still work somehow.
Attachment 1: 20210830_110920.jpg
20210830_110920.jpg
Attachment 2: Al_frame.jpg
Al_frame.jpg
Attachment 3: 20200814_142437.jpg
20200814_142437.jpg
Attachment 4: 20200902_153219.jpg
20200902_153219.jpg
Attachment 5: 20210830_160613.jpg
20210830_160613.jpg
Attachment 6: 20210830_115903.jpg
20210830_115903.jpg
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21 08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00  0.0030   1.77e-8

----------------------------------------------------

27/8/21   08:00  0.0030   1.76e-8

----------------------------------------------------

28/8/21   17:30  0.0029   1.63e-8

----------------------------------------------------

30/8/21   08:00  0.0028   1.43e-8

----------------------------------------------------

31/8/21   08:30  0.0027  1.40e-8

Attachment 1: IMG_4349.JPG
IMG_4349.JPG
Attachment 2: IMG_4360.JPG
IMG_4360.JPG
Attachment 3: log_scale_26.08.png
log_scale_26.08.png
Attachment 4: turbo_pump_26.08.png
turbo_pump_26.08.png
Attachment 5: scroll_pump_26.08.png
scroll_pump_26.08.png
Attachment 6: IMG_4367.JPG
IMG_4367.JPG
Attachment 7: log_scale_27.08.png
log_scale_27.08.png
Attachment 8: IMG_4372.JPG
IMG_4372.JPG
Attachment 9: log_scale_28.08.png
log_scale_28.08.png
Attachment 10: IMG_4426.JPG
IMG_4426.JPG
Attachment 11: IMG_4427.JPG
IMG_4427.JPG
Attachment 12: log_scale_30.08.png
log_scale_30.08.png
Attachment 13: turbo_pump_30.08.png
turbo_pump_30.08.png
Attachment 14: scroll_pump_30.08.png
scroll_pump_30.08.png
Attachment 15: log_scale_31.08.png
log_scale_31.08.png
Attachment 16: turbo_pump_31.08.png
turbo_pump_31.08.png
Attachment 17: scroll_pump_31.08.png
scroll_pump_31.08.png
Attachment 18: IMG_4445.JPG
IMG_4445.JPG
Attachment 19: IMG_4446.JPG
IMG_4446.JPG
  44   Wed Aug 18 11:58:49 2021 NTD RSSMisc fittings and fasteners plus gasket inventory
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.


Inventory of silver-plated copper gaskets

             ID (cm)

7x DN250CF   25.4
5x DN200CF   20.0
5x DN160CF   15.3
100x DN100CF 10.0
4x DN63CF    6.3
16x DN35CF   3.5
23x DN16CF   1.6

N.B. ID is measured +/- 0.1cm and DNxxCF designation is what the Lesker catalogue says it means.

Attachments 4 & 9 2x motor rods and MACOR heat shields for cleaning

Attachment 5 - cable assemblies

Attachment 7 - what are these screws for?

 
Attachment 1: 20210818_113056.jpg
20210818_113056.jpg
Attachment 2: 20210818_111549.jpg
20210818_111549.jpg
Attachment 3: 20210818_111543.jpg
20210818_111543.jpg
Attachment 4: 20210819_162634.jpg
20210819_162634.jpg
Attachment 5: 20210819_163357.jpg
20210819_163357.jpg
Attachment 6: 20210819_163402.jpg
20210819_163402.jpg
Attachment 7: 20210819_163646.jpg
20210819_163646.jpg
Attachment 8: 20210819_163651.jpg
20210819_163651.jpg
Attachment 9: 20210819_164007.jpg
20210819_164007.jpg
Attachment 10: 20210819_164018.jpg
20210819_164018.jpg
Attachment 11: 20210819_164028.jpg
20210819_164028.jpg
Attachment 12: 20210819_164043.jpg
20210819_164043.jpg
Attachment 13: 20210819_164043.jpg
20210819_164043.jpg
Attachment 14: 20210819_164054.jpg
20210819_164054.jpg
Attachment 15: 20210819_164111.jpg
20210819_164111.jpg
Attachment 16: 20210819_164234.jpg
20210819_164234.jpg
Attachment 17: 20210819_164238.jpg
20210819_164238.jpg
Attachment 18: 20210819_164242.jpg
20210819_164242.jpg
Attachment 19: 20210819_164417.jpg
20210819_164417.jpg
Attachment 20: 20210819_164421.jpg
20210819_164421.jpg
Attachment 21: 20210819_164527.jpg
20210819_164527.jpg
Attachment 22: 20210819_164530.jpg
20210819_164530.jpg
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8

 

-------------------------------------------------------------

19/8/21  08:00  0.0032  3.38e-8

19/8/21  17:00  0.0032  3.31e-8

 

-------------------------------------------------------------

20/8/21  08:00  0.0032  3.02e-8

 

-------------------------------------------------------------

21/8/21  16:00  0.0032  2.59e-8

 

-------------------------------------------------------------

22/8/21  12:00  0.0034  2.44e-8

 

-------------------------------------------------------------

23/8/21  08:00  0.0030  2.23e-8

 

-------------------------------------------------------------

24/8/21  08:00  0.0030  2.15e-8

 

