AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 28 of 38  ELOG logo
Entry  Tue Jun 17 12:14:30 2025, EW, CB, AG, Run 93- Background with beam 150keV Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png
Run 93- New run at 150keV, background with beam

13:15 All checks ok
Entry  Wed Jul 9 11:21:14 2025, EW, CB, CARME restarted - long background R98 32x
---9 July---

11:00

Turned detectors on - all stable see attachment 1 
Entry  Tue Jun 17 08:04:09 2025, EW, AG, CB, Run 92- Background with beam 90keV Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png
Run 92- started at 09:00, background with beam

Same settings as run 91

See attachments for rates etc
Entry  Mon Jun 2 16:35:35 2025, EW, AG, Run 42 and scraper tests Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png
17:00

Scraper tests conducted. We tried moving in the scrapers both at a fixed position throughout and also moving with the injection cycle.

We were unable to find a good position with the scrapers that did not produce significant scattering in the detectors.
Entry  Mon May 26 08:56:56 2025, EM,LB, Run20 8x
Run 20 running

We start a new run since the laser guys will do some measurements.

Zoran will increase the beam intensity
Entry  Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
7:00

Cooler voltage setpoint 247.4 V.

 
Entry  Sun Jun 8 11:55:00 2025, EM, PC, JM, CB, EW, AY, CB, PJW, YuL, Run 58,59,60, 61 50x
12:52 

Started Run 58 - Beam energy 200 keV/u.

Slow comparator threshold set to 0xc (130 keV) for all channels. Fast discriminators turned OFF for all channels by setting enable mask in discrinator
Entry  Sun Jun 8 09:07:22 2025, EM, PC, JM, Run56 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png
NOTE: RunR55 is missing

Run56: Background run with 250 keV/u. Target off using the usual procedure.

All  checks ok!
Entry  Sun Jun 8 10:05:30 2025, EM, PC, JM, Run57 
11:06

Run during beam change. We will go down to 200 keV/u

All the checks are ok.
Entry  Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
16:30

NOTE: Pulser is ON!

Check Leakage current: (see attachment 1)
Entry  Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
We start a new run with real data taking condititon: beam is ok, target density is 1e12 cm-2, detectors are moving in-out periodically.

 

Cooler voltage setpoint 1066.6 V. Read value 1068 V.
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.
Entry  Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
15:30

Merger OK, Tape server OK

ADC data item statistics OK
Entry  Sat Jul 5 08:51:33 2025, EBM, anydesk connection settings anydesk_settings.png
 
Entry  Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem 
At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5.
Entry  Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.48 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 19:28:35 2022, David, Yuri, vacuum 
At 19:10 Frank called us that vacuum in sections 08 and 10 got worse by about 1.5 times. There is a possible danger that vacuum valves can get closed
if rest gas pressure is above the set treshhold.

Nikos warmed the cryostat by 0.5 degrees from 129.0 K to 129.5 K and the pressure became better than before. We cooled the system in steps of
Entry  Tue Feb 22 20:08:40 2022, David, Yuri, Current status 2022-02-22_21-14-23exrate.png2022-02-22_21-14-01xytotal.png2022-02-22_21-13-11extotal.png
Recently the pressure started to raise a bit, we have increased the temperature from 129.1 K to 129.2 K. Current pressure at S1 2.10e-7.

Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current
Entry  Tue Feb 22 21:09:39 2022, David, Yuri, Current status 2022-02-22_22-12-55xytotal.png2022-02-22_22-12-21exrate.png2022-02-22_22-12-00extotal.png
Pressure seems as before 19:10.

Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.47 uA , stable current
ELOG V3.1.3-7933898