  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21
08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00 
 19x 
  44   Wed Aug 18 11:58:49 2021 NTD RSSMisc fittings and fasteners plus gasket inventoryAttachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal
 22x 
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8


 
 25x 
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August Pirani  IE514
mbar    mbar
 23x 
  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
 13x 
  40   Wed Aug 11 12:30:40 2021 TD RSSWednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted
to side ports
 8x 
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
 20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg 
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
 7x 
  37   Mon Dec 7 14:29:12 2020 JMCARME packing up   20201207_122353.jpg20201207_113905.jpg20201207_110714.jpg 
  36   Fri Dec 4 16:49:36 2020 TDFriday 4 December   7x 
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39
 7x 
  34   Tue Nov 24 12:24:01 2020 JMRGA scansRGA laptop passcode: tw%11&STA-
  

RGA scans set up and plotting data
 20201124_124107.jpg 
  33   Tue Nov 10 12:25:29 2020 JMCable harnessesThe length of the wire needed was estimated
with the aid of a scale image of the detectors
in the CARME chamber and foam model pieces.
 20201102_155336.jpgFigure_1.png20201102_154648.jpgPhotos.zip 
  32   Thu Oct 29 08:02:29 2020 CB, JM (remotely)CARME pressureAttached is the temperature plot for bakeout
period including tags for NEG activation
etc.
 20201029_080001.jpgBakeout_pump_down.png20201119_temps.png 
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32
 6x 
  30   Mon Oct 26 10:35:05 2020 JM, CB(remotely)Cooling10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are
 Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png 
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activationThu 22 October

22:15 Temperatures stables, slowly decreasing.
 7x 
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40
 19x 
  27   Mon Oct 19 13:57:52 2020 JMNeg ActivationNeg and Neg-Ion pumps have been connected
up to the control modules. Controller on
the right is connected to the D-2000s. Middle
 Photos.zip20201019_154921.jpg 
  26   Mon Oct 12 10:49:36 2020 JMFirst Bakeout of CARME with pumps (cont)12 October 

10:00 Bakeout temperatures stable.
Pressure on the backing line is 3e-7mbar
 temp6.png 