 

 

Attachment 1: IMG_4273.JPG
IMG_4273.JPG
Attachment 2: IMG_4274.JPG
IMG_4274.JPG
Attachment 3: log_scale_18.08.png
log_scale_18.08.png
Attachment 4: turbo_pump_18.08.png
turbo_pump_18.08.png
Attachment 5: scroll_pump_18.08.png
scroll_pump_18.08.png
Attachment 6: IMG_4281.JPG
IMG_4281.JPG
Attachment 7: log_scale_19.08.png
log_scale_19.08.png
Attachment 8: turbo_pump_19.08.png
turbo_pump_19.08.png
Attachment 9: scroll_pump_19.08.png
scroll_pump_19.08.png
Attachment 10: IMG_4290.JPG
IMG_4290.JPG
Attachment 11: IMG_4301.JPG
IMG_4301.JPG
Attachment 12: log_scale_21.08.png
log_scale_21.08.png
Attachment 13: turbo_pump_21.08.png
turbo_pump_21.08.png
Attachment 14: scroll_pump_21.08.png
scroll_pump_21.08.png
Attachment 15: IMG_4323.JPG
IMG_4323.JPG
Attachment 16: IMG_4324.JPG
IMG_4324.JPG
Attachment 17: log_scale_22.08.png
log_scale_22.08.png
Attachment 18: turbo_pump_22.08.png
turbo_pump_22.08.png
Attachment 19: scroll_pump_22.08.png
scroll_pump_22.08.png
Attachment 20: IMG_4339.JPG
IMG_4339.JPG
Attachment 21: IMG_4340.JPG
IMG_4340.JPG
Attachment 22: IMG_4345.JPG
IMG_4345.JPG
Attachment 23: log_scale_24.08.png
log_scale_24.08.png
Attachment 24: turbo_pump_24.08.png
turbo_pump_24.08.png
Attachment 25: scroll_pump_24.08.png
scroll_pump_24.08.png
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August
Pirani  IE514
mbar    mbar



13/8/21 08:00 0.0075 3.53e-7
13/8/21 12:00 0.0065 2.80e-7
13/8/21 15:20 0.0065 2.40e-7
13/8/21 16:30 0.0060 2.29e-7


---------------------------------


14/8/21 12:00 0.0046 1.25e-7
14/8/21 12:00 0.0044 1.14e-7


---------------------------------


15/8/21 09:00 0.0040 8.47e-8
15/8/21 12:30 0.0040 8.00e-8
15/8/21 15:30 0.0040 7.69e-8


---------------------------------


16/8/21 08:00 0.0038 6.36e-8
16/8/21 11:30 0.0036 6.14e-8
16/8/21 17:00 0.0036 5.82e-8


---------------------------------


17/8/21 08:00 0.0034 4.82e-8
17/8/21 17:00 0.0034 4.47e-8
Attachment 1: IMG_4196.JPG
IMG_4196.JPG
Attachment 2: IMG_4197.JPG
IMG_4197.JPG
Attachment 3: IMG_4198.JPG
IMG_4198.JPG
Attachment 4: scroll_pump_13.08.png
scroll_pump_13.08.png
Attachment 5: turbo_pump_13.08.png
turbo_pump_13.08.png
Attachment 6: IMG_4237.JPG
IMG_4237.JPG
Attachment 7: IMG_4238.JPG
IMG_4238.JPG
Attachment 8: turbo_pump_14.08.png
turbo_pump_14.08.png
Attachment 9: scroll_pump_14.08.png
scroll_pump_14.08.png
Attachment 10: IMG_4244.JPG
IMG_4244.JPG
Attachment 11: IMG_4245.JPG
IMG_4245.JPG
Attachment 12: turbo_pump_15.08.png
turbo_pump_15.08.png
Attachment 13: scroll_pump_15.08.png
scroll_pump_15.08.png
Attachment 14: IMG_4257.JPG
IMG_4257.JPG
Attachment 15: IMG_4258.JPG
IMG_4258.JPG
Attachment 16: turbo_pump_16.08.png
turbo_pump_16.08.png
Attachment 17: scroll_pump_16.08.png
scroll_pump_16.08.png
Attachment 18: IMG_4265.JPG
IMG_4265.JPG
Attachment 19: IMG_4266.JPG
IMG_4266.JPG
Attachment 20: turbo_pump_log_scale.png
turbo_pump_log_scale.png
Attachment 21: scroll_pump_17.08.png
scroll_pump_17.08.png
Attachment 22: turbo_pump_17.08.png
turbo_pump_17.08.png
Attachment 23: log_scale_17.08.png
log_scale_17.08.png
  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring diagram

Attachments 2 & 3 - IE514 feedthrough connected (cf https://elog.ph.ed.ac.uk/CARME/19 )

14:00 scroll pump start
14:30 turbo pump start
15:16 1.00e-5mbar
16:01 - attachments 4-8 basic vacuum test setup
        turbo @ 0.74A

              Pirani  IE514
              mbar    mbar

12/8/21 14:02 85
12/8/21 14:04 4.8
12/8/21 14:06 0.95
12/8/21 14:08 0.46
12/8/21 14:10 0.30
12/8/21 14:12 0.22
12/8/21 14:16 0.18
12/8/21 14:18 0.15
12/8/21 14:20 0.12
12/8/21 14:22 0.11
12/8/21 14:24 0.10
12/8/21 14:26 0.090
12/8/21 14:28 0.080
12/8/21 14:30 0.075
12/8/21 14:32 0.27
12/8/21 14:34 0.14
12/8/21 14:36 0.10
12/8/21 14:37:20    7.00e-5 
12/8/21 14:38 0.085 5.80e-5
12/8/21 14:40 0.080 4.61e-5
12/8/21 14:42 0.075 3.73e-5
12/8/21 14:44 0.075 3.14e-5
12/8/21 14:46 0.070 2.70e-5 
12/8/21 14:48 0.065 2.42e-5
12/8/21 14:50 0.065 2.16e-5
12/8/21 14:52 0.065 1.97e-5
12/8/21 14:54 0.060 1.81e-5
12/8/21 14:56 0.060 1.70e-5
12/8/21 14:58 0.060 1.57e-5
12/8/21 15:00 0.060 1.47e-5
12/8/21 15:02 0.055 1.39e-5
12/8/21 15:04 0.055 1.31e-5
12/8/21 15:06 0.050 1.26e-5
12/8/21 15:08 0.050 1.20e-5
12/8/21 15:10 0.050 1.14e-5
12/8/21 15:12 0.048 1.09e-5
12/8/21 15:14 0.046 1.04e-5
12/8/21 15:16 0.046 1.00e-5
12/8/21 15:18 0.044 9.65e-6
12/8/21 15:20 0.044 9.31e-6
12/8/21 16:00 0.032 5.28e-6

--------------------------------

13/8/21 08:00 0.0075 3.53e-7
Attachment 1: 20210812_101505.jpg
20210812_101505.jpg
Attachment 2: 20210812_101537.jpg
20210812_101537.jpg
Attachment 3: 20210812_101545.jpg
20210812_101545.jpg
Attachment 4: 20210812_160134.jpg
20210812_160134.jpg
Attachment 5: 20210812_160158.jpg
20210812_160158.jpg
Attachment 6: 20210812_160210.jpg
20210812_160210.jpg
Attachment 7: 20210812_160215.jpg
20210812_160215.jpg
Attachment 8: 20210812_160222.jpg
20210812_160222.jpg
Attachment 9: IMG_4196.JPG
IMG_4196.JPG
Attachment 10: IMG_4197.JPG
IMG_4197.JPG
Attachment 11: IMG_4198.JPG
IMG_4198.JPG
Attachment 12: scroll_pump.png
scroll_pump.png
Attachment 13: turbo_pump.png
turbo_pump.png
  40   Wed Aug 11 12:30:40 2021 TD RSSWednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
                    all 4x SAES D-2000 now re-fitted to chamber

Will now fit 1x turbo and blank (currently) unused turbo port.

Attachments 3 & 4 - centre 2x78 pin micro-D feedthrough has some pins slightly bent - can probably be safely bent back into position 

ALWAYS check 78-pin feedthroughs for bent/broken pins before fitting connectors/cabling

Attachment 5 - currently unused turbo port

Attachments 6 & 7 - turbo port from above and side

Attachment 8 - turbo + NW16/NW25 adaptor + NW25 s/s hose + scroll pump + turbo controller + CMS52 gauge controller

Note we currently do not have a vent valve or backing line vacuum gauge (both functions provided by leak detector at STFC DL).
Attachment 1: 20210811_132906.jpg
20210811_132906.jpg
Attachment 2: 20210811_132918.jpg
20210811_132918.jpg
Attachment 3: 20210811_132932.jpg
20210811_132932.jpg
Attachment 4: 20210811_132943.jpg
20210811_132943.jpg
Attachment 5: 20210811_142615.jpg
20210811_142615.jpg
Attachment 6: 20210811_142629.jpg
20210811_142629.jpg
Attachment 7: 20210811_142638.jpg
20210811_142638.jpg
Attachment 8: 20210811_153236.jpg
20210811_153236.jpg
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed at same ports used for STFC DL XHV tests
Attachment 1: 20210810_115555.jpg
20210810_115555.jpg
Attachment 2: 20210810_115607.jpg
20210810_115607.jpg
Attachment 3: 20210810_115617.jpg
20210810_115617.jpg
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING hall
                  XHV chambers nearest to YR09

Will remove top and sides of XHV chamber crate and install 4x SAES D-2000, 1x Leybold Mag Lev 400 turbo and 1x Leybold Ionvac IE514 gauge for basic vacuum test.

Attachments 6-7 - spare wire seals shipped from Edinburgh to GSI
                  poor packing and/or re-packing has resulted in bending of wire seals
                  wire seals shipped from STFC DL to GSI appear to be OK - see attachment 1
                  
Attachment 1: 20210809_132802.jpg
20210809_132802.jpg
Attachment 2: 20210809_132813.jpg
20210809_132813.jpg
Attachment 3: 20210809_132903.jpg
20210809_132903.jpg
Attachment 4: 20210809_132913.jpg
20210809_132913.jpg
Attachment 5: 20210809_133438.jpg
20210809_133438.jpg
Attachment 6: 20210809_145826.jpg
20210809_145826.jpg
Attachment 7: 20210809_145831.jpg
20210809_145831.jpg
  37   Mon Dec 7 14:29:12 2020 JMCARME packing up
Attachment 1: 20201207_122353.jpg
20201207_122353.jpg
Attachment 2: 20201207_113905.jpg
20201207_113905.jpg
Attachment 3: 20201207_110714.jpg
20201207_110714.jpg
  36   Fri Dec 4 16:49:36 2020 TDFriday 4 December
Attachment 1: 20201204_161412.jpg
20201204_161412.jpg
Attachment 2: 20201204_161400.jpg
20201204_161400.jpg
Attachment 3: 20201204_161354.jpg
20201204_161354.jpg
Attachment 4: 20201204_161348.jpg
20201204_161348.jpg
Attachment 5: 20201204_161340.jpg
20201204_161340.jpg
Attachment 6: 20201204_161313.jpg
20201204_161313.jpg
Attachment 7: 20201204_161259.jpg
20201204_161259.jpg
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39

CARME XHV chamber pressure 6.0e-12mbar
Backing 2.1e-08mbar (Edwards vacuum cart w/RGA)

CARME temps - heaters OFF - chamber at ambient 
temperature

All SAES D2000-10 & UHV1400 NEG power OFF
All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

Gate valve open

attachment 1 - analog RGA scan (as found this am)

attachment 2 - scan mode 

c. 11.15

AH partially closes gate valve using c. 2 bar air pressure

VCARME XHV chamber pressure increases c. 7e-9mbar immediately

attachment 3 - RGA scan - no obvious change in RGA trends!

attachments 4 & 5 - VAT valve indicators - upper (partially open/closed) and lower (closed)

11.33 CARME XHV chamber pressure 6.6e-9mbar
Backing 2.2e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All SAES D2000-10 ion pump OFF

11.40 CARME XHV chamber pressure 5.64e-9mbar

11.46 CARME XHV chamber pressure 5.01e-9mbar
No change in RGA trends!

12.01 CARME XHV chamber pressure 3.78e-9mbar
No change in RGA trends!

12.11 CARME XHV chamber pressure 3.10e-9mbar

12.42 CARME XHV chamber pressure 1.81e-9mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.20 CARME XHV chamber pressure 1.06e-9mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.36 CARME XHV chamber pressure 8.93e-10mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.59 CARME XHV chamber pressure 7.07e-10mbar
Backing 2.5e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

14.00 Leybold turbo OFF - decelerating

14.30 Leybold turbo OFF - decelerating - 466Hz
CARME XHV chamber pressure 5.62e-10mbar
Backing 2.1e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

14.40 1x SAES D2000-10 ion pump switched on briefly - settles in c. 10s - pressure < 8.9e-
12mbar
All 4x D2000-10 ion pumps OFF

15.01 Leybold turbo OFF - decelerating - 125Hz
CARME XHV chamber pressure 4.78e-10mbar
Backing 1.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

15.10 Abrupt increase in RGA trends - see attachment 6
Leybold turbo OFF - decelerating - 60Hz
CARME XHV chamber pressure 4.53e-10mbar
Backing 2.6e-08mbar (Edwards vacuum cart w/RGA)

15.19 4x SAES D2000-10 ion pumps ON
RGA record 04.24.00 

15.24 see attachment 7 - RGA transient recovering - turbo stopped?

15.10 Leybold turbo OFF - stopped - 0Hz
CARME XHV chamber pressure 4.40e-10mbar
Backing 1.1e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

16.10 VAT gate valve partially closed
Leybold turbo OFF - stopped - 0Hz
CARME XHV chamber pressure 3.88e-10mbar
Backing 9.8e-09mbar (Edwards vacuum cart w/RGA)
RGA traces recovered to pre-transient levels and stable

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12
Attachment 1: 20201125_104631.jpg
20201125_104631.jpg
Attachment 2: 20201125_110500.jpg
20201125_110500.jpg
Attachment 3: 20201125_111937.jpg
20201125_111937.jpg
Attachment 4: 20201125_111954.jpg
20201125_111954.jpg
Attachment 5: 20201125_112003.jpg
20201125_112003.jpg
Attachment 6: 20201125_151232.jpg
20201125_151232.jpg
Attachment 7: 20201125_152354.jpg
20201125_152354.jpg
  34   Tue Nov 24 12:24:01 2020 JMRGA scans

RGA laptop passcode: tw%11&STA-   

RGA scans set up and plotting data as of 11:44

RGA is set to the multiplier mode (4.44e-8mbar) with an accuracy setting of 8, these are for the most sensitive scans. RGA is set to scan masses 2, 12, 16, 18, 28, 32, 40 and 44 in the range 1e-9 to 1e-14mbar. Mass2=7.85e-11mbar,  Mass12=1.45e-12mbar,  Mass16=1.41e-11mbar,  Mass18=4.78e-10mbar,  Mass28=1.53e-11mbar,  Mass32=3.46e-12mbar,  Mass40 = 1e-14mbar,  Mass44= 3e-13mbar. Slight variability in each measurement is ver small for higher pressures and larger for lower pressures (see image attached). 

Plan is to switch each ion pump off individually and observe the effect on the RGA scans. Once off I will leave for 30 mins to see if any difference can be seen. Afterwards I will switch of 2 pumps then 4 pumps at a time. 

12:06 Ion pump 1 (furthest left pump=1, furthest right=4) turned off, no immediate change in RGA.

12:38 No change in RGA, turning pump 1 on again and switching off pump 2. Pump 1 took ~15s to stabilise back to a pressure of <8.9e-12mbar once turned on again. 

13:08 No change in RGA, turning pump 2 on again and switching off pump 3. Pump 2 took ~15s to stabilise back to a pressure of <8.9e-12mbar.  

13:38 No change  in RGA, turning pump 3 on again and switching off pump 4. Pump 2 took ~15s to stabilise back to a pressure of <8.9e-12mbar.  

14:08 No change in RGA, all pumps back ON. RGA has not changed since pumps wer switched off and on, pressure on the hot cathode gauge has risen slightly however I think this is due to the day/night cycle of the pressure. 

14:12 All 4 ion pumps turned off

15:12 No observable change in the RGA

15:33 Ion pumps all back ON. No change in RGA

Attachment 1: 20201124_124107.jpg
20201124_124107.jpg
  33   Tue Nov 10 12:25:29 2020 JMCable harnesses

The length of the wire needed was estimated with the aid of a scale image of the detectors in the CARME chamber and foam model pieces. Wire length estimated by simply cutting wire so that it 'fits' the scale model and by taking coordinates of the end points of the longest sections of wire needed on the model and calculating a bezier curve to estimate wire length. Bezier curve calculated by inputting the endpoints of the wire and control points such that the wire comes out of the connector at the specified angle in the scale diagram. Figure 1 shows the bezier curve (orange), distance between the endpoints (green) and the control point plot. The length of wire required by the bezier curve is approximately that of cutting wire to fit the scale model. 

Two groups of harnesses are needed to be built, a short section which correspond to the top and bottom of the detectors, and longer sections needed for the sides of the detectors. Lengths of these wires is;

Short: 225 mm

Long: 285 mm

Wire is cut to length using a circular object with the required circumference. Wire is wrapped round the object and cut to give required length. Wire is then stripped, crimped and inserted into the connectors with the correct pin assignment. Inserting wire into connectors acts as a good quality check, as incorrectly crimped wires will not fit into connectors. Crimp is set to setting 12 for the male crimps and 10 for the female crimps. Wire stripper has to be cleaned of stripped ends often as it is liable to jam and wire must be inserted into stripper straight, else strip will clip some of the conductors in the wire. 

As of 9/11/20 two harnesses (1 long, 1 short) have been constructed. 

8 harnesses constructed and sent to DAresbury for cleaning 20/11/20

Attachment 1: 20201102_155336.jpg
20201102_155336.jpg
Attachment 2: Figure_1.png
Figure_1.png
Attachment 3: 20201102_154648.jpg
20201102_154648.jpg
Attachment 4: Photos.zip
  32   Thu Oct 29 08:02:29 2020 CB, JM (remotely)CARME pressure
Attached is the temperature plot for bakeout period including tags for NEG activation etc.

28 October -> 27 November
--->See shared Excel document for CARME pressure values<---
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EbaoBvhq8zFFtmuakXKjQWQBTqjjzilT6lk9BmchoxlMNQ?e=XU8DzE

 
30 October
07:30 Baking code has been shut down, we have no log of the temperatures. Restarted (T=0)
19:40 Pressure back in the E-12 mbar range.

31 October
08:47 Back in the low E-11 mbar range. See temperature plot attached.
15:57 Back in the E-12 mbar range.

1 November
12:30 Pressures updated. Temperature plot updated.

2 November
08:52 Pressure reached E-10 mbar overnight, now back in the E-12 range.
Temperature increasing. See attached.

3 November
08:37 Pressure stable in the E-12 mbar range.
15:36 Pressure mostly stable in the E-12 mbar range
17:30 KM reports re-arranging the mains power connection to borrow an extension reel. No obvious effects on pressure.
18:24 Pressure stable in the E-12 mbar range. Updated temperature plot.

4 November
08:39 Pressure stable in the E-12 mbar range.
Temperature plot updated.
19:31 Pressure mostly stable around 5E-12 mbar

5 November
10:26 Pressure stable in the E-12 mbar range.

6 November
12:26 Pressure stable in the E-12 mbar range. 

7 November
11:50 Pressure stable in the E-12 mbar range.
Temperature plot updated.

8 November
20:39 Pressure increasing again. Now in 1E-11 mbar range

9 November
08:50 Pressure returned to E-12 mbar range.
Temperature plot updated
16:51 Pressure fluctuating around 7E-12 mbar range.

10 November
09:04 Pressure oscillating in the 7E-12 mbar range

11 November
08:27 Pressure mostly stable in the 5E-12 mbar range

12 November
08:21 Pressure mostly stable in the 5E-12 mbar range

13 November
08:29 Pressure increased suddenly to 7E-9 mbar yesterday at 14:00, from 6.5E-12 mbar. Was the valve closed? (Confirmed
by KM)
Pressure appears to be slowly recovering. Currently in the low E-10 mbar range.
Temperature plot updated.

15:40 Pressure does not appear to drop. Currently stable around 2E-10 mbar

18:10 KM reports Ion pumps have gone off (tripped by high pressure?)
IE514 gauge still reading 1E-10, but SAES D2000-10 ion pressure gauge reading 1E-12.
Someone will check tomorrow in person.

14 November
08:13 Pressure stable in the 2E-10 mbar range. Does not appear to decrease.

15 November
08:24 Pressure stable in the 2E-10 mbar range

16 November
08:23 Pressure increased to 1E-9 mbar (potentially due to heating being turned on at week start).

17 November
08:18 Pressure back in the E-12 mbar range since yesterday afternoon.
Change was sudden and CM52 control module appears to have been moved in-between. 
Unclear what was done locally.

18 November
08:40 Pressure mostly stable in the 5E-12 mbar range.

19 November
07:55 Pressure remains stable in the E-12 mbar range.
Temperature plot updated

20 November
08:00 Pressure remains stable in the E-12 mbar range.

21 November
14:16 Pressure remains stable in the 5E-12 mbar range.

22 November
08:08 Pressure remains stable

23 November
08:24 Pressure remains stable

24 November
08:05 Pressure remains stable
See ELOG entry by JM

25 November
See ELOG entry by TD.
Valve partly closed.

26 November
08:58 Pressure in the E-10 mbar range, very slowly decreasing

27 November
21:07 Pressure stable in the 2E-10 mbar range. Does not appear to be decreasing

28 November
17:49 Pressure stable in the 2E-10 mbar range.
Attachment 1: 20201029_080001.jpg
20201029_080001.jpg
Attachment 2: Bakeout_pump_down.png
Bakeout_pump_down.png
Attachment 3: 20201119_temps.png
20201119_temps.png
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32

CARME chamber 5.8e-12mbar (see attachment 1)
Backing 1.6e-08mbar (Edwards vacuum cart w/RGA)

CARME temps - see attachment 2

All SAES D2000-10 & UHV1400 NEG power OFF
All SAES D2000-10 ion pump OFF
Gate valve open

11.01

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012/5019  4-8e-11
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

11.04

CARME chamber 5.7e-12mbar
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

12.12

CARME chamber 5.3e-12mbar
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 & UHV1400 NEG power OFF
Gate valve open
All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All ion pumps now stabilising wrt V/I/pressure

log (pressure) versus time - see attachment 3

16.00

CARME chamber 4.9e-12mbar - see attachment 4
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 & UHV1400 NEG power OFF
Gate valve open
All SAES D2000-10 ion pump ON - see attachment 5

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All ion pumps now stabilising wrt V/I/pressure

CARME temps - see attachment 6

Observing pressure transients from 5e-12mbar to c. 6-7e-12mbar which recover in c. 5-10 minutes 

21.00 CARME chamber 4.7e-12mbar
Attachment 1: 20201028_103204.jpg
20201028_103204.jpg
Attachment 2: 20201028_103638.jpg
20201028_103638.jpg
Attachment 3: 28102020_pump_down.png
28102020_pump_down.png
Attachment 4: 20201028_161049.jpg
20201028_161049.jpg
Attachment 5: 20201028_155823.jpg
20201028_155823.jpg
Attachment 6: 20201028_155940.jpg
20201028_155940.jpg
  30   Mon Oct 26 10:35:05 2020 JM, CB(remotely)Cooling

10:10 Pressure on the chamber = 3.1e-8mbar. RE-72 temperatures are ~120-125C with set limits at 80C. D2000 temperatures are ~370C. D2000's reduced from 60W to 30W and all UHV 1400s reduced to 50W each to cool both the chamber and the D2000s so that ion pumps can be activated. 

10:38 Pressure on the chamber = 1.7e-9mbar. Re-72 temperatures begining to fall and are currently ~117-122C. D2000 temperatures are ~290C.

11:05 Pressure on chamber = 1.1e-9mbar. RE-72 temperatures are ~114-118C. D2000 temperatures ~275C.

11:42 Pressure on chamber = 9e-10mbar. RE-72 temperatures are ~109-113C. D2000 temperatures ~230C. Power in the D2000s reduced to 10W each to speed up cooling. 

13:02 Pressure on chamber = 3e-10mbar. RE-72 temperatures are 100-103C. D2000 temperatures ~200C.  Power in the UHV 1400s reduced to 25W to speed up cooling. Total heating power is now 325W from the UHV1400s and 40W from the D2000s.

14:11 Temperature plot attached.

15:40 Pressure on chamber = 1.2e-10mbar. RE-72 temperatures are ~80-84C with the heaters starting to control temperature of the bakeout. D2000s temperatures are ~150C. I will leave things as they are to let temperatures reach equillibrium overnight. 

27 October

08:00 Temperature stable. See attached.

08:30 Pressure on chamber = 1.2e-10mbar. D2000s temperatures are 150C, have turned them off to cool to below 80C

09:35 Pressure on chamber 1.18e-10mbar. D2000s temperatures are 110C. Bakeout set point reduced to 0C and neg elements switched off. Ion pumps set up and will be activated when D2000 temperatures are below 80C.

Settings on the ion pump have been left to default, except for the ramp rate which has been reduced to 1s from 10s as we are only flashing pumps for a short period of time, and the conversion factor which is set to 150A/torr for D2000 pumps. 

10:50 Pressure on the chamber = 7.53e-11mbar. D2000 temperatures at 80C. Gate valve was closed leading to an increase in pressure up to the high -9 / low -8 mbar range. Conclusion at the time was that the UHV1400s were still too hot and thus outgassing at such a rate that caused the large pressure increase. Once the valve was opened again, the pressure dropped to the mid -11 range again. Gate valve has been found to have been installed upside down, this may also contribute to the pressure increase. Due to low pressure on the backing line and neg pumps cooling which will increase pumping power we may not have to close the valve to reach the -12 mbar range however. 

After speaking with Keith, valve being installed upside down shouldn't pose any significant difference to obtainable pressure, however would be good to install properly at next chance. 

11:45 Pressure on the chamber = 5.55e-11mbar. D2000s temparatures are 75C. Ion pumps activated for first flash of 30s pumping. 

11:55 Pressure on the chamber =5.44e-11mbar. Ion pumps flashed for the second time. Pressure given inside 3 ion pumps reached the minimum of 8.9e-12mbar, 4th pump registered 1.3e-10mbar. 

13:24 Pressure on the chamber = 4.02e-11mbar. Ion pumps flashed for the third time. Pressure inside ion pumps was the same as last flash. 

15:40 Pressure on chamber = 2.88e-11mbar

Find attached plot of pressure (mbar) against time for the pump down from 10:11 on 27/10/20. It looks like negs may have cooled enough to begin pumping nearer the end of the day where the rate of pumping speed appears to increase.

 

Attachment 1: Screenshot_from_2020-10-26_14-10-08.png
Screenshot_from_2020-10-26_14-10-08.png
Attachment 2: 20201027_0803_temps.png
20201027_0803_temps.png
Attachment 3: 27102020_pump_down.png
27102020_pump_down.png
Attachment 4: 27102020_pump_down.png
27102020_pump_down.png
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activation
Thu 22 October

22:15 Temperatures stables, slowly decreasing.
Bump - rising front corresponds to heaters turned on. Falling front to D2000 turned off?
See attached.

Fri 23 October
09:57 Temperatures stable. See attached.
13:09 Temperatures remain stable. No significant changes.

Sat 24 October
21:27 Temperatures stable. See attached.

Sun 25 October
*Daylight saving is in effect. Time on the Raspberry Pi is no longer incorrect*
07:57 Temperatures stable. See attached.
19:05 Temperatues mostly stable. See attached. Will leave overnight and move setpoint to 80 C early tomorrow morning

Mon 26 October
07:37 Temperatures mostly stable. See attached. Setpoint to 80 C.
Attachment 1: 20201022_2214.png
20201022_2214.png
Attachment 2: 20201023_0957.png
20201023_0957.png
Attachment 3: 20201024_2117.png
20201024_2117.png
Attachment 4: 20201025_0757.png
20201025_0757.png
Attachment 5: 20201025_1905.png
20201025_1905.png
Attachment 6: 20201026_70736_temps.png
20201026_70736_temps.png
Attachment 7: 20201026_0736_ctrl.png
20201026_0736_ctrl.png
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40

CARME chamber 2.84e-08mbar
Backing 1.2e-7mbar (Edwards vacuum cart w/RGA)

CARME temps - see attachment 1
vessel 146.62 deg C max diff 21.42 deg C
octagon 27.85 deg C max diff 6.35

SAES HV power modules - see attachments 2-12

14.00

CARME chamber 2.78e-08mbar

Start 4x SAES D2000-10 *NEG* pumps (ion pump OFF) - see attachments 13-18

Ramp 45 mins
Hold 60 mins
225W/550deg C

NEG pumps report temps c. 130 deg C

14.15 ramp

CARME chamber 2.0e-07mbar
Backing 3.3e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 230-250 deg C

14.30 ramp

CARME chamber 2.34e-07mbar
Backing 4.1e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 330-350 deg C

14.45 ramp

CARME chamber 4.02e-07mbar
Backing 4.1e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 450-455 deg C

15.00 hold

CARME chamber 4.56e-07mbar
Backing 5.7e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 500-505 deg C
output c. 50V, c. 3A, c. 150W

15.20 hold

CARME chamber 4.40e-07mbar
Backing 5.1e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 530-540 deg C
output c. 160-170W

15.40 hold

CARME chamber 3.46e-07mbar
Backing 4.3e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 540-545 deg C
output c. 160-170W

15.50 cycle complete

Ramp 45 mins
Hold inf mins
set output 60W

re-start CARME bakeout
set point +120 deg C

15.55 ramp

CARME chamber 5.15e-08mbar
Backing 1.4e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 350-360 deg C

16.15 ramp

CARME chamber 4.53e-08mbar
Backing 1.5e-07mbar (Edwards vacuum cart w/RGA)
NEG pump temps c. 260-270 deg C

16.17 CARME chamber temperatures - attachment 20
Attachment 1: 20201022_104309.jpg
20201022_104309.jpg
Attachment 2: 20201022_104331.jpg
20201022_104331.jpg
Attachment 3: 20201022_104339.jpg
20201022_104339.jpg
Attachment 4: 20201022_104345.jpg
20201022_104345.jpg
Attachment 5: 20201022_104354.jpg
20201022_104354.jpg
Attachment 6: 20201022_104354.jpg
20201022_104354.jpg
Attachment 7: 20201022_104412.jpg
20201022_104412.jpg
Attachment 8: 20201022_104415.jpg
20201022_104415.jpg
Attachment 9: 20201022_104419.jpg
20201022_104419.jpg
Attachment 10: 20201022_104427.jpg
20201022_104427.jpg
Attachment 11: 20201022_104431.jpg
20201022_104431.jpg
Attachment 12: 20201022_104434.jpg
20201022_104434.jpg
Attachment 13: 20201022_135913.jpg
20201022_135913.jpg
Attachment 14: 20201022_135921.jpg
20201022_135921.jpg
Attachment 15: 20201022_135926.jpg
20201022_135926.jpg
Attachment 16: 20201022_135930.jpg
20201022_135930.jpg
Attachment 17: 20201022_135935.jpg
20201022_135935.jpg
Attachment 18: 20201022_135942.jpg
20201022_135942.jpg
Attachment 19: 20201022_161737.jpg
20201022_161737.jpg
  27   Mon Oct 19 13:57:52 2020 JMNeg Activation

Neg and Neg-Ion pumps have been connected up to the control modules. Controller on the right is connected to the D-2000s. Middle controller is connected to the wall section negs (1x2negs in series and 1x3negs in series) and the moving detector negs (2x2 negs in series). Left controller is connected to the intermediate section negs (2x2 negs in series). Must connect IN/OUT interface on the back of the controller or the alarm for an open circuit is triggered. When no thermocouple is connected Tmax must be set to zero otherwise the thermocouple alarm is triggered.

13:00 Pressure on chamber= 6e-9mbar

13:55 I have begun ramping up the middle controller. Ramp time is 45 minutes, slightly longer than the recommended 15-30 mins in the manual to see how well vaccum reacts.  Controller will hold maximum power for one hour for activation. Controller has 4 outputs, one for each neg cable. Outputs 1-3 are the 2 negs in series, output 4 is the 3 negs in series. Parameters for outputs 1-3 are; Vmax=100V, Imax=5A, Pmax= 400W. Parameters for output 4 are; Vmax=110V, Imax=5A, Pmax=600W. 

14:05 Pressure chamber = 1.92e-6mbar. Power per output is 60, 78, 79, 87 W. 

14:15 Pressure chamber = 2.4e-6mbar. Power per output is 114, 148, 150, 168 W.

14:25 Pressure chamber = 1.44e-6mbar. Power per output is 201, 261, 264, 300W.

14:35 Pressure chamber =  1.12e-6mbar. Power per output is 305, 398, 397, 466W

14:56 Pressure chamber = 1.52e-6mbar. Negs are on max power and are holding for an hour.

15:45 Intial activation completed. Negs have been set to half power to maintain temperature at ~200-250C. Parameters set for outputs 1-3; Vmax= 50V, Imax=5A, Pmax=200W. Parameters set for output 4; Vmax=70V, Imax=5A, Pmax=300W. Pressure on the chamber is now 4.4e-8mbar. The pressure tomorrow morning should tell us if the activation has been successful, afterwhich I will activate the next lot of negs. Average vessel temperature is now 146C. I believe our 'internal thermocouple' isn't reading the internal temp after all and is just the temperature of the bottom feedthrough flange, as its temp maxed out at 175C and followed a similar gradient to the other vessel thermocouples.  See attached temperature plot.

20 October

08:30 Pressure on the vessel = 2e-8mbar. Pressure hasn't dropped significantly probably due to negs maintaining a temperature of 200-250C causing significant outgassing. Chamber temperature has maintained at 145C so outgassing from chamber will also have increased also. 

08:45 2nd set of negs activated. Intermediate chamber negs activated (2x 2 negs in series) which are connected to outputs 3+4 on the left controller. Parameters for outputs; Vmax=100V, Imax=5A, Pmax=400W, Rise time= 30mins, Hold = 60mins. 

First set of negs remains at half power. 

Pressure on the vessel =8e-8mbar

08:55 Pressure on vessel = 1e-6mbar. Outputs; V=74, 74W I=2.2, 2.2A P=79, 79W

09:05 Pressure on vessel = 2.2e-7mbar. Outputs; V=58,58V I=3,3A P=175,175W

09:10 Pressure on vessel = 3e-7mbar. Outputs are; V=79,79V I=3.7A P=300,300W.

09:20 Pressure on vessel = 1.2e-6mbar. Outputs are; V=100V, I=4A, P=400W. Negs are now on hold for the hour activation. Chamber temperatures are stable at ~145C still

10:45 Negs are being held at half power to maintain temperature. All that is left is the D2000's on Thursday. Pressure in the vessel is staying constant at ~8e-8mbar. Chamber temperatures ae stable at ~145C. 

 

